The document outlines the requirements for the technical section of a bid for a sewage treatment plant project. It specifies that the technical section must include conceptual drawings showing the site plan, layout of treatment units, piping, and other infrastructure. It also requires a schedule setting out the proposed sequence of works, resources, and milestones. Additionally, it specifies that the bidder must provide estimated annual power consumption for operating the sewage treatment plant.
The document outlines the requirements for the technical section of a bid for a sewage treatment plant project. It specifies that the technical section must include conceptual drawings showing the site plan, layout of treatment units, piping, and other infrastructure. It also requires a schedule setting out the proposed sequence of works, resources, and milestones. Additionally, it specifies that the bidder must provide estimated annual power consumption for operating the sewage treatment plant.
The document outlines the requirements for the technical section of a bid for a sewage treatment plant project. It specifies that the technical section must include conceptual drawings showing the site plan, layout of treatment units, piping, and other infrastructure. It also requires a schedule setting out the proposed sequence of works, resources, and milestones. Additionally, it specifies that the bidder must provide estimated annual power consumption for operating the sewage treatment plant.
The document outlines the requirements for the technical section of a bid for a sewage treatment plant project. It specifies that the technical section must include conceptual drawings showing the site plan, layout of treatment units, piping, and other infrastructure. It also requires a schedule setting out the proposed sequence of works, resources, and milestones. Additionally, it specifies that the bidder must provide estimated annual power consumption for operating the sewage treatment plant.
a section entitled ―Drawings‖ which consists of conceptual drawings that are
sufficiently detailed to communicate the Bidder‘s Design intent for all components of the proposed Sewage Treatment Plant.The conceptual drawings shall include the following: a. a site plan showing the location of the STP area, alignment and limits to the Bidders construction activities; along with the land required for the total planned area for STP. The site plan / layout shall include new STP, Layout of various units of preliminary and secondary treatment, Layout of piping between various units and unit bypass for each unit, plant bypass, Layout of internal roads, hard standing, parking, compound wall and gate house, etc. Location of power transformer, switch room, control room and switchgear, Power wiring and underground cable layout, Relative location of administrative office, lab and control centre, Internal roads and parking provisions, Landscaping and reservations for future expansion, possible future tertiary treatment and Any other features for safe and efficient working during operations and maintenance. b. a site plan showing all proposed works listed in the Bid Data Sheet; c. a detailed narrative in support of the conceptual drawings setting out the Bidder‘s plan for compliance with the Design-Build Services Schedule and the technical standards set out in the Technical Standards Schedule, to include construction quality assurance and control; iii. a detailed program and schedule setting out the proposed sequence of works to be undertaken, including estimated start date, finish date and time allocations for individual units of the works, proposed resources to be allocated and the identification of all major milestones, including the submission of schematic Design documents, Design development documents, the Design-Build Documents and the commissioning of individual units of the Sewage Treatment Plant (STP); and iv. an itemised list of the principal codes of practice and standards proposed to be used for the Design-Build Services 3. a section specifying the power consumption for Operations and Maintenance of the STP on an annual basis. The Bidder shall further provide the breakup of electricity consumption in various facilities in the STP on an annual basis. The Bidder shall provide the total estimated connected load in KW, maximum power demand, average energy consumption in kWh per day with full load up to the installed capacity of the STP, estimated power factor, any proposals for improving efficiency in terms of lower power consumption. g. For Interception & Diversion Works: Part-I of the Technical Section of the Bid for Network and/or Interception & Diversion Worksshall consist of the following sub- parts in the following order: 1. An Executive Summary of the Technical Section;