Atlas Copco Meyco AG

Handing Over and Instructions Form


Company: Date:

Street: Machine Model:

Post.Code: Town: Machine No.:

Telephone: Fax.No.: Operating Hours:

1. Pump incl. Accessories have been 10. Maintenance and change of 20. Point out the need to keep to the
checked to see if they are conveying line and its correct maintenance intervals and carry
complete adjustment have been explained. out the maintenance work.

2. Point out the need to study the 11. Set up boom according to 21. If there is risk of frost, water must
service manual several times operating instructions. be completely drained out of the
(once is not enough). water box and water tank daily.
12. Carry out boom movements:
3. The need to observe the safety lifting, lowering, slewing 22. Reference made to handbook
regulations for pump and boom after sales service.
has been pointed out. 13. All functions of the remote control
have been explained. Practice 23. Advice: First after sales service
4. Lubrication points have been operation carried out. must be carried out by the
explained according to lubrication operator at 100 operating hours
plan. Function and setting of the 14. Emergency measures explained (otherwise the guarantee is no
central lubrication have been for hydraulic and electrical faults. longer valid).
explained.
15. Boom has been set into travelling 24. Reference made that operators
5. Pump checked for leaks (if operation and safety devices must be qualified and properly
necessary, retighten screw explained. schooled.
fittings).
16. If necessary, slurry is prepared 25. List of people trained attached.
6. Changing over from driving and the pumping process started.
operation to pumping operation During operation, information is
explained and demonstrated. given on economical operation.

7. Optimum transfer tube setting/gap 17. Recognition and removal of


dimensions shown. blockages in pump and line Have
been pointed out.
8. Performance test without load: 18. Cleaning method has been
a) hydraulic pressures in explained and demonstrated.
accordance with data sheet Safety regulations explained.
b) functional check
9. Stroke checking and correction 19. Necessity of filling water box with
has been explained and lubricant has been explained.
demonstrated.

The person taking over the pump and boom certifies with his signature that the pump and boom were handed
over correctly and in accordance with the instruction regulations. The individual explanations were understood.
Special attention was drawn separately to the safety regulations for pump and boom. The pump works without
faults. If this is not the case, the work listed below must be carried out.

Comments: Site people responsible:

------------------------------------------------
Site manager/s:

------------------------------------------------
Electrician/s:

------------------------------------------------
Mechanic/s:

------------------------------------------------

------------------------------------ ---------------------------- --------------------------------------------------


Techn.Engineer (names in capital letters) Place, date Customer or pump driver (company stamp)
M:\Vorlagen:\Handing over and Instructions Form
F3.8-702 / MEM Erstelldatum 13.02.2007 16:54:00