Project Title: Rectificaion of Perimeter Fence (CHB LAYING with Pile / Structural Footing, Beam's and Column's)

Location: Masagana Village, Mahabang Parang, Angono Rizal


Date Submitted:

BILL OF QUANTITY ( BOQ ) - LABOR ONLY

Item - TOTAL
SCOPE DESCRIPTION / ITEM OF WORK'S UNIT QTY AMOUNT
No. LABOR COST
I General Requirement's
1. Mobilization / Demobilization 1.00 lot -
2. Worker's Protection (Raincoat / Construction Boot's) 1.00 lot -
3. Other's (Please Specify) _________________________________ 1.00 lot -

Sub total for General Requirements -

II Structural Footing
1. Installation of 3" dia. G.I. Pipe include's Concrete Filling - Manual
12.00 pcs. -
Pile Driving
2. Reinforcement of Concrete Footing using 12mm Dia. RSB on
6.00 unit's -
20cm sp. Bw
3. Concrete Work's for Footing - Assume Manual Concrete Mixing 6.00 unit's -
Sub total for Item No. II -

III Stiffener Column


1. Installation of Reinforcement's (include's Tie's and Main Vertical
6.00 unit's -
Bar's)
2. Installation of Formwork's - reusable 6.00 unit's -
3. Concrete Work's for Stiffener Column - Assume Manual Concrete
6.00 unit's -
Mixing
Sub total for Item No. III -

IV Tie Beam
1. Installation of Reinforcement's (include's Stirrup's and Main
21.00 meter's -
Horizontal Bar's)
2. Installation of Formwork's - Bothsides 21.00 meter's -

21.00 meter's -
3. Concrete Work's for Tie Beam - Assume Manual Concrete Mixing
Sub total for Item No. IV -

V Lintel Beam
1. Installation of Reinforcement's (include's Stirrup's and Main
21.00 meter's -
Horizontal Bar's)
2. Installation of Formwork's - reusable 21.00 meter's -
3. Concrete Work's for Lintel Beam - Assume Manual Concrete
21.00 meter's -
Mixing
Sub total for Item No. V -

VI Masonry Work's
1. CHB Laying using 6" chb (include's reinforcement's vertical and
horizontal) - to include installation of 2" PVC pipe as weep holes 71.40 sq.m -
before the lintel beam only
2. No Plastering Required
Sub total for Item No. VI -

Geneneral Reqequirement's and Labor Cost -


Project Supervision and Profit
GRAND TOTAL FOR PROJECT COST -

DISCOUNTED PRICE / LAST PRICE

Full Name and Signature of BIDDER :

Complete Present Address:

Provincial Address:

RIMAR RM CONSTRUCTION AND BUILDER'S CORPORATION Email Address : rimar_rm@yahoo.com.ph