Construction of 4 lane Access Controlled Greenfield Highway Section of Khammam-Devarapalle National Highway of

length 44.937 km from Ramanujavaram village to Telangana/AP Border (Design Chainage 44+937 to 89+874) under
Inter Corridor Route under Bharatmala Pariyojana, Phase-I on Hybrid Annuity mode in the state of Telangana.

ANNEX – I: Site
(Schedule-A)
Site
1 The Site
The Site of project highway is a section of Khammam – Devarapalle National Highway
commencing near Ramanujavaram village and ending Telangana/AP Border, passing
through greenfield area which falls in Khammam district, in the State of Telangana.
The land, carriageway and structures comprising the site are described below.

Sr. No Existing Chainage (km) Design Chainage (km)


Nil

2 Land
The project stretch is a greenfield alignment and predominantly passes through plain
terrain through Ramanujavaram, Mucharam, Peruvancha, Telagavaram, Chowdaram,
Yerragunta, Vemsoor, Thumbur villages. Latitude and longitude of the project corridor
lies between 17°9'51.43"N, 80°27'50.89"E and 17°8'40.32"N, 80°15'42.88"E. An index
map showing the existing features of the Project Highway is given at Appendix A-I.

Existing Chainage (Km)


Sr. No. Existing ROW (m)
From(km) To(km)
Nil

Note: The substantial Land for construction of the project & scope of work is being
acquired as per the requirement and shall be handed over to the Concessionaire
before commencement of construction activities. However, it may have some
encroachments which shall be removed jointly by the parties with the help of State
Authorities. So Authority shall only be responsible for provide the site/land free
from legal encumbrance and w.r.t illegal encroachments, Authority will provide help
to the Concessionaire for its removal.

3 Carriageway
There is no existing alignment as the proposed project highway is a new Greenfield
alignment.

Existing Chainage
Sr. No. Lane Configuration
From (Km) To (Km)
Nil

4 Major Bridges
The site includes the following Major Bridges:

National Highways Authority of India Page - 2


Construction of 4 lane Access Controlled Greenfield Highway Section of Khammam-Devarapalle National Highway of
length 44.937 km from Ramanujavaram village to Telangana/AP Border (Design Chainage 44+937 to 89+874) under
Inter Corridor Route under Bharatmala Pariyojana, Phase-I on Hybrid Annuity mode in the state of Telangana.

Existing Type of Structure No of Spans


Sr. No. Chainage Sub Super with span Width (m)
Foundation
(Km) Structure Structure length (m)
Nil

5 Road Over Bridges (ROB)/ Road Under Bridges (RUB)


The site includes the following ROB (Road Over Railway line)/ RUB (Road Under
Railway line):

Existing Type of Structure No of Spans


Sr. No. Chainage Super with span Width (m)
Foundation
(Km) Structure length (m)
Nil

6 Grade Separators
The site includes the following Grade Separators:

Existing Type of Structure No of Spans


Sr. No. Chainage Super with span Width (m)
Foundation
(Km) Structure length (m)
Nil

7 Minor Bridges
The site includes the following Minor Bridges:

Existing Type of Structure No of Spans


Sr. No. Chainage Super with span Width (m)
Foundation
(Km) Structure length (m)
Nil

8 Railway Level Crossings


The site includes the following Railway Level Crossings:

Sr. No. Existing Chainage (Km) Remarks


Nil

9 Vehicle Underpasses
The site includes the following Vehicle Underpasses:
Existing Type of No. of Spans with
Sr. No. Width (m)
Chainage (Km) Structure Span length(m)
Nil

National Highways Authority of India Page - 3


Construction of 4 lane Access Controlled Greenfield Highway Section of Khammam-Devarapalle National Highway of
length 44.937 km from Ramanujavaram village to Telangana/AP Border (Design Chainage 44+937 to 89+874) under
Inter Corridor Route under Bharatmala Pariyojana, Phase-I on Hybrid Annuity mode in the state of Telangana.

10 Culverts
The site has following Culverts:

Sr. Chainage Type of No. of Spans with


Width (m)
No (design) Culvert Span length(m)
1 Near 47+726 HPC 2.0 x 0.90 11.50
2 HPC 1.0 x 1.20 15.30
3 HPC 1.0 x 1.20 15.00
4 Near 62+717 Slab 1 x 3.0 x 2.0 12.10
5 Slab 1 x 3.0 x 1.50 12.80
6 Slab 1 x 3.0 x 1.40 12.60
Note: Above mentioned structures are falling within the Proposed Right of Way
(PRoW).

11 Bus Bays
The details of Bus Bays on the site are as follows:
Sr. No Existing Chainage (Km) Length (m) Left Hand Side Right Hand Side
Nil

12 Truck Lay-Byes
The details of Truck Lay-Byes are as follows:
Sr. No Existing Chainage (Km) Length (m) Left Hand Side Right Hand Side
Nil

13 Road side drains


The details of road side drains are as follows:

Sr. Location Type


No. From Km To Km Masonry/cc (Pucca) Earthen (Kutcha)
Nil

14 Major Junctions
The details of major junctions are as follows:
Sr. Existing Name of Category of Cross Road
At Grade
No Chainage(Km) Junction NH SH MDR Others
Nil
(NH: National Highway, SH: State Highway, MDR: Major District Road)
15 Minor Junctions
The details of the minor junctions are as follows:

National Highways Authority of India Page - 4


Construction of 4 lane Access Controlled Greenfield Highway Section of Khammam-Devarapalle National Highway of
length 44.937 km from Ramanujavaram village to Telangana/AP Border (Design Chainage 44+937 to 89+874) under
Inter Corridor Route under Bharatmala Pariyojana, Phase-I on Hybrid Annuity mode in the state of Telangana.

Sr. Location Type


No From (km) To (km) T-junction Cross-road
Nil

16 Bypasses
The details of the existing road sections proposed to be bypassed are as follows:

Name of Bypass Chainage (km)


Sr. No. Length (Km)
(town) From (km) to To (km)
Nil

National Highways Authority of India Page - 5


Construction of 4 lane Access Controlled Greenfield Highway Section of Khammam-Devarapalle National Highway of
length 44.937 km from Ramanujavaram village to Telangana/AP Border (Design Chainage 44+937 to 89+874) under
Inter Corridor Route under Bharatmala Pariyojana, Phase-I on Hybrid Annuity mode in the state of Telangana.

ANNEX-II
(Schedule-A)

Dates for Providing Right of Way of Construction Zone

The dates on which the Authority shall provide Right of Way of construction zone to the
Concessionaire on different stretches of the Site are stated below:

The Right of Way is being acquired and shall be provided to the Concessionaire on
different stretches presented below:

Sr. Design Chainage (Km) Length


Width (m)
No From (km) To (km) (km)
1 44+937 89+874 44.937 70
Note:
 The Authority shall provide the Right of Way on no less than 80% (Eighty percent)
of the total length of Project Highway on Appointed date in compliance to clause
10.3 of Agreement.

 Additional land required for Toll Plazas, Interchanges, Underpasses, Truck Lay-
byes, Rest Area, Border Check Post shall be provided to the Concessionaire as per
Agreement.

National Highways Authority of India Page - 6