BOQ Perimeter Fence at Angono Rizal
BOQ Perimeter Fence at Angono Rizal
Item - TOTAL
SCOPE DESCRIPTION / ITEM OF WORK'S UNIT QTY AMOUNT
No. LABOR COST
I General Requirement's
1. Mobilization / Demobilization 1.00 lot -
2. Worker's Protection (Raincoat / Construction Boot's) 1.00 lot -
3. Other's (Please Specify) _________________________________ 1.00 lot -
II Structural Footing
1. Installation of 3" dia. G.I. Pipe include's Concrete Filling - Manual
12.00 pcs. -
Pile Driving
2. Reinforcement of Concrete Footing using 12mm Dia. RSB on
6.00 unit's -
20cm sp. Bw
3. Concrete Work's for Footing - Assume Manual Concrete Mixing 6.00 unit's -
Sub total for Item No. II -
IV Tie Beam
1. Installation of Reinforcement's (include's Stirrup's and Main
21.00 meter's -
Horizontal Bar's)
2. Installation of Formwork's - Bothsides 21.00 meter's -
21.00 meter's -
3. Concrete Work's for Tie Beam - Assume Manual Concrete Mixing
Sub total for Item No. IV -
V Lintel Beam
1. Installation of Reinforcement's (include's Stirrup's and Main
21.00 meter's -
Horizontal Bar's)
2. Installation of Formwork's - reusable 21.00 meter's -
3. Concrete Work's for Lintel Beam - Assume Manual Concrete
21.00 meter's -
Mixing
Sub total for Item No. V -
VI Masonry Work's
1. CHB Laying using 6" chb (include's reinforcement's vertical and
horizontal) - to include installation of 2" PVC pipe as weep holes 71.40 sq.m -
before the lintel beam only
2. No Plastering Required
Sub total for Item No. VI -