Difference between Rework & Repair as

per IATF 16949?

By - Arun Kumar Sharma


www.submastery.com

1
Why this is important?

www.submastery.com 2
Non
Conformity

Rework Repair Scrap

8.7.1.4 - Control of reworked product


8.7.1.5 – Control of repaired product

www.submastery.com 3
Which definition to follow?

www.submastery.com 4
The ISO 9000 definition should only be applied while
interpreting IATF standard, any other definitions will just
add more confusion.

www.submastery.com 5
Definition of Rework

www.submastery.com 6
Rework

action on a nonconforming product to make it


conform to the requirements

www.submastery.com 7
Rework Example

www.submastery.com 8
NC – Inner Dia mistakenly made undersize (Observed 16.20
mm against 19.20 mm) because of wrong drill size.

Action Taken – Drilling operation done again with the right


drill size.

Result – Product OK as per original drawing/ standard i.e


19.20 mm. Thus, Rework

www.submastery.com 9
Definition of Repair

www.submastery.com 10
Repair

action on a nonconforming product to make it


acceptable for the intended use.

Note - It can be that in conjunction with a repair


a concession is required.

www.submastery.com 11
Repair Example

www.submastery.com 12
NC – Nut not properly welded, came out

Action Taken - Two additional welding joint

Result - In drawing / standard - only two welding points


required, but we end-up having four joints. Here, no
issue in the usage (intended use). Thus, called Repair

www.submastery.com 13
NC - Drilling of a hole in the wrong place

Action Taken - Drilling of hole in the right place while


plugging the hole in the wrong place.

Result - Extra plugging hole NOT as per standard /


drawings. Although, product can be used. Thus, Repair

www.submastery.com 14
Let us sum-up differences ..

www.submastery.com 15
REWORK REPAIR
AFTER REWORK - PRODUCT IS 100 % AFTER REPAIR – PRODUCT IS GOOD FOR
CONFORM TO ORIGINAL SPECIFICATION INTENTENDED USE (FULFILL FUNCTION)

PRIOR APPROVAL OF REWORK FROM MUST TAKE APPROVAL / DEVIATION


CUSTOMER NOT COMPULSORY FROM CUSTOMER PRIOR TO START REPAIR
(EXCEPTION – IF REQUIRED) WORK
LOWER RISK HIGHER RISK

www.submastery.com 16
Are there any Similarities?

www.submastery.com 17
- Mandatory documented process

- Instructions along with re-inspection & traceability requirements

- Defect phenomena /risk to be identified in FMEA

- Documented information on disposition including quantity,


disposition & disposition date

www.submastery.com 18