Nonadjustable - - - 0.15
1.
2. Labour – Pl *-*
3. Cement – Pc *-*
4. Steel – Ps *-*
5. Bitumen – Pb *-*
6. POL – Pf *-*
Total 1.00
Notes:
1. Source of Index for respective Indices shall be the same as indicated under Para4.2
of ―Schedule 8 - Price Adjustment‖attached to the Contract.
2. The Bidder shall specify a value in the last column of the Table within the range
indicated therein such that the total weighting = 1.00