防喷器吊移装置

BOP Handling System

完工文件
As-built Documentation
合同号(Contract): 2016-0201
设备包号(Tag №):
图 号(Dwg №)
:FY-60Y
出厂编号(Serial №):16-03-12
文件编号(№)

宝鸡市工程液压件厂
Baoji Engineering Hydraulic Components Plant
2016 年 3 月
FY-60Y 防喷器吊移装置文件目录
FY-60Y BOP Handling System file directory

(16-03-12)
文 件 名 称 数 量
(File Name) (Quantity)
FY-60Y 防喷器吊移装置合格证 4 份/4Pcs

FY-60Y BOP Handling System certification

FY-60Y 防喷器吊移装置钢丝绳合格证、检测报告 4 份/4Pcs

FY-60Y BOP Handling System wire rope certificate and test report

压力表合格证 4 份/4Pcs

Pressure gauge certificate

FY-60Y 防喷器吊移装置出厂试验记录 4 份/4Pcs

FY-60Y BOP Handling System EX-factory test record

FY-60Y 防喷器吊移装置推荐备件明细表 4 份/4Pcs

FY-60Y BOP Handling System recommended spare parts list

FY-60Y 防喷器吊移装置装箱单 4 份/4Pcs

FY-60Y BOP Handling System packing list

FY-60Y 防喷器吊移装置使用说明书 4 份/4Pcs

FY-60Y BOP Handling System operation manual

FY-60Y 防喷器吊移装置维修手册 4 份/4Pcs

FY-60Y BOP Handling System maintenance manuals


FY-60Y Blowout Preventer (BOP) Handling System

Operation and Maintenance Manual

Baoji City Engineering Hydraulic Parts Factory


version stamp:160221

1
Brief Introduction
Baoji City Engineering Hydraulic Parts Factory is a professional manufacturer in
the field of hydraulic products and hydro-mechanical products. It owns more than 200
employees, over 110 sets main devices and many kinds of special equipment for
manufacturing hydraulic products. Established more than 20 years, we exist by quality,
guide by market, develop by innovation and aim at requirements of customer. We
have cooperated with some universities and scientific research institutions and have
developed various hydraulic and pneumatic cylinder, high-pressure and
medium/low-pressure hydraulic system, hydraulic power unit, hydraulic driving and
air-operated BOP device, hydraulic disc-brake device, hydraulic cathead, rotating
cathead, hydraulic damping device, hydraulic winch, hydraulic rope roller, hydraulic
hoister, rig moving device, hydraulic test platform and cantilever crane etc. We can
also design and manufacture various hydraulic components, hydraulic system and
hydraulic machinery according the customer’s requirements. Our products are widely
used in the field of petroleum, railway, mine, metallurgy, coal and machine tool etc.
Our products, especially the equipments developed for petroleum exploitation, have
been sold from onshore to offshore, from home to overseas, and have been exported
to more than twenty (20) countries and areas in Asia, Africa, America, such as U.S.A,
Iran, Canada, India, Egypt, Algeria, Venezuela, Kazakhstan etc.
We have passed through ISO9001 Quality System Authentication from China
ISO9001 International Certification Center for Quality System. One product was
awarded with API authentication of U.S.A. Some products have passed through ABS
inspection of U.S.A and CCS inspection of China and were awarded with Inspection
Certificate.
Our Factory was titled as a “Faithful to Contract and Loyal to Customer
Enterprise” by administration for Industry and Commerce and authorized as a “A
Class Taxpayer” by the State Taxation Bureau&Local Taxation Bureau.
Our Factory has awarded with more than ten (10) national patent certificates.
Many products have owned proprietary intellectual property rights.

Warmly welcome to our Factory and cooperating with us in any form.

2
Contents

Brief Introduction --------------------------------------------------------------1

1、Profile ------------------------------------------------------------------------3

2、Type and Specifications ------------------------------------------------- 3

3、Structure and Features-------------------------------------------------- 4

4、Installation and Test------------------------------------------------------4

5、Operation, Maintenance and Safety--------------------------------- 5

6、Spare Parts List ----------------------------------------------------------6

7、Attached Drawings ------------------------------------------------------7

3
1. Profile
FY-60Y Blowout Preventer (BOP) Handling System is designed to meet requirement of
installing and removing BOP stacks. The system is full-hydraulic control and can be used for
heavy and medium duty drilling equipment. The main function of system is to lift and install
single BOP or BOP stacks. The system features with explosion-proof, easier operation, better
reliability, and safety. It consists of left and right BOP moving device (each hung on one guide rail
below drill floor), hydraulic control box, pipelines, and hose hangers. Controlled by hydraulic
operating box, the system can achieve the movement of rising, lowering, moving forward and
backward synchronously, or moving forward and backward asynchronously,And the actions of
lifting, lowering, respectively, moving forward。It is convenient for installing and removing BOP
stacks.

2. Type and Specifications


2.1 FY-60Y BOP Handling System mainly consists of left / right handling
devices and hydraulic system.
2.2 FY-60Y BOP Handling System is powered by hydraulic power station for
floor mechanical tools (i.e. power tongs) of drilling rig.
2.3 FY-60Y BOP Handling System is easier to assemble and disassemble. All
hydraulic hoses adopt snap joints (completed with dust-proof plugs or caps) as
connections. It not only makes it easier to assemble and disassemble system but also
keep inner hoses clean.
2.4 Technical Specifications
2.4.1 Max. Lifting Capacity: 2×300=600kN
2.4.2 Max. Lifting Stroke: 4m
2.4.3 Lifting Speed: 0~1.5m/min
2.4.4 Dropping Speed: 0~3m/min
2.4.5 Moving Speed : 0~12m/min
2.4.6 Max. Working Pressure: 18MPa
2.4.7 Max. Working Displacement: 120L/min
2.4.8 Dia. of Wire Rope: φ28mm

3. Structure and Features


3.1 FY-60Y BOP Handling System is combined by two single lifting devices which
each hung on guide rail below the drill floor. One device can lift maximum 300kN

4
load and 600kN for two
3.2 The system adopts 3 times stroke scale-up structure which features with shorter
cylinder stroke, bigger lifting height. Compared with other same lifting height BOP
handling system, it has lighter weight and compact volume
3.3 This BOP Lifting & Moving Device is built into wholly hydraulic ctrl. Each lifting
device consists of moving mechanism, lifting mechanism and hydraulic system etc.
3.4 The BOP crane shift device through a control box can be completed:
a lifting and lowering at the same time.
b move forward and backward at the same time.
c Separately lifting, lowering.
d Separately forward, backward.
3.5 By full hydraulic control, it features higher performance on explosion-proof.
3.6 Easy operating valves on hydraulic control box make it easy to control the speed
of rising, lowering, moving forward and backward.
3.7 FY-60Y BOP Handling System is easy to install and transport. All hydraulic hoses
used to connect or disconnect on installation or dismounting adopt snap joints as
connections. It not only makes it easy to install and dismount system but also keep
inner hoses clean.

4. Installation and Test


4.1 Respectively insert BOP Lifting & Moving Device located at two sides into front
end of left & right guide rail located under the drilling platform, Tie up hauling rope
before inserting in case of collision during lifting. Install stop pin at end of the rail in
case that the device slides out of the rail.
4.2 Weld bracket base plate for pipeline on the outer side surface of middle ventral
plate along the length of every guide rail under the drilling platform, install pipeline
bracket (Upper height limitation to be welded is 50mm under upper wing plate of the
rail.)
4.3 Connect hydraulic hose between ctrl box and lifting device according to the
matching code on the fast adapter of the hydraulic hose. Fix the hose from middle on
the left & right pipeline bracket.
4.4 Connect oil inlets and outlets on the hydraulic control box with oil inlets and
outlets on the hydraulic station of power tongs on the drilling floor.
4.5 Ensure all pipe connections in good condition, start hydraulic station to provide
FY-60Y BOP Handling System with 18MPa hydraulic oil.

5
4.6 Operate handle of the reversing valve according to ctrl method and marking
direction indicated on panel of the ctrl box. Check whether every unloading motion is
right or not. Only every motion is checked properly can the device be put into use.

5. Operation, Maintenance and Safety


5.1 Watch the manometer on the hydraulic control box to check if oil-feeding pressure
meets the requirement 18MPa.
5.2 Operate lifting (up and down) and moving (toward and backward) of two lifting
devices according to ctrl method and marking direction indicated on panel of the ctrl
box.
5.2.1 Synchronously control valve No. 1 and 2 to make system move synchronously.
5.2.2 Asynchronously control valve No. 1 and 2 to make system move asynchronously
5.2.3 Synchronously control valve No. 3 and 4 to make system lift synchronously.
5.2.4 Asynchronously control valve No. 3 and 4 to make system lift asynchronously.
5.3 Carry out maintenance before every installation of the BOP Lifting & Moving
Device.
There are six (6) pulley lubricating points, four(4) driving gear lubricating
points, four (4) driven gear lubricating points, four (4) gear box lubricating
points, two (2) pipeline hanger bearing lubricating points and two (2)
driving-gear-hanger bearing lubricating points. Lithium base grease is suitable
for every point.
5.4 Before each lifting operation, operator should check if all cables are in good
conditions. All cables should be reliable connection before operation. On lifting
operation, workers should be far away from the goods to avoid accidents.

★Warning! In the hydraulic system, safe overload valve is equipped on the oil
line from balance valve to cylinder rod cavity. The preset pressure is 19Mpa. In
case that oil drainage occurs upon the security oil vent during operation, which
means oil return line blocked, stop operating at once and check connecting of
line and adapter. Only the line is connected properly can operation be allowed, in
otherwise serious accident is happening!

6
6. Spare Parts List

Item Code Description Qty. Components


1 FY50A-01.04.02 Cupper Bushing 24 Pulley
2 FY60-07.02.00 Lift Cable Φ28 2 Lifting Rope Assy
3 GB276-82 Bearing 306 4 Gear Reducer
4 GB278-82 Bearing 60307 4 Gear Reducer
5 GB276-82 Bearing 106 2 Pipe hanger
6 GB301-84 Bearing 8205 2 Pipe hanger
7 GB276-82 Bearing 312 20 Drive / driven Wheel
8 604-1034 ZMS-160(J2K-160)Cycloid Motor 4 Hydraulic System
9 DB10-2-30/315 Overflow Valve 2 Hydraulic System
10 RVP10-10/ Check Valve 8 Hydraulic System
11 FD12FA12/B30 Compensation Valve 2 Hydraulic System
12 GB1235-76 O-ring 11 4 Hydraulic System
13 GB1235-76 O-ring 12 40 Hydraulic System
14 GB1235-76 O-ring 16 4 Hydraulic System
15 GB1235-76 O-ring 20 22 Hydraulic System
16 GB1235-76 O-ring 24 2 Hydraulic System
17 GB1235-76 O-ring 30 6 Hydraulic System
18 GB1235-76 O-ring 35 2 Hydraulic System
19 JB982-77 Combined Gasket 22 18 Hydraulic System
20 JB982-77 Combined Gasket 18 6 Hydraulic System
21 JB982-77 Combined Gasket 14 18 Hydraulic System

7. Attached Drawings
7.1 Figure 1 Schematic diagram of FY-60YBOP Handling System
7.2 Figure 2 Structure diagram of FY-60Y BOP Handling System
7.3 Figure 3 Hydraulic principle diagram of FY-60Y BOP Handling System

7
≥1 300

Technic al Dat a 300kN


1.Max Lifting Capacity: 2×300=600kN
2.Max Lifting Stroke: 4m
3.Lifting Speed: 0~1.5m/min
4.Dropping Speed: 0~3m/min
5.Moving Speed : 0~12m/min
6.Max Working Pressure: 18MPa
7.Max Working Displacement: 120L/min
8.Dia of Wire Rope: φ28mm

300k N

To mech ani sm of dril lin g r ig well mo uth


Oil ret urn ve nt of h ydr aul ic stat ion

T o m echa nis m o f d rill ing ri g w ell mou th


oil ent eri ng ven t of hy dra uli c st ati on

Hydraulic Ctrl box

Figure 1 Schematic diagram of FY-60Y BOP Handling System

8
Driving Wheel group Lateral pulley group Ⅱ
Side of assistant Side of operator Running motor Reducing motor Lateral pulley groupⅠ
Driven Wheel group Travelling Wheel group

55
Slope direction Well-mouth direction

3 0 0k N 3 00 k N

A direction

T P

124

Figure 2 Structure diagram of FY-60Y BOP Handling System

9
5MP a

16 M P a

1.Side of operator
(front rear)

2.Side of assistant
(front rear)
16 M P a

3.Side of operator
(up down)

4.Side of assistant
(up down)
0-40MPa 19MP a

19MP a

Cont ro l box

P T

Figure 3 Hydraulic principle diagram of FY-60Y BOP Handling System


10
FY-60Y BOP Handling System

Maintenance Manual

Baoji City Engineering Hydraulic Parts Factory


version stamp:160220

1
I. Guide for Purchasing

Please purchase Components of FY-60Y BOP Handling System from the

manufacturer in accordance with the drawing code, description displayed in the manual.

II. Component Drawing Contents

Item Drawing Code Description

1 FY60-00 General Drawing

2 FY60-01.00 Traveling Wheel Group

3 FY60-03.00 Lateral Pulley GroupⅠ

4 FY60-04.00 Driving Wheel Group

5 FY60-06.00 Lateral Pulley GroupⅡ

6 FY60-07.00 Lifting Rope Assy

7 FY60-08.00 Driven Wheel Group

8 FY60-09.00 Hydraulic System

9 FY60-09.01.00G Control Box Assy

10 FYG300/180-1335 Oil Cylinder

11 FY60-00 Lubricating Drawing

2
III.Guide for Maintenance

Periodically lubricate the device in accordance with the position displayed on the

Lubricating Drawing. All rotation components can be rotated smoothly.

Lubricate bearings set with 7011 microtherm pressure grease

Lubricating period is stipulated in the Lubricating Drawing.

Appendix:Lubricating Drawing of FY-60Y BOP Handling System

3
8 7 6 5 4 3 2 1

10 9

Slope direction Well mouth direction


300kN 300kN

6 FY6 0- 07 . 00 L if ting ro pe As s y 2
A direction 5 FY6 0- 06 . 00 L at er a l p u l le y g ro u p Ⅱ 2
4 FY6 0- 04 . 00 Driving Wheel g rou p 4
3 FY6 0- 03 . 00 Lateral pulley group I 2
P
T 2 FY6 0- 02 . 00 B od y 2
1 FY6 0- 01 . 00 Traveling Wheel group 2
Item Code Descrip tion Qt y Materail Unit we ight Tota l we ig ht Remark

General Drawing
F Y 60 - 00
标记 处 数 分 区 更改文件号 签 名 年、 月、日
10 FYG3 0 0/1 80 -1 33 5 Oil C ylin d er 2 设 计 标准 化 阶 段 标 记 重 量 比例
9 FY6 0A P-08 . 00 A Pip e clip As s y 2
1:20
8
7
FY6 0- 08 . 00
FY6 0- 09 . 00
Dr ive n Wheel As s y
Hy d rau lic sy s tem
4
1
审 核
工 艺 批 准 共 3 张 第 2 张
B EH C P

4
1

3
4

510
5

φ150 Hg 88
H8
φ 140 d 8
φ 150 Hg 88

φ 140 Hd 88

60 7.5
φ495

φ564

55
303. 75
526

720

FY50 -01 .0 2. 05 (Flat) Flat Wh eel


1 Dr iv en Wh eel 2
FY5 0- 01 .0 2 .0 5 Sla nt Whee l
Item Code Description Qty Material Unitweight Totalweight Remark

F Y60- 01. 00
Tr av eling Wh eel Gr o up
6 FY60 -0 1. 0 2A Sha ft 1 标记 处 数 分 区 更改文件号 签 名 年、月、日
数量: 2/台
5 FY 50 A-0 1. 0 4. 0 2 Cop pe r liner 4 设 计 标准化 阶 段 标 记 重 量 比 例
4 FY50 A-0 1. 0 4. 0 1 Pulle y 2
审 核 1:7
3
2
FY 50 A-0 1. 0 2. 04
GB27 6- 84
Sha ft
B ear ing 3 1 2
2
2 工 艺 批 准 共 张 第 张 B E H CP

5
1

2 48. 5
2

φ 419

φ 488
265
416

526

720

2 F Y 5 0A - 0 1 .04 .0 2 C op p er l in er 4
1 F Y 5 0A - 0 3 .02 .0 1 P u ll ey 2
It em C o de D e sc ri p ti on Qt y M at e ri al U nit we ight T otal weigh t Re m ar k

FY60-03.00
Lateral Pulley Grou pⅠ
标记 处数 分 区 更改文件号 签 名 年、月、日
设 计 标 准化
数量:2/台
阶 段 标 记 重 量 比 例

1:5
审 核
工 艺 批 准 共 张 第 张
B EHCP

6
392 293

12

11

Ø 51
R1 2 3

φ130H7
1

φ60h6

Ø2 28
Ø19 5
10
2

45 2
9

17 5
3

2 10
4 8

15
11
5 Ø 6 0H
2 -Ø
50
6

7 78
370

539

5 FY5 0-0 4.0 2.0 6 L iner 1


4 G B2 76 -8 2 Bearin g 3 06 1
3 FY5 0-0 4.0 2.1 1 Bearin g cap 1
2 FY5 0-0 4.0 8 G ear 1
1 6 04-1 03 4 ZMS-160(J2K-160)cycloid motor 1
Un it Total
借 ( 通) 用 Item Code Description Qty Material Weight
Remark
件 登 记
FY5 0-04 .04 .01 (Flat) Flat Wh eel
旧底 图总号 12 Drivin g W heel 2
FY5 0-04 .04 .01 A Slant Wheel FY60-04.00
Driving Wheel Group
底 图总 号 11 GB2 76-8 2 Bearin g 3 12 2
10 FY5 0-04 .04 .02 A Shaft 2 标记 处数 分 区 更改文件号 签名 年、月 、日
签 字
9 FY5 0-04 .02 .02 Gear shaft 1 设 计 标准化 阶 段标 记 重量 比 例
数量: 4/台
日 期 8 GB2 78-8 2 Bearin g 6 030 7 1
1:3.5
档案员 日 期
7
6
FY5 0-04 .02 .04
FY5 0-04 .02 .09
Gear
Bearin g b ox
1
1
审 核
工 艺 批 准 共 张 第 张
BEHCP

7
720

265
2

φ 419

φ 488
1 4 0 Hd 99

1 4 0 H9d9
416
265
526

639

2 FY50 A-0 1 .0 4. 0 2 Cop per lin er 4


1 FY50 A-0 3 .0 2. 0 1 Pulley 2
I tem Code Descr ipti on Qty M ater ial Unitweight Total weight R emar k

FY60-06.00
Lateral Pulley GroupⅡ
标记 处数 分 区 更改文件号 签 名 年、月、日 数量:2/台
设 计 标准化 阶 段 标 记 重 量 比 例

审 核 1:5
工 艺 批 准 共 张 第 张 BE H C P

8
45 1

R2
23. 5
5 61 .
R2

.5
23

38
R2

76
54 0 6 27

( 4 82 5 .5 )
Ø2 8 1

2
15 0

2 S -D X3 5-2 DX Ty pe loo sening scr ew 1


1 F Y 6 0 - 07 .02 .0 0 L if t i n g R op e A s sy 1
借 ( 通) 用 526 Item Code Description Qty Material Unit weig ht Total weig ht Remark
件 登 记

旧底 图总号
L ift ing Ro pe Ass y
F Y6 0- 0 7. 0 0
底 图总 号
标记 处数 分 区 更改文件号 签名 年、月 、日
签 字
设 计 标准化
数量: 2 / 台
阶 段标 记 重量 比 例
日 期
1 :8
档案员 日 期
审 核 BEHCP
工 艺 批 准 共 张 第 张

9
293

Ø130
Ø60
2

Ø180
3

175

210
360
11
Ø6 0H

R70
360
539

FY50-01.02.05(Flat) F l at W h eel
1 Driven Wheel 2
FY50-01.02.05 S l ant W he el
Unit Total
Item Code Description Qty Material Weight
Remark

FY60-08.00
Driven Wheel Group
标记 处数 分 区 更改 文件号 签 名 年、月、日

设 计 标 准化 阶 段 标 记 重 量 比 例
数量: 4/台
1: 3
3 FY50-04.04.02A
2 GB276-82
Shaft
Bearing 312
2
2
审 核
工 艺 批 准 共 张 第 张
B EH C P

10
2 3

1 24

55
6 5
A direction
16 17 18 19
8 7 9 11 10 12 14 20 21
1
300kN 300kN
13
T P
15

800
50

55
48 5

21 H 4 - 6 2 , 65 M Fa s t a d a p te r N PT 1 /2 2 6 R VP 1 0-1 0 O n e - w a y v al v e 8
20 H 4 - 6 3 ,6 6 M Fa s t a d a p te r N PT 1 /2 4 5 D B 1 0 - 2 - 3 0 /3 1 5 O v e r f lo w v a l v e 2
19 JB 1 8 8 5 - 7 7 Hi-pressure hose 16Ⅱ -(30000 一端 90 ° ) 2 4 F D 1 2 F A 12 /B 3 0 B a la n c e v a lv e 2
18 JB 1 8 8 5 - 7 7 Hi-pressure hose 10Ⅱ -(30000一端 90°) 2 3 J B1 8 8 5 - 7 7 Hi-pressure hose 10 Ⅱ-(620 一端90 °) 1
17 JB 1 8 8 5 - 7 7 Hi -p re ssu r e ho se 1 0 Ⅱ - (3 00 00 ) 1 2 H 6 - 6 2 ,6 3 ,6 5 M , 6 6 M F a st a da p t er N P T 3 / 4 6
16 JB 1 8 8 5 - 7 7 H i- pr essu r e h o se 1 0 Ⅱ -( 1 43 0 ) 1 1 F Y 6 0 - 0 9 . 0 1 . 00 G C tr l b ox A ss y 1
15 H 3 - 6 2 , 63 ,6 5 M ,6 6M Fa s t a d a p te r N PT 3 /8 6 I te m Co d e D esc ri p tio n Q ty . M ate ria l Unit weight Tot al wei g ht Re mar k
14 JB 1 8 8 5 - 7 7 H i- p r ess ur e h o se 1 0 Ⅱ - ( 6 6 0 ) 1
13 JB 1 8 8 5 - 7 7 Hi -p re ssu r e ho se 1 0Ⅱ- (2 60 00 ) 1 FY60-09.0 0 图号
12 JB 1 8 8 5 - 7 7 Hi -p re ssu r e ho se 1 0 Ⅱ - (2 60 00 ) 2 Hy draulic System 比例 1:23 重量
标记 处数 更改文件号 更改人 日期
11 G B 1 23 5 - 7 6 O r i n g 2 0 × 2 .4 8
设计 描图 共 张 第 张
10 JB 1 8 8 5 - 7 7 Hi-pressure hose 16Ⅱ-(26000一端 90° ) 2
9 JB 1 8 8 5 - 7 7 Hi- pr essure hose 10Ⅱ-(1400 一端90°) 1 审核 校对 材料 用户
8 JB 1 8 8 5 - 7 7 H i- pr essu r e h o se 1 0Ⅱ -( 1 23 0 ) 4 标审 批准 阶段标识 数量
工艺 台 1 BE H CP
7 G B 1 23 5 - 7 6 O r i n g 1 2 × 1 .9 36 S

11
1 2 3 4 5 6 7 8 9

10
A 11

A direction
12

950
T P 13

FY-60Y防喷器移动装置操纵箱
23 22 21

司钻 侧


副钻 侧


800

司钻侧


14

副钻侧


20
19
15
18
16
26 25 24 485 17 520

9 G B 123 5-7 6 O r i n g 3 0 X 3 .1 4
8 DL 40 -d 2 5L -4 T- 4C- 4C- G Man u al multi- fold valv e 1
26 JB 1 8 8 5 - 7 7 Hi gh pressure hose set32Ⅰ- 30000 1
7 G B 123 5-7 6 O r i n g 2 0 X 2 .4 8
25 G B 12 35 -76 O r in g 3 5 X 3 .1 2
6 GB 12 35 -76 O r i n g 3 5 X 3 .1 3
24 H 8- 6 2,6 3 ,65 M ,66 M F ast coupl ing NPT1 2
5 JB 9 8 2 - 7 7 G a sk e t3 3 8
23 JB 1 8 8 5 - 7 7 Hig h pressure hose set 22 Ⅲ- 30000 1
22 G B 12 35 -76 O r in g 3 0 X 3 .1 6 4 J B9 8 2 - 7 7 Ga s ke t 14 2
21 H 6- 6 2,6 3 ,65 M ,66 M F ast coup ling NP T3/4 2 3 G B 3 4 5 2 .1 - 9 2 O r in g 5 .6 X 1 . 8 1
20 H 3-6 5M D ust- pr o of plu g NPT 3/8 2 2 HF J 2-P 2 -2-P -1 H ig h p r essu r e h o se se t 1
19 2 1 YT N-1 00 ZT Anti-shock p ressure gauge 1
H3 -62 Fema le cou p ling NPT3 /8
18 H 6 - 6 5 M Du st-p ro o f p lug NP T3 /4 2 Item Code Descrip tio n Qty' Materials Unit weight Total weig ht Remarks
1 7 H6 -62 Fema le cou p ling NPT3 /4 2
16 H4 -65 M D ust- pr o of plu g NPT 1/2 2 FY 60 - 09 . 01 . 00 G
1 5 H4 -62 Fema le cou p ling NPT1 /2 2
Control box assy
1 4 JB 9 8 2 - 7 7 Ga s ke t 22 3 标记 处数 分 区 更改文件号 签 名 年、月 、日

13 H6 -66 M Pr o te cti o n ca p N PT 3 /4 2 设 计 标准化 阶 段标 记 重量 比 例


Qty ' : 1 / 台
12 H 6-6 3 M al e c o u p l in g N PT 3 / 4 2
1 :7
11 H3-6 6M Pr o te ct io n c ap N P T3 / 8 2 审 核 BEHCP
1 0 H 3-6 3 M a le co u p l in g N PT 3 / 8 2 工 艺 批 准 共 张 第 张

12
1 2 3 4 5 6 7

( 20 4 5 )
4 -Ø 3 3
1 3 35 2 -N P T 3/ 8

Ø 35 0 -0. 36

Ø 35 5 -0. 36
0
Ø 34 8

Ø 35 2
Ø 18 0
383
318

Ø 3 00
3 18

3 83 7 W 9 - 18 0 -N 9 0 D u s t- p ro o f ri n g 1
6 U R 18 0 0P 2 0 5 0B - P N W i ck er s e ali ng 2
5 G B 34 5 2. 1- 9 2 O r in g 2 80 X 7 2
4 F R 11 9 Gui ding ring 2 5X2.5X5 70 2
3 G B 34 5 2. 1- 9 2 O r in g 1 40 X 5 .3 2
2 F R 11 9 Gui ding ring 2 5X2.5X9 30 1
1 U R 27 0 0P 3 0 0 0- P N W i ck er s e ali ng 2
Un it T o tal
借 (通) 用 I tem Co de D escr iptio n Qty. M ate rial W eight
R em ar k
件 登 记

旧 底图总号
F Y G300/ 180-1335
底 图总 号
Oil Cy lin d er
标记 处数 分 区 更改文件号 签 名 年、月、日
签 字
设计 标准 化
数量; 2 / 台
阶段 标记 重量 比 例
日 期
1:5
审核
档案员 日 期
共 张 第 张
BE HCP
工艺 批 准

13
④ ① ② ③ ③ ② ①

⑤ ⑤ ⑥

⑥ Suspending Wheel 4 5 00 ho ur Replace lubricatinggreasewhilemaintenance


⑤ Pu lley 12 1 6h ou r
④ Line bracket 2 5 00 ho ur Replace lubricatinggreasewhilemaintenance
③ Driven Wheel 8 50 0h ou r Replace lubricatinggreasewhilemaintenance
② Driving Wheel 8 5 00 ho ur Replacelubricating greasewhile maintenance
① Reducer box 8 5 00 ho u r Replace lubricatinggreasewhilemaintenance
Lubricating item Lubricating position Lubricating Qty' Lubricating period Re mar k

F Y6 0- 00
Lubricating Drawing
标记 处数 分 区 更改 文件号 签 名 年、月、日

设 计 标 准化 阶 段 标 记 重 量 比 例
Qt y' : 1 /S e t
1: 20
审 核
工 艺 批 准 共 张 第 张
BEHCP

14