Sr.No Material Description Qty No Of Terminations.
run
Note:
1.. All Structural Material will be Scope. Erection Contractor should paint the required structure for above with one coat of primer paint & one coat of oil
paint. Avoid to cut tray by welding rod.(Paint shall be in contractor scope)
2.Tray
Tray should be bolted to supports. Structural Fabrication for Cable Tray, JB, PDB, Panels and instruments will be in Erection Contractor Scope .
3. Hardware such as Nut Bolt Washer for installation of Cable Tray, JB, PDB, Panels and instruments will be in Contractor Scope
2 3.5C x 50 Sq.mm 1.1kV Grade A2XFY, LHSFT Cable for Incomer 60 Mtr 1 2
Note:
1.All
.All cable terminations should be with proper cable glands, lugs & Printed ferrules on white sleeve as per standard practice.
2.Cable Gland should be double compression type. Lugs, Printed Ferrules shall be Erection Contractor Scope it shall be as per Specification
2 01Pair X 0.5 Sq mm G Type CU X PVC Insulated Arm.Shielded FRLS Cable 400 Mtr 20 40
Note:
1.All
All cable terminations should be with proper cable glands, lugs & Printed ferrules on white sleeve as per standard practice .
2.Cable
Cable Gland should be double compression type. Lugs, Printed Ferrules shall be Contractor Scope it shall be as per Specification
1 Pressure Transmitter - Instrument installation,tubing as per hook up ,support for instruments 7 Nos N.A. N.A.
2 Differential Pressure Transmitter - Instrument installation,tubing as per hook up ,support for instruments 2 Nos N.A. N.A.
3 Pressure Gauge 12 Nos N.A. N.A.
4 Differential Pressure Switch - Instrument installation,tubing as per hook up ,support for instruments 5 Nos N.A. N.A.
Note:
1. All sundry items like Insulation Tape, Teflon Tape, Tread Sealant etc. are in contractor's scope.
2. All Instrument Installation shall be as per approved Hook Up Drawing provided by & instruction at site by supervision engineer
3.Structural
Structural Fabrication for Instrument Support is in Contractor Scope.
4.All process connection required on pipe shall be in Contractor scope.
5.Material reuired for all process connection for instrument mounting will be contractor scope.
6.Hardware required such as Anchor Fasteners for instrument support installation shall be considered in Contractor Scope.
7.As the process tapping & hardware required for process connection of instruments shall be considered in Erection Contractor scope(e.g. Socket ,barrel
Nipple).
E Impulse Tubbing and Fittings for Instruments (For Detail BOQ Ref Hook Up Drawing)
1 1/2" OD X 0.065 " Thk SS304 Impulse tubing with proper bending & supports 100 Mtrs N.A. N.A.
Note:
1. SS Tube bender should be available with erection contractor. .All material like Connectors, Unions, Valves, Barrel Nipples will be Free Issue
2. All Instrument Installation shall be as per approved Hook Up Drawing provided
G MS Structural Fabrication
Note:
1. All Structural Material will be provided by
2. Structural Material Dimension May Change based on availability at Site but will not exceeds 100 MM Channel and 50 mm Angle.