This document outlines 5 work periods from May 6 to August 8, 2019 and provides descriptions of maintenance and improvement tasks completed during each period at a factory. The tasks include installation of new pumps and gearboxes, alignment activities, repairs, preventative maintenance inspections, and projects to increase production speeds. Over 100 individual tasks are described relating to areas like pressing, drying, stretching, pumping, and a new drum pulper installation.
This document outlines 5 work periods from May 6 to August 8, 2019 and provides descriptions of maintenance and improvement tasks completed during each period at a factory. The tasks include installation of new pumps and gearboxes, alignment activities, repairs, preventative maintenance inspections, and projects to increase production speeds. Over 100 individual tasks are described relating to areas like pressing, drying, stretching, pumping, and a new drum pulper installation.
This document outlines 5 work periods from May 6 to August 8, 2019 and provides descriptions of maintenance and improvement tasks completed during each period at a factory. The tasks include installation of new pumps and gearboxes, alignment activities, repairs, preventative maintenance inspections, and projects to increase production speeds. Over 100 individual tasks are described relating to areas like pressing, drying, stretching, pumping, and a new drum pulper installation.
Job Description 1. Pembuatan dudukan kanal untuk gearbox project increase speed PM7 2. Welding and Grinding base plate for construction gearbox project increase speed PM7 3. Alignment base plate gearbox 4. Alignment gearbox sesuai gambar kerja 1. Check gap antara roda stretcher PM3 2. Cleaning chain Stretcher PM3 3. Change casing cover pump P19 SP3 4. Change bearing unit SP29 SP3 1. Change doctor blade size press top bottom PM7 (project increase speed PM7) 2. Change doctor blade dryer 41, and dryer 42 3. Assembly canvas roll group 9 bottom PM7 4. Change roll size press top bottom PM7 5. Preventive dan inspection PM7 (trial production) 6. Repair pipa oli yang bocor 1. Checking clearence bearing size press (spare) TS and DS 2. Check clearence bearing PM7 G3 CR08, G8 CR15 3. Change bearing pulley rope size press PM7 (2pcs) 4. Change bushing M-AP-1 PM5 5. Change and add Gland Packing 1. Install new pump area SP3 lt1 2. Welding and Grinding base plate for construction new pump project drum pulper 3. Alignment base plate for new pump SP3 4. Alignment new pump sesuai gambar kerja 5. Install coupling for motor new pump 6. Install new pump area SP3 lt0 7. Repair oscilating doctor DC10, 12 8. Repair Jumbo roll ex press1 top bottom 9. Project drum pulper alignment stopper drum pulper 10. Checking flatness drum pulper with dial indicator 11. Install screen drum pulper 12. Alignment base plate for new pump SP7 13. Install new pump area SP7 14. Assembly new pump for drum pulper area outside 15. Alignment base plate for new pump drum pulper area outside 16. Install new pump area outside 17. Assembly base frame for gearbox drum pulper