Download as pdf
Download as pdf
You are on page 1of 5
TABLE 1 - CONTRACTOR'S CLAIMS, Red Yellow | Silver Gi | Clause tite [vent Notice | Cost/Profit 1.9 | Delayed Late drawing or | Reasonable | Cost + profit | N/a Nia drawings or instruction prior (Errors in | (Confident Instructions notice + ERs) iality) 20.1 2.1 | Right of Late accessor | 20.1 Cost + profit | 7 7 Access to the | possession Site 47 | Setting-Out | Exrorin specified | 20-1 Cost + profit | 7 l* reference points. (not reasonably discoverable by ‘experienced Contractor 4.12 | Unforeseeable | Adverse ‘Assoonas | Cost v * Physical unforeseeable. practicable Conditions 420.1 4.24 | Fossils ‘Compliance with | Promptly | Cost v v ____| instructions. 420.1 ’ Testing [Instruction for [20.1 Cost + profit | 7 v | additional passed j test, or delay for which Employer responsible Extension of |_| Various 20.2 wa v Y (not time for ‘weather or Completion shortages) 85 | Delays caused | Delays caused by | 20.1 ia | * v v by Authorities | authorities 8.4) $9 | Consequences | Suspension 20.1 Cost iy v |__| of Suspension I 10.2 | Taking over | Employer's use | 20.1 Cost + profit | 7 ‘Employer of Parts of the | of part of Works | may not Works without | take early Contractor's possession agreement | without __ [consent _| 10.3 | Interference | Prevention of — | 20.1 Cost + profit | 7 v with Tests on} tests Completion | 11.2 | Cost of Defects not Notice by | V.O. a ce Remedying | Contractor’s Employer Detects responsibility 420.17 11.8 | Contractor to | No Contractor 20.1? ‘Cost + profit | ~ Ae Search defect found oO { Red Yellow | Silver i | Clanse tile | Event Notice | Cost/Profit | . | 12.4 | Omissions Omission of Notice ‘Cost’ NéaChaim | N/a Claim i work with incurred | fordelayed | for delayed i Tests after | Tests after : [particulars [anyway | completion | Completion 132 | Value ‘Approved 20.17 30% of net | * * Engineering | proposal changes saving design 73.3 | Variation Re-rating 12+201 [V0 v v Procedure _| justified | 137 | Adjustments | Change inlaw | 20.1 Cost v v cor Changes in Legislation ! 15.5 | Employer's | Employer 163/196 |Valueot [7 v Entitlement to | terminates at will work + Cost Termination _| 16.1 | Contractor's | Contractor Di days | Cost + profit | 7 7 Entitlement to | suspends due to | prior + Suspend Employer's 20.1 Work default 164 | Payment on _ | Contractor 14 days | Release of [7 v Termination | terminates due to | prior (or _ | bond, value Employer's immediate) | + Cost, default | profit, oss and damage 17.4 | Consequences |Loss or damage | Promplly7_| Cost (+ v v | of Employer's | to Works etc. due | 20.1 profit in two Risks to Employer's instances) tisk | 19.4 | Consequences | Prevented from | Within 14 | Cost (except | 7 v of Force performing any | dayy20.1._ | natural Majeure obligation catastrophes ) CO 19.6 | Optional Prolonged [7 days Value + v 7 Termination, | prevention notice Cost payment and Release eee 19.7 | Release from | Impossible, Upon Value + v v | Performance | unlawful or notice” Cost under the Law | released by law 201 | Contractor's | Contractor 28 days |~ 7 7 | claims considers himself | (42 days entitled to EOT | for fully | | or extra payment | detailed | | claim) TABLE 2 - CONTRACTOR’S OTHER ADDITIONAL PAYMENTS Ciause Clause title Event Procedure no. 16 Contract Agreement Stamp duty ete. Cost to be Borie by | zi é Employer — 20.1? 46 ‘Co-operation Unforseeabie Cost of Variation allowing others to work on | or near Site i 138 ‘Adjustments for Changes in | Increased costs Interim Payment Cost Certificate 148 Delayed Payment Tate payment No procedure specified - 20.17 Discount rate 43% 181 General Requirements for | Employer fails to insure | 20.1 Oo Insurances - O ‘TABLE. ;MPLOYER’S CLAIMS/DEDUCTIONS Clause] Clause title Event Procedure ‘Comments No. 25 Employer's Claims | Various Notice + | particulars as soon as practicable 42 Performance Specified failures | None Securit _|@w@ 4.19 | Electricity, Water | Amounts consumed | 2.5/3.5 Notice not required and Gas 25) 4.20 | Employer's Amounts duefor | 2.53.5 Notice not required Equipment and | use es) Free Issue Material 75 Rejection ‘Additional costs | 25 dute to rejection and retesting 76 Remedial Work | Contractor fails to [2.5 comply with remedial instruction 86 Rate of Progress | Revised methods | 2.5 cause Employer to incur costs | | 87 Delay Damages | Contractor failsto | 2.5 May be reduced comply with Time under 10.2 for Completion o4 Failure to Pass Part of works Termination All sums paid for Tests on useless Part, financing, Completion __| clearing ditto | ditto Value reduced ‘Agreement + TOC | Reduced value or TOCI3.S 113 | Extension of Part of works 25 Max extension: + 2 Defects useless due to years Notification Period _| defect TLS | Failure to Remedy | Failure to remedy Cost of works by Defects within reasonable | notice of others or time reasonable time —_| reasonable reduction or, for useless works, all sums paid, i financing, clearing TLIl | Clearance of site | Non-clearance by |= Cost of sale’ Contractor 154 | Payment afer Termination by | 2.5 Extra cost to ‘Termination Employer complete, losses | and damages | 181 | General Contractor fails 10 | 2.5 | Requirements for Insurances insure Clause] Clause title Event Procedure ‘Comments No. 18.2 | Insurance for Contractor unable | 2.5 ‘Amount equivalent Works and to insure to commercially Contractor's reasonable Equipment premium

You might also like