Energy for a sustainable future

Our philosophy

As a leading supplier of technology and


We are only caretakers of the equipment for small and medium hydro-
power plants, Wasserkraft Volk AG has
world and of the resources we pass decided to make a significant contribu-
tion to such a sustainable future.
on to our children. A sustainable
We have built our own factory in
energy policy, based on the use of Gutach around this philosophy:

renewable resources, will be crucial Our own in-house hydropower plant


produces all the electricity needed
to their future. Hydropower is one for the workshop and office block,
and drives the heat pumps for the
of the frontrunners among the central heating system of the buil-
ding. Excess energy is fed into the
renewables. public grid.

Thus we are the first heavy machi-


nery workshop in Europe which is
energy self sufficient and CO2 emis-
sions free.

70% of the building material is tim-


ber from the nearby forests.

The heat insulation of the building


follows the strict standard for low
energy housing and lowers the needs
for heating energy significantly.

The rainwater of the “green roofs”


is collected for service and industrial
uses, saving valuable drinking water.

We believe that industry has a respon-


sibility towards society. Therefore, we
invest more than 5 % of our profit into
ecologically sound social projects.

This philosophy is backed by far


more than 1400 shareholders.

2
H y d ro p o w e r

Why Hydropower?

Today, more than ever, a secure and For centuries hydropower has played an Hydropower is economical
economic supply of energy is of utmost important role for mankind, and it will
importance for industry, business and further assert itself in future. Many facts Low operating costs
private users. Today’s energy resources support the use of water as an energy Extremely long lifetime of machinery
such as coal, mineral oil, natural gas and resource: High operational reliability
nuclear power won't remain available Low maintenance
without ever more severe limitations or Time proven technology
consequences on the environment. Re-
duced fossil reserves will inevitably result Hydropower users are free
in higher energy prices. For nuclear
energy there is today no appropriate From price hikes of energy
concept for waste disposal, and prob- From difficulties of interconnecting
ably never will be. Therefore, a basic with a public grid in remote areas
shift is necessary towards a preference
for renewable energy sources. Hydropower is environmentally
friendly

No harmful waste
No consumption of valuable resources
Small impact on the natural
environment

Only 18 %
of the technically exploitable

hydropower potential is used

world wide so far!

Hydropower can become the

No. 1 energy resource!

3
Competence and Quality
A glimpse into the future – the WKV Conference Room

Know how is acquired

+ experience is earned by applying know how in practice

= competence develops by systematically integrating


experience into the theoretical know how

This process needs time and


opportunity:

Over more than 25 years of its his-


tory, WKV has built hundreds of
power plants in over 35 countries.
Our customers’ satisfaction attests
to WKV's proficiency.

Our staff is our most important re-


source: highly qualified technicians
and engineers design and manufac-
ture for our clients. Continuous trai-
ning ensures the latest know how.
We aim to continuously improve
our competence by systematically
evaluating and integrating into our
work the experience gained from
completed projects.

We design and build not for years


but for decades. Day after day our
equipment has to produce power
reliably. This requires a very high
degree of quality from the design
through to the delivery. We owe
our outstanding position as one of
the market leaders for medium size
equipment to the top quality of our
products.

Not without reasons do we enjoy


the financial backing and trust of
our share holders.

4
Wa s s e r k r a f t Vo l k A G

We have built plants


in over 35 countries
worldwide.
WKV power plants

Only 18% of the technically exploitable


hydropower potential is used world
wide! A huge energy resource is waiting
to be tapped. Numerous countries could
reduce their dependency on fossil fuels
and nuclear power with hydropower.

WKV makes its own contribution:

Our own hydro plants contribute to


setting the standards for the use of this
enormous potential. We design hydro
plants with utmost technical accuracy
and maximum efficiency. From the
design stage to the commissioning all
relevant ecological and economical
factors will be considered.

6
WKV's own power plant

Our own in-house turbines

Our factory in Gutach sets the


standards

We are the first heavy machinery work-


shop in Europe and probably the world
which is absolutely energy self sufficient
and CO2 emissions free! The entire
energy is supplied by two WKV Francis
turbines.

The experience, which can only be


gained by operating one’s own power
plants, is directly integrated into our
work. Our clients directly benefit from
it and our share holders appreciate the
economic returns.

WKV Francis turbines


WKV Scope
of Supply
and Services

… the optimum solution for your project

We run our own powerplants, Delivery, installation, start-up and


hence we really know: commissioning of all electrome-
chanical equipment
Many may supply machinery and equip-
ment. Yet, a successfully operating WKV stands for mature technology
power station requires more: the best and designs, first class quality manu-
possible matching and integration of facturing and maximum reliability
all its components, from hydraulics and to achieve decades of continuous
waterways engineering through the operation.
electromechanical equipment up to We deliver a wide range of turbines
the interconnection with the grid. and select the one best suited for
each application.
Consulting engineering/planning WKV offers governing and control
systems ranging from simple manu-
WKV offers consulting services tailored ally adjusted devices up to fully
to each project’s specific requirements. automatic unattended stations. All
Our experienced engineers, drawing on governors are developed, manufac-
WKV’s extensive know how, are avail- tured and tested in our own electric
able for: department.
Each project is carefully and exten-
Project definition and conceptual sively documented, thus ensuring a
layout reliable supply of spare parts over
Engineering of hydropower compo- decades.
nents as well as of the complete
system
Layout and design of all the electro- WKV’s own test facilities
mechanical equipment
Complete water to wire engineering WKV turbines and equipment are de-
veloped and continuously improved in
our own test facilities (90 kW). This
allows us to reliably achieve and gua-
rantee a high degree of efficiency.

8
The WKV
P e l t o n Tu r b i n e

Characteristics

Head range from 30 m up to 1 000 m well suited to sites with significant


fluctuations in discharge
Capacity up to 15 000 kW
developed for use in demanding
1 to 6 jet designs application with silt laden water

Relative Efficiency
horizontal or vertical shaft optimized jet geometry to achieve
arrangements outstanding peak efficiencies

Jet deflectors for outstanding Spearvalve actuated by either electric


dynamic performance or hydraulic means
Relative discharge

2 or 4 bearing turbine – generator Runner cast from high grade, extre-


arrangements mely wear resistant, stainless steel

maintenance free shaft seal design

WKV Single jet Pelton turbines (425 m net head)


T h e W K V Tu r g o
I m p u l s e Tu r b i n e

Characteristics

Head range from 30 m up to approx. less sensitive than Francis turbines for
300 m applications with silt laden water

Capacity up to 5 000 kW excellent part load efficiencies

1 and 2 nozzle designs, horizontal Jet and runner geometry optimized


Relative Efficiency

shaft arrangement in WKV’s test facility to achieve ex-


cellent efficiencies
Jet deflectors for outstanding dyna-
mic performance – important in case Spearvalve actuated by either electric
of long penstocks or hydraulic means

Relative discharge well suited to replacing low head


multi jet Pelton or high head Francis
turbines with poor part load effi-
ciencies

maintenance free shaft seal design

Runner cast from high grade, extre-


Characteristic water mely wear resistant, stainless steel
path of Pelton / Turgo –
Impulse Turbines

WKV Twin jet Turgo turbine (197 m net head)


The WKV
F r a n c i s Tu r b i n e

Characteristics

Head range: complete range of specific speed


open flume from 1.5 m up to 10 m runner designs for optimum selection
spiral casing up to approx. 300 m versus synchronous speed

Capacity up to 15 000 kW compact design and low mainten-


ance requirements through rigorous

Relative Efficiency
high peak efficiency selection of the best suited materials

used where flow fluctuation is less 2 or 4 bearing turbine – generator


than 50 % of the design flow arrangements

Bearings rated for at least 100 000


hours of operation Relative discharge

Wicket gates actuated by electric or


hydraulic means

WKV Francis turbines (60 m net head)


The WKV
C ro s s f l o w Tu r b i n e

Characteristics

Head range 3 m up to approx. 150 m maximum efficiency achieved by


using a hydraulically optimized
Capacity up to 2 000 kW blade design
small + large cell

large cell a split vane construction allows an highly sturdy runners


almost constant efficiency between
Relative Efficiency

small cell
100 % – 17 % of full discharge cast or welded guide vanes with
Crossflow Turbine
stainless steel shafts
significant improvements achieved
through targeted research and deve- Guide vanes actuated by electric
lopment in WKV’s own test facility or hydraulic means

Relative discharge economic solution where other tur- robust and stiff housing with
bines prove to be too expensive inspection hole and aeration valve

proven bearing arrangement,


designed by WKV, rated for at least
100 000 hours of operation

WKV Crossflow turbine (52 m net head)


W K V s w i t c h b o a rd s
a n d c o n t ro l s

Manufactured in our own facilities

We designs and manufactures the WKV supplies the full range of


switchboards and controls at its own equipment from low voltage
workshop, thus providing overall controls up to high voltage
responsibility for the complete station. switchgear.

Controls based on conventional


Your advantages: technology
PLC based controls
clear and precise arrangements, Remote control
quick turnaround on design issues, Annunciation and display equipment
short deliveries Low voltage switchgear up to
3 500 A
factory testing and inspection of the Medium voltage switchgear
complete switchboards and control High voltage switchgear
equipment in our own test facilities Transformers
Energy metering
erection and commissioning by Complete wiring
competent WKV-staff Commissioning and after sales
Service

WKV Switchboards and controls


The “heart” of the power station

Digital/analogue speed governor Oil-Hydraulic power units


type SRE 2000
WKV offers a complete range of hy-
This is a complete new development draulic power units for all control appli-
by WKV. This governor is unique in the cations. This includes simple actuators
world of controls as it combines the ad- for parallel operation to a grid (level or
vantages of both digital and analogue discharge control) as well as the most
technologies. complex applications involving isolated
network or parallel operation.
display of the main control parame-
ters designed for decades of continuous
PID controls with the option of ex- operation – only the best compo-
ternal disturbance suppression ensure nents will be used
stability even in case of long pen- low pressure hydraulics for extended
stocks or instable grid service life
modular 19” rack design for easy energy saving designs
implementation and exchange of for most applications there is no
components need for maintenance intensive high
Protection against external faults, all pressure accumulators
I/O circuits are protected against
external shorts and reverse polarity
easy adjustment of all main parame- WKV manufactures the complete
ters by means of only a screw driver! range of governors in-house. All
No programming software or termi- to your advantage!
nal, no laptop required! Our governors and hydraulic power
Sensorless speed detection units are being used worldwide.
designed for operation with PLC
based controls or a remote control
system (SCADA)
suited for speed control, discharge
or level control, as well as for double
regulated units (spearvalve/deflector
or guide vanes/runner blades)
sturdy, user friendly design and
technology

WKV offers a life-time guarantee


on the supply of spare parts and
services!

14
WKV Governors

WKV Level Controllers for parallel Electronic Load Controller (ELC)


operation
ELC’s are designed for smaller units
Our water level controllers are designed supplying isolated load as well as for
to ensure the best possible use of the the emergency power supply of grid
available water. Your unit will always connected units. They keep the frequen-
generate the maximum output. cy constant by feeding surplus energy
to a ballast load.
PLC controlled operation to achieve
optimum efficiency for multi jet suitable for output up to max 400 kW
impulse turbines as well as for twin excellent frequency stability even
cell crossflow turbines during load acceptance and rejection
Indication of the intake water level heavy duty industrial grade electro-
Surge protected water level sensors nics especially designed for extreme
provide safe operation even under ambient conditions
adverse environmental conditions
User friendly adjustment of set points

Mechanical governors and


their maintenance

For some applications mechanical go-


vernors may provide significant advan-
tages. WKV offers a full line of such
governors manufactured in house.

Series AA1 – AA3 (250 Nm – 750 Nm)


Series SR50 – 200 (500 Nm – 2000 Nm)
robust and well proven design
completely without any electronics –
best suited for applications in remote
areas

maintenance and spare parts for all


“JAHNS” governors

15
WKV-Equipment, ranges and services

WKV Pelton turbines up to 15.000 kW Wasserkraft Volk AG


WKV Turgo turbines up to 5.000 kW Am Stollen 13
WKV Francis turbines up to 15.000 kW D-79261 Gutach/Germany
WKV Crossflow turbines up to 2.000 kW Tel.: + 49 (0) 76 85 - 91 06 - 0
WKV Switchgear and controls Fax: + 49 (0) 76 85 - 91 06 - 10
WKV Governors E-Mail: sales@wkv-ag.com
WKV “Water to wire“ design and delivery Internet: www.wkv-ag.com

Net head
H [m]

Pelton turbine

Turgo Impulse

Crossflow turbine
up
on
re
qu
es
t

Francis Spiral Casing


up
on
re
qu
es

Francis
t

Open
Flume

upon request

Discharge
Q [ l /s ]