CO-ORDINATION STUDY

Messrs. :
Project :
Reference : File name : Project1.ms2/Co-ordination1
Engineer : Created date :
Changed : Changed date :
Comments :

100000

M3
89.37A
50kW
THR2
8times
TH-N220RHKP
2s
105(A)
10times
Overload release

CB2
NF1000-SEW
10000 CB3 1000(A)
NF250-CW Long-time delay 1.15(x Ir) 60(s)
200(A) Short-time delay 5(x Ir),0.06(s)
Overload release Instantaneous 5(x In)
Instantaneous 2800(A)

1000

100
Operating time(s)

10

1
CB3
CB2
I"k3
15.158kA

0.1

0.01
10 100 1000 10000 100000
Current(A) at 380V