Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

EPD 4th Quarter Environmental Inspection - Year 2019

FINDINGS OF INSPECTION REPORT

ITEM FINDINGS CONTRACTOR ACTION TARGET DATE STATUS


The CEBENT company shall be
Chlorine level is low in the potable
1 informed to increase the cholrine level 02 NOVEMBER 2019 OPEN
water.
to minimum 0.5 mg/l.
Sanitization record shall be kept in the The Kitchen supervisor shall keep the
2 31 OCTOBER 2019 OPEN
kitchen office. required record for reference.
The materials stored in the dry storage
No proper clearance between the wall shall be kept away from the walls
3 and the stored materials in the dry enough to provide proper clearance 31 OCTOBER 2019 OPEN
storage rooms. around the walls to do necessary
cleaning.
No Handwashe soap and drying facility ARHC will provide handwash soap and
4 outside the kitchen and inside the toilet drying facility outside the kitchen and 05 NOVEMBER 2019 OPEN
buildings. inside the toilet buildings.
ARHC will provide chairs, tables and
No enough cupboards, chairs and lamps to each occupant. To avoid the
5 tables inside the living rooms for each congestion issue ARHC has provided 30 NOVEMBER 2019 OPEN
occupant. centralized store to store the belongings
of the occupants.
Some of the hot pots covers in the The kitchen supervisor has been
6 kitchen were found with missing advised to equip the covers with proper 02 NOVEMBER 2019 OPEN
handles. handles.

Saudi Aramco: Company General Use

You might also like