This document provides a summary of grounding resistance measurements for 45 transmission tower locations from March 2019 to June 2019. It includes the measurement dates, pre-installation resistance values, post-installation values, grounding type (e.g. driven ground, drum), soil conditions (e.g. dry, wet) and notes. Resistance values ranged from 5.55 ohms to 250 ohms before installation and 6.40 ohms to 77.60 ohms after. Soil conditions were reported as dry for all locations.
This document provides a summary of grounding resistance measurements for 45 transmission tower locations from March 2019 to June 2019. It includes the measurement dates, pre-installation resistance values, post-installation values, grounding type (e.g. driven ground, drum), soil conditions (e.g. dry, wet) and notes. Resistance values ranged from 5.55 ohms to 250 ohms before installation and 6.40 ohms to 77.60 ohms after. Soil conditions were reported as dry for all locations.
This document provides a summary of grounding resistance measurements for 45 transmission tower locations from March 2019 to June 2019. It includes the measurement dates, pre-installation resistance values, post-installation values, grounding type (e.g. driven ground, drum), soil conditions (e.g. dry, wet) and notes. Resistance values ranged from 5.55 ohms to 250 ohms before installation and 6.40 ohms to 77.60 ohms after. Soil conditions were reported as dry for all locations.
P3B SUMATERA REKAP HASIL PENGUKURAN TAHANAN PENTANAHAN KAKI TOWER SUTT ISO 9001 : 2008
NOMOR DOKUMEN : FR-TRS-BOT-143 TANGGAL : 10 MEI 2016 REVISI : 0 HALAMAN : 1 DARI 1
TAHUN 2018 TL 150 kV SECTION KOTO PANJANG - PAYAKUMBUH
Nilai pengukuran Tahanan pentanahan
Jenis Pentanahan Kondisi Tanah Nomor Tanggal Pengukuran Lepas(Ω) Terpasang(Ω) N0 Lokasi Keterangan Tower A B C D A/B C/D Original Driven ground Drum Mengunakan Bentonit Counterpoise Kering batuan Lembab Basah
1 1 Bukit 9 March 2019 178,80 17,95 v V
2 2 Gurun 9 March 2019 194,10 9,57 v V 3 4 Gurun 28 Mei 2019 14,73 12,4 v V 4 5 Gurun 23 May 2019 12,20 11,95 11,89 11,90 v V 5 6 Gurun 20 Februari 2019 13,00 9,33 v V 6 7 Gurun 12 March 2019 159,30 33,70 v V 7 9 Bukit 12 March 2019 76,40 51,80 v V 8 10 Bukit 28 February 2019 30,20 22,00 v V 9 21 Gurun 12 March 2019 38,90 37,60 v V 10 27 Bukit 12 March 2019 32,20 15,20 v V 11 28 Bukit 13 March 2019 19,10 13,21 v V 12 31 Bukit 13 March 2019 12,86 10,47 v V 13 33 Bukit 16 March 2019 14,30 10,60 v V 14 34 Bukit 16 March 2019 84,60 15,00 v V 15 35 Bukit 17 March 2019 20,70 17,40 v V 16 37 Bukit 14 March 2019 17,90 17,90 v V 17 38 Bukit 14 March 2019 78,50 77,60 v V 18 40 Bukit 24 Mei 2019 9,15 v V 19 41 Bukit 15 March 2019 71,10 63,30 v V 20 42 Bukit 15 March 2019 110,30 39,90 v V 21 45 Bukit 17 March 2019 68,40 72,90 v V 22 52 Bukit 18 March 2019 250,00 19,80 v V 23 53 Bukit 18 March 2019 23,20 27,40 v V 24 54 Bukit 19 March 2019 53,10 16,90 v V 25 64 Bukit 20 March 2019 24,4 10,8 v V 26 65 Bukit 22 March 2019 114,80 14,67 v V 27 66 Bukit 24 Maret 219 15,50 9,45 28 68 Bukit 24 March 2019 17,53 14,30 v V 29 69 Bukit 27 March 2019 96,90 6,40 v V 30 72 Bukit 26 March 2019 57,30 65,00 v V 31 73 Bukit 26 March 2019 89,20 56,80 v V 32 75 Bukit 20 March 2019 29,8 20,80 v V 33 76 Bukit 20 March 2019 43,90 22,4 v V 34 78 Bukit 25 March 2019 58,80 25,1 v V 35 79 Bukit 14 Mei 2019 16,62 v V 36 87 Gurun 25 March 2019 75,20 14,79 v V 37 91 Gurun / Bukit 24 Mei 2019 36,40 v V 38 92 Gurun / Bukit 23 March 2019 35,60 15,32 v V 39 97 Gurun / Bukit 22-Mar-19 25,90 8,38 v V 40 99 Gurun / Bukit 24 March 2019 30,00 29,70 v V 41 115 Bukit 26 March 2019 11,00 6,74 42 130 Sawah 23 March 2019 14,8 14,30 v V 43 142 Bukit 19 June 2019 11,30 5,55 44 143 Bukit 19 June 2019 12,50 7,10 45 173 Bukit 19 June 2019 14,99 8,69