Inspection, Quality Control, and Assurance SHEET (1) : 6-If The Mean Value of The Measured Stress Was 15 KG/MM

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Inspection, Quality control, and Assurance

SHEET (1)

1-What are the objectives of Inspection?

2-Discuss, by short notes, functions of Inspection?

3-State, the most kinds of inspections?

4-What is meant by: quality control, product quality, and what are

factors controlling a quality?


5-Determine the arithmetic mean and the standard deviation for the frequency dist.
Of the numbers:

Cell mid point 1000 1200 1400 1600 1800 2000


Frequency 6 13 22 17 11 8

6-If the mean value of the measured stress was 15 kg/mm2, and σ =12.5

Determine the probability of data which is out stress range of 130-175

kg/mm2 . Assume the data are normally distributed.

7-When measuring the weight of bicycles, the mean value is 9.07 kg, and σ = 0.4, the
distribution is normal, Find

[a] The % of bicycles less than 8.3 kg.

[b] The % of bicycles greater than 10 kg.

[c] The % of bicycles between 8 and 10 kg.

8- By examining the production on a grinding machine, it was found that 10% of


the production with diameter larger than 80.001 mm and 10% with diameters less
than or equal to 79.991mm.
a- Assuming shaft diameters are normally distributed, find the mean and
standard deviation of the production.
b- What percentage of production lies between 80.001mm and 79.99mm?