Amount in Words : Four Core Twenty Eight lakh Twenty Two Thousand Three Hundred
Twenty Nine Only.
Authorized signatory.
Summary_RA Bill_03.
HYDERABAD INTEGRATED MUNICIPAL SOLID WASTE LIMITED.
TRANSFER STATION - IMLIBUN.
2 Filling with with sand in trenches, sides of cum 54.52 581.50 31,704.49
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work.
4 Plain Cement concrete Grade M10 - Nominal cum 11.97 4,163.00 49,833.11
Mix upto Plinth level using 40mm metal
using concrete mixer
Providing concrete for plain concrete in
open foundations upto plinth using 40 mm
nominal size Graded hard stone aggregate,
mixed, placed in foundation and compacted
by vibration including curing for 14 days
complete as per drawings and technical
specifications.
b) Columns, Lintels, Water Tanks, Rcc Walls In cum 621.92 7,255.00 4,511,995.59
Buildings Upto A Height Of +3.60M
c) Rcc Slabs, Beams Upto A Height Of +3.60M cum 412.87 5,383.00 2,222,499.13
9 Shuttering : - - -
HIRE, LABOUR CHARGES FOR CENTERING &
SCAFFOLDING - Unsupported Height upto
3.66 M
Steel scaffolding pipes, jack Props, wallers,
Foot plates, brackets, steel Centering
Plates, etc., complete
13 Out Side Plastering- Two coats(16mm th. in 10 sqm 3,132.79 2,731.50 855,721.74
CM(1:6) & 4mm th. in CM(1:4):
Providing external cement plaster 20 mm
thick in 2 coats with cement mortar base
coat in CM (1:6), 16mm thick and top coat
in CM (1:4), 4mm thick with Dubara sponze
finishing to concrete or brick surfaces, in all
positions including scaffolding and curing
complete.
19 Earth filling (ordinary soil) Barrowed soil: cum 8,080.04 423.50 3,421,898.43
Filling with with approved material obtained
from borrow pits (excluding rock) in
trenches, sides of foundations and
basement with initial lead in layers not
exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming
including cost and conveyance of water to
work site and all operational, incidental,
labour charges, hire charges of T & P etc.,
complete for finished item of work.
45 Masonry work in CM (1:8) prop with Flyash cum 75.08 6,781.00 509,148.24
Cement solid blocks of size 290 x 225 x 140
mm for manufacturing of flyash solid blocks
using flyash of 80 kgs, cement of 15 kgs.
Gypsum of 5 kgs. and stone dust including
cost and conveyance of all materials, labour
charges, seiniorage charges, scaffolding and
curing etc., cpomplete with a compresive
streangth not lessthan 50 kg/sqm for walls
for Superstructure Walls.
2 Filling with with sand in trenches, sides of cum 2.927 1.603 9.499 351.680 3.933 2.444 1.312 15.695 1.673 0.391 0.225 0.441 0.274 392.097 337.58 54.52 581.50 31,704.49
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work.
3 Plain Cement concrete (1:4:8) using 40 mm cum 1.951 3.750 9.499 491.779 1.312 11.771 1.673 1.156 0.391 0.225 0.903 0.441 0.274 525.125 68.24 31.48 425.41 3,825.50 1,627,400.21
metal with concrete mixture. All work upto
plinth level.
Providing concrete for plain concrete in
open foundations upto plinth using 40 mm
nominal size Graded hard stone aggregate,
mixed, placed in foundation and compacted
by vibration including curing for 14 days
complete as per drawings and technical
specifications.
4 Plain Cement concrete Grade M10 - Nominal cum - 2.405 92.950 5.900 3.666 104.920 92.95 11.97 4,163.00 49,833.11
Mix upto Plinth level using 40mm metal
using concrete mixer
Providing concrete for plain concrete in
open foundations upto plinth using 40 mm
nominal size Graded hard stone aggregate,
mixed, placed in foundation and compacted
by vibration including curing for 14 days
complete as per drawings and technical
specifications.
5 DPC - 50mm thick CC 1:2:4 flooring 10 sqm - 3.938 3.938 3.94 5,911.25 2,327.61
6 CRS Masonry in CM (1:6): cum - 17.583 1.943 43.271 12.748 1.195 1.955 3.211 81.906 81.91 3,204.50 262,468.65
Construction of Coursed Rubble Masonary
with hard stone in foundation, plinth &
super structure upto +2.10m level
including cost of all materials, seigniorage
charges, labour and all operations for
constructing masonry, mixing cement
mortar, curing etc., complete for finished
item of work.
7 M-30 Grade: - - - - -
Supply and placing of the Ready Mix (RMC)
Standard Design Mix Concrete grade as per
IS 4926-2003 with minimum cement
content as per IS code 456-2000 using 20
mm graded metal, from standard suppliers
approved by the department including
pumping, laying concrete, vibrating, curing
etc. complete but excluding cots of steel
and its fabrication charges, centering,
shuttering for finished item of work.
a) Foundations, Plinth, Pedestals (Below Plinth) cum 7.395 - 35.163 844.356 11.055 6.750 18.834 4.219 4.464 932.236 349.93 326.57 255.74 5,953.00 1,522,417.93
b) Columns, Lintels, Water Tanks, Rcc Walls In cum 2.406 2.165 29.462 675.978 11.155 8.050 55.530 784.745 28.63 134.20 621.92 7,255.00 4,511,995.59
Buildings Upto A Height Of +3.60M
c) Rcc Slabs, Beams Upto A Height Of +3.60M cum - 2.631 400.000 6.413 3.500 0.330 412.874 412.87 5,383.00 2,222,499.13
8 Reinforcement Steel: MT 0.807 0.284 4.834 273.186 4.428 2.925 6.070 0.439 292.972 60.88 98.93 133.16 56,410.00 7,511,692.59
Supplying, fitting and placing HYSD bar
reinforcement in foundation complete as
per drawings and technical specifications for
Bars below 36 mm dia including over laps
and wastage, at all depths and heights,
complete
9 Shuttering : - - - - -
HIRE, LABOUR CHARGES FOR CENTERING &
SCAFFOLDING - Unsupported Height upto
3.66 M
Steel scaffolding pipes, jack Props, wallers,
Foot plates, brackets, steel Centering
Plates, etc., complete
a) Footings cum 6.435 22.372 645.723 11.055 6.750 18.834 4.219 1.264 716.652 679.99 36.66 611.00 22,401.61
WB
Storm Ele. Transform High Mast RA - 03
Security Platfor UG LC Old Boundary Paver Inspectio Toilet RA -
Sl. Gate Ramp Water Pannel er Foundatio MISC Total RA - 02 THIS Remark
Description of Item Units Room m Hopper Sump Sump Admin Wall Block n Block Staircase Barraction 01 Rate Amount
No Drain Room Foundatio n BILL s
2 nos Chamber
Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty n
Qty Qty Qty Qty Qty Qty Qty Qty
b) Pedestals cum - 12.791 107.495 3.200 123.486 72.27 51.22 942.00 48,245.63
c) Plinth Beams cum 0.960 0.609 29.462 330.923 11.155 8.050 55.530 436.689 86.73 349.96 2,468.50 863,873.55
d) Lintels cum - 1.427 1.427 1.43 2,095.50 2,990.83
e) Chajjas - Sunshades sqm - 1.663 1.663 1.66 366.50 609.49
f) Columns cum 2.406 211.609 214.015 214.01 1,704.50 364,788.51
g) Beams cum - 224.583 224.583 224.58 2,800.00 628,832.49
h) Slabs upto 150mm thick sqm - 23.605 ### 25.650 ### 1.650 1,609.905 ### 314.00 505,510.04
10 Brick work in CM (1:6) 230mm th.: cum 1.515 8.065 0.414 8.203 12.150 30.347 30.35 3,771.50 114,452.64
23 cm wide Brick masonry for below &
above plinth, super-structure on ground
floor in cm (1:6) using second class
traditional size bricks including cost of all
materials, seigniorage charges, labour and
all operations for constructing brick
masonry, mixing cement mortar, curing
etc., complete for finished item of work,
11 11.5 cm wide Brick masonry for super- sqm - 9.198 6.954 ### 6.436 60.938 60.94 293.50 17,885.30
structure on ground floor in cm (1:3) using
second class traditional size bricks including
cost of all materials, seigniorage charges,
labour and all operations for constructing
half brick masonry, mixing cement mortar,
curing etc., complete for finished item of
work, but excluding conveyance charges of
materials.
12 Inside Plastering-15mm th. in CM (1:4): 10 sqm ### 43.904 3.040 33.780 18.060 ### ### 1.380 249.377 249.38 1,365.50 34,052.39
Providing internal cement plaster 15 mm
thick for ceilings in a single coat in cement
mortar 1:4 without neeru finish to concrete
or brick surfaces, in all positions including
scaffolding and curing complete.
13 Out Side Plastering- Two coats(16mm th. in 10 sqm 107.994 ### 66.507 96.835 ### 8.450 9.985 3,132.791 ### 2,731.50 855,721.74
CM(1:6) & 4mm th. in CM(1:4):
Providing external cement plaster 20 mm
thick in 2 coats with cement mortar base
coat in CM (1:6), 16mm thick and top coat
in CM (1:4), 4mm thick with Dubara sponze
finishing to concrete or brick surfaces, in all
positions including scaffolding and curing
complete.
14 Ceiling Plastering 12mm th. in CM(1:4): 10 sqm 23.605 ### 37.018 37.02 1,228.00 4,545.83
Providing cement plaster 12 mm thick for
ceilings in a single coat in cement mortar
1:4 without neeru finish to concrete or brick
surfaces, in all positions including
scaffolding and
curing complete.
15 Painting (Inside) - Oil Bound Distemper: 10 sqm 43.904 ### ### 33.780 ### 2,792.110 ### 823.50 229,930.26
Painting to new walls with 2 coats of ready
mixed oil bound wahsable distemper of
approved brand and shade over a base coat
of appropriate primer of approved brand,
making 3 coats in all to give an even shade
after thourughly brushing the surface to
remove all dirt and remains of loose
powdered materials, including cost and
conveyance of all materials to work site and
all operational, incidental, labour charges
etc. complete for finished item of work for
internal walls
16 Painting (Out Side) - Snowmen: 10 sqm ### 85.954 ### 96.835 ### 404.491 404.49 1,240.50 50,177.12
Painting to new walls with 2 coats of water
proof cement paint of apporved brand and
shade over a base coat of approved cement
primer grade I making making 3 coats in all
to give an even shade after thourughly
brushing the surface to remove all dirt and
remains of loose powdered materials,
including cost and conveyance of all
materials to work site and all operational,
incidental, labour charges etc. complete for
finished item of work for external walls
17 Painting of Ceiling - White Wash: 10 sqm - 23.605 38.820 ### 75.838 75.84 196.00 1,486.43
White washing two coats with lime of
approved quality to give an even shade
after thoroughly brushing the surface to
remove all dirt and remains of loose
powdered materials including cost of all
materials, labour charges and incidental
such as scaffolding, lift charges etc.,
complete for finished item of work.
WB
Storm Ele. Transform High Mast RA - 03
Security Platfor UG LC Old Boundary Paver Inspectio Toilet RA -
Sl. Gate Ramp Water Pannel er Foundatio MISC Total RA - 02 THIS Remark
Description of Item Units Room m Hopper Sump Sump Admin Wall Block n Block Staircase Barraction 01 Rate Amount
No Drain Room Foundatio n BILL s
2 nos Chamber
Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty n
Qty Qty Qty Qty Qty Qty Qty Qty
18 Back filling with available earth: cum ### 14.299 14.30 18.50 264.52
Filling with useful available excavated earth
(excluding rock) in trenches, sides of
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work. (APSS NO. 309 & 310)
19 Earth filling (ordinary soil) Barrowed soil: cum - 13.605 ### ### 28.104 ### 0.336 8,080.044 ### 423.50 3,421,898.43
Filling with with approved material obtained
from borrow pits (excluding rock) in
trenches, sides of foundations and
basement with initial lead in layers not
exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming
including cost and conveyance of water to
work site and all operational, incidental,
labour charges, hire charges of T & P etc.,
complete for finished item of work.
20 Disposal of surplus earth: cum ### 14.331 ### ### 68.255 ### 9,479.274 ### 58.00 549,797.87
Removal of unsuitable / Unserviceable soil
including excavation, loading and disposal
upto 1000 m lead but excluding compaction
ground supporting embankment subgrade
replacement by suitable soil, which shall be
paid separately as per Clause 303.5.2 as
per Technical Specification Clause 302.3.11
MORD / 301 MORTH
23 Flooring with Ceramic Tiles : 10 sqm ### 55.325 55.33 7,665.00 42,406.61
Flooring with ceramic tiles, set over base
coat of cement mortar (1:8), 12 mm thick
over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like
consistency spread @ 3.3.kgs per sqm &
jointed neatly with white cement paste to
full depth mixed with pigment of matching
shade, including cost of all materials like
cement, sand water and tiles etc., complete,
including seigniorage charges, etc.,
complete for finished item of work.
WB
Storm Ele. Transform High Mast RA - 03
Security Platfor UG LC Old Boundary Paver Inspectio Toilet RA -
Sl. Gate Ramp Water Pannel er Foundatio MISC Total RA - 02 THIS Remark
Description of Item Units Room m Hopper Sump Sump Admin Wall Block n Block Staircase Barraction 01 Rate Amount
No Drain Room Foundatio n BILL s
2 nos Chamber
Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty n
Qty Qty Qty Qty Qty Qty Qty Qty
25 Flooring with high polished granite 16 to 18 10 sqm 3.800 3.800 3.80 4,469.92 1,698.57 RA
mm mm thick slabs other than black set
over base coat of cement mortar (1:8), 20
mm thick over CC bed already laid or RCC
roof slab, including neat cement slurry of
honey like consistency spread @ 3.3.kgs per
sqm & jointed neatly with white cement
paste mixed with pigment of matching
shade to full depth, including cost of all
materials like cement, sand water and
tilesetc., complete, including seigniorage
charges, labour charges for dressing of
tilesetc., complete for finished item of work,
but excluding the cost of conveyance of all
materials
26 Water Proof Plastering on roof: 10 sqm 21.050 21.050 21.05 3,421.50 7,202.12
Providing impervious coat to exposed RCC
roof slab surface with CM(1:3), 20mm thick
with 1kg of water proof compound per bag
of cement laid over roof when it is green
including cost of all materials, seigniorage
charges, excluding conveyance charges of
materials and including all operational,
incidental and labour charges for mixing
mortar, laying, rendering smooth and thread
lining, curing, rounding off junctions of wall
and slab etc,, complete for finished item of
work
27 Supply and Fixing of Alum. Doors: sqm 2.100 9.450 2.000 7.560 3.190 24.300 24.30 5,426.00 131,851.80
Providing and fixing colour anodized
aluminum Single / Double leaf door with
partly glazed and partly with Navopan
openable side hung shutter hinged or
pivoted, fabricated and fixed at all levels,
elevations and heights. The aluminum
extruded sections shall be of colour
anodized - 15 Microns high strength and
weight ratio joints mitered adjoined with
die cast cleats with fins to match the
sections of frames and shutters conforming
to Indal Sections. The rate includes 5mm
thick float glass plain (or) tinted of approved
make for all glazing with snap fit aluminum
beading and special PVC weather proof
gasket blinery etc., complete as per
specification for various structural openings
and all as per IS and approved make but
including cost of supplying and fixing
hardware fittings in hinges, lock and tower
bolt etc.
28 Supply and Fixing of Alum. Windows: sqm 8.100 2.880 2.100 13.080 13.08 5,426.00 70,972.08
Supplying, fitting and fixing in position UV
resistant powder coated/ anodized
aluminum windows (fixed/ open able/
sliding type) 4mm thk. float glass of
approved make with frames and shutters of
standard anodized/ powder coated
aluminum sections locking arrangement,
stays, all as per attached drawings,
specifications and directions of the Engineer
WB
Storm Ele. Transform High Mast RA - 03
Security Platfor UG LC Old Boundary Paver Inspectio Toilet RA -
Sl. Gate Ramp Water Pannel er Foundatio MISC Total RA - 02 THIS Remark
Description of Item Units Room m Hopper Sump Sump Admin Wall Block n Block Staircase Barraction 01 Rate Amount
No Drain Room Foundatio n BILL s
2 nos Chamber
Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty n
Qty Qty Qty Qty Qty Qty Qty Qty
33 Structural Steel: MT 0.563 0.071 1.395 7.738 8.109 3.197 21.073 21.07 82,855.00 1,746,007.03
Structural steel work in MS angles, flats,
plates etc., at all levels below / above
ground level including supplying steel
sections / plate conforming to IS 2062
transporting, cutting, fabricating using
welding / bolts, weld rods and / or bolts and
nuts from approved source, erecting using
derecks / pulley or any suitable means,
fixing in position and painting with one coat
of approved red oxide zinc chromate primer
and two coats of enamel paint of approved
shade for all exposed surfaces, making
necessary opening in the A. C. cladding for
fixing the lateral structural steel supports
including clearing the debris generated, by
mechanical means of transport up to a lead
of 2 Km. complete as directed by Engineer-
in-Charge.
34 Plastering with CM (1:3), 12 mm thick with 10 sqm ### ### ### 635.270 635.27 1,480.00 940,199.05
waterproofing compound
35 25 dia MS Rod With PVC Covering: Each 9.000 9.000 18.000 18.00 193.50 3,483.00
Providing and fixing of 25mm square M.S
footrest, including cost of materials, labour
charges, curing complete as per
specifications.
36 SFRC Manhole Cover of 600 X 600mm dia of Each 1.000 1.000 2.000 2.00 2,000.00 4,000.00
medium duty:
Man cover with SFRC Cover with frame
( Medium Duty) Total weight of cover with
frame tobe not less than 48 kg( Wt of Cover
33 Kg & Frame 15 Kg) as per standard
design including cost of all materils labour
charges etc., complete as per the
specifications.
45 Masonry work in CM (1:8) prop with Flyash cum 75.085 75.085 75.08 6,781.00 509,148.24
Cement solid blocks of size 290 x 225 x 140
mm for manufacturing of flyash solid blocks
using flyash of 80 kgs, cement of 15 kgs.
Gypsum of 5 kgs. and stone dust including
cost and conveyance of all materials, labour
charges, seiniorage charges, scaffolding and
curing etc., cpomplete with a compresive
streangth not lessthan 50 kg/sqm for walls
for Superstructure Walls.
46 Anchor Bolts with Template: nos 12.000 12.000 12.00 1,000.00 12,000.00
Supplying & Fixing of MS Foundation bolts of
size 25 mm dia & above length 1.0 mtr &
above as per level and line including labour
charges etc,.&Templete Complete.
WB
Storm Ele. Transform High Mast RA - 03
Security Platfor UG LC Old Boundary Paver Inspectio Toilet RA -
Sl. Gate Ramp Water Pannel er Foundatio MISC Total RA - 02 THIS Remark
Description of Item Units Room m Hopper Sump Sump Admin Wall Block n Block Staircase Barraction 01 Rate Amount
No Drain Room Foundatio n BILL s
2 nos Chamber
Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty n
Qty Qty Qty Qty Qty Qty Qty Qty
49 Roofing will be provided with 0.5mm thick sqm 2.772 154.395 157.167 157.17 822.00 129,191.27
galvanized / pre painted G.I. profiled sheets
fixed to the purlins with 14 size self drilling
screws with neoprene washer. Side laps are
stitched with self tapping / drilling screws.
End laps are to be sealed with 25x3 mm
Butyl tape. The sheets are provided with
anti capillary grove.
50 Road Marking with Hot applied nos 27.416 27.416 27.42 850.00 23,303.18 PO
Thermoplastic compound with reflector
Glass Beads on CC in white Colour
(Proveding and laying of Hot applied
Thermoplastic compound 1.0 mm Thick as
per Specification & recommendation /
approval of engineer at site with fixing and
fixers.
51 Cat eyes road Studs nos 138.000 138.000 138.00 584.00 80,592.00 PO
52 Meadian Markers nos 92.000 92.000 92.00 584.00 53,728.00 PO
53 Supply and fixing of Rubber Shock Absorber nos 12.000 12.000 12.00 1,402.00 16,824.00 PO
of Column Saftey & Protection in Lower
operation area.
54 Supply and fixing of Sintex Water Tank - Lts ### 5,000.000 ### 5.75 28,750.00
5000 Lts
55 Greenbelt sqm 250.000 250.000 250.00 176.00 44,000.00
56 Bore Well nos 1.000 1.000 1.00 160,000.00 160,000.00 PO
57 6 HP Pump nos 1.000 1.000 1.00 99,012.00 99,012.00 PO
58 Weigh Bridge Equipment nos 2.000 2.000 2.00 937,536.00 1,875,072.00
59 Weigh Bridge Equipment - Systems nos 2.000 2.000 2.00 32,550.00 65,100.00 PO
Hp Pro 3330 Desktop.
60 Weigh Bridge Equipment - Printers nos 2.000 2.000 2.00 6,615.00 13,230.00 PO
AP Leaserjet 1020 Printer
61 Weigh Bridge Equipment - UPS nos 1.000 1.000 1.00 25,200.00 25,200.00 PO
2 KVA UPS with Battery - 30 Min Backup
62 Electrical Works LS 1.000 1.000 1.00 ### 3,301,975.00
2 Filling with with sand in trenches, sides of cum 2.93 581.50 1,701.76
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work.
4 M-30 Grade: -
Supply and placing of the Ready Mix (RMC)
Standard Design Mix Concrete grade as per
IS 4926-2003 with minimum cement
content as per IS code 456-2000 using 20
mm graded metal, from standard suppliers
approved by the department including
pumping, laying concrete, vibrating, curing
etc. complete but excluding cots of steel
and its fabrication charges, centering,
shuttering for finished item of work.
b) Columns, Lintels, Water Tanks, Rcc Walls In cum 2.41 7,255.00 17,453.35
Buildings Upto A Height Of +3.60M
c) Rcc Slabs, Beams Upto A Height Of +3.60M cum - 5,383.00 -
6 Shuttering :
HIRE, LABOUR CHARGES FOR CENTERING &
SCAFFOLDING - Unsupported Height upto
3.66 M
Steel scaffolding pipes, jack Props, wallers,
Foot plates, brackets, steel Centering
Plates, etc., complete
2 Filling with with sand in trenches, sides of cum 1.603 581.500 932.331
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work.
5 Plain Cement concrete Grade M10 - Nominal cum 2.405 4,163.000 10,011.932
Mix upto Plinth level using 40mm metal
using concrete mixer
Providing concrete for plain concrete in
open foundations upto plinth using 40 mm
nominal size Graded hard stone aggregate,
mixed, placed in foundation and compacted
by vibration including curing for 14 days
complete as per drawings and technical
specifications.
b) Columns, Lintels, Water Tanks, Rcc Walls In cum 2.165 7,255.000 15,707.692
Buildings Upto A Height Of +3.60M
c) Rcc Slabs, Beams Upto A Height Of +3.60M cum 2.631 5,383.000 14,163.750
9 Shuttering : sqm - -
HIRE, LABOUR CHARGES FOR CENTERING &
SCAFFOLDING - Unsupported Height upto
3.66 M
Steel scaffolding pipes, jack Props, wallers,
Foot plates, brackets, steel Centering
Plates, etc., complete
12 Plastering -
a) Inside Plastering-15mm th. in CM (1:4): sqm 43.904 1,365.500 59,950.229
Providing internal cement plaster 15 mm
thick for ceilings in a single coat in cement
mortar 1:4 without neeru finish to concrete
or brick surfaces, in all positions including
scaffolding and curing complete.
b) Out Side Plastering- Two coats(16mm th. in sqm 107.994 2,731.500 ###
CM(1:6) & 4mm th. in CM(1:4):
Providing external cement plaster 20 mm
thick in 2 coats with cement mortar base
coat in CM (1:6), 16mm thick and top coat
in CM (1:4), 4mm thick with Dubara sponze
finishing to concrete or brick surfaces, in all
positions including scaffolding and curing
complete.
14 Earth filling (ordinary soil) Barrowed soil: cum 13.605 423.500 5,761.593
Filling with with approved material obtained
from borrow pits (excluding rock) in
trenches, sides of foundations and
basement with initial lead in layers not
exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming
including cost and conveyance of water to
work site and all operational, incidental,
labour charges, hire charges of T & P etc.,
complete for finished item of work.
Sl.
Description of Item Nos Depth Qty Units
No Length Width Remarks
For Windows (W1) -4 1.500 0.230 1.200 (1.656)
For Windows (W2) -1 0.750 0.230 1.200 (0.207)
Sill Protection : -
For Windows (W1) -4 2.000 0.230 0.150 (0.276)
For Windows (W2) -1 1.250 0.230 0.150 (0.043)
8.065 cum
17 RCC - M30
For CRS Masonary - Beam 1 ### 0.480 0.075 0.609
For Sill protection : -
For Windows (W1) 4 2.000 0.230 0.150 0.276
For Windows (W2) 1 1.250 0.230 0.150 0.043
ForLintel Beam : -
For Long Wall 1 6.160 0.230 0.250 0.354
1 6.160 0.230 0.300 0.425
For Short Wall 2 2.860 0.230 0.250 0.329
For Sunshade 1 2.860 0.450 0.100 0.129
For Slab 1 7.360 2.860 0.125 2.631
4.796 cum
a) Foundations, Plinth, Pedestals (Below - cum
Plinth)
b) Columns, Lintels, Water Tanks, Rcc Walls 2.165 cum
In Buildings Upto A Height Of +3.60M
c) Rcc Slabs, Beams Upto A Height Of +3.60M 2.631 cum
18 Shuttering
Plinth Beams 0.609 cum
Lintels 1.427 cum
Chajjas - Sunshades 1 2.860 0.450 1.287
1 3.760 0.100 0.376
1.663 sqm
Slabs upto 150mm thick
For Slab 1 7.360 2.860 21.050
1 ### 0.125 2.555
23.605 sqm
19 115 mm th. Brick work in CM (1:4)
For Long Wall 2 7.360 0.450 6.624
For Short Wall 2 2.860 0.450 2.574
For Platform 6 0.500 0.750 2.250
9.198 sqm
20 Plastering
a) Inside
For Long wall 2 5.700 3.030 34.542
For Short Wall 2 2.400 3.030 14.544
For Platform 12 0.500 0.750 4.500
6 0.115 0.750 0.518
Deductions : -
For Door (D1) -1 1.000 2.100 (2.100)
For Windows (W1) -4 1.500 1.200 (7.200)
For Windows (W2) -1 0.750 1.200 (0.900)
43.904 sqm
b) Outside
For Long wall 2 6.160 3.030 37.330
For Short Wall 2 2.860 3.030 17.332
For Parapet Wall 4 7.360 1.015 29.882
Sl.
Description of Item Nos Depth Qty Units
No Length Width Remarks
4 2.860 1.015 11.612
Deductions : -
For Door (D1) -1 1.000 2.100 (2.100)
For Windows (W1) -4 1.500 1.200 (7.200)
For Windows (W2) -1 0.750 1.200 (0.900)
85.954 sqm
c) Ciling
For Slab 1 7.360 2.860 21.050
1 ### 0.125 2.555
23.605 sqm
21 Painting for Wall
a) Inside - OBD 43.904 sqm
b) Outside - Snowcem 85.954 sqm
c) Ceiling - White Wash 23.605 sqm
22 Water Proof Plaster CM (1:3) with Slop 1% 1 7.360 2.860 21.050 sqm
23 Supply and fixing of Alu. Doors
For Door (D1) 1 1.000 2.100 2.100 sqm
24 Supply and fixing of Alu. windows
For Windows (W1) 4 1.500 1.200 7.200
For Windows (W2) 1 0.750 1.200 0.900
8.100 sqm
25 Sunlight Shield
For Door (D1) 2 1.000 1.500 3.000
For Windows (W1) 8 1.500 1.200 14.400
For Windows (W2) 2 0.750 1.200 1.800
19.200sqm
26 PVC 110mm dia (Rain Water drain Pipe) 1 3.200 3.200rmt
27 Back filling 10.203cum
28 Disposal of Earth 14.331cum
No.
Cuttin Weigh
of Dia of no. Total Total
29 Reinforcement Steel g t of
Unit Bar Bars Length Weight
Length Bar
s
Damp Proof Course
Horizontal 8 Y - 3 nos. 1 8 1 ### 18.320 0.395 7.238
1 8 1 ### 15.120 0.395 5.973
1 8 1 ### 16.720 0.395 6.605
Stirrupes - 8 Y @ 200 mm C/C 1 8 85 0.550 46.750 0.395 18.469
Lintel Beam - LB1 Size : 6.160 x 0.230 x 0.250 m
Bottom & Top 12 Y - 3 nos. 1 12 3 6.380 19.140 0.889 17.013
Stirrupes - 8 Y @ 250 mm C/C 1 8 26 0.880 22.880 0.395 9.039
Lintel Beam - LB2 Size : 6.160 x 0.230 x 0.300 m
Bottom & Top 12 Y - 3 nos. 1 12 3 6.480 19.440 0.889 17.280
Stirrupes - 8 Y @ 250 mm C/C 1 8 26 0.980 25.480 0.395 10.066
Lintel Beam - LB3 Size : 2.860 x 0.230 x 0.250 m
Bottom & Top 12 Y - 3 nos. 2 12 3 3.080 18.480 0.889 16.427
Stirrupes - 8 Y @ 250 mm C/C 2 8 13 0.880 22.880 0.395 9.039
Sunshade Size : 2.860 x 0.450 x 0.100 m
1 8 13 0.850 11.050 0.395 4.365
1 8 6 2.780 16.680 0.395 6.590
Slab Size : 7.360 x 2.860 x 0.125 m
Long Span - 8 Y @ 200 mm C/C 1 8 16 7.410 ### 0.395 46.839
Extra Bar - 8 Y @ 200 C/C 1 8 16 2.155 34.480 0.395 13.622
1 8 16 1.855 29.680 0.395 11.725
Short Span - 8 Y @ 150 mm C/C 1 8 50 2.910 ### 0.395 57.481
Extra Bar - 8 Y @ 150 C/C 1 8 50 0.655 32.750 0.395 12.938
Sl.
Description of Item Nos Depth Qty Units
No Length Width Remarks
1 8 50 0.655 32.750 0.395 12.938
30 Structural Steel
Canop
Angle 40 x 40 x 6 4 0.75 3.500 10.500
Sqre Pipe 25 x 25 2 6.160 4.910 60.491
70.991 kg
0.071 MT
31 Galvanized / pre painted G.I. profiled sheet 1 6.160 0.45 2.772 sqm
2 Filling with with sand in trenches, sides of cum 351.68 581.50 204,502.00
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work.
4 Plain Cement concrete Grade M10 - Nominal cum 92.95 4,163.00 386,950.85
Mix upto Plinth level using 40mm metal
using concrete mixer
Providing concrete for plain concrete in
open foundations upto plinth using 40 mm
nominal size Graded hard stone aggregate,
mixed, placed in foundation and compacted
by vibration including curing for 14 days
complete as per drawings and technical
specifications.
b) Columns, Lintels, Water Tanks, Rcc Walls In cum 675.98 7,255.00 4,904,217.29
Buildings Upto A Height Of +3.60M
c) Rcc Slabs, Beams Upto A Height Of +3.60M cum 400.00 5,383.00 2,153,200.00
7 Shuttering : - -
HIRE, LABOUR CHARGES FOR CENTERING &
SCAFFOLDING - Unsupported Height upto
3.66 M
Steel scaffolding pipes, jack Props, wallers,
Foot plates, brackets, steel Centering
Plates, etc., complete
13 Earth filling (ordinary soil) Barrowed soil: cum 7,812.18 423.50 3,308,459.05
Filling with with approved material obtained
from borrow pits (excluding rock) in
trenches, sides of foundations and
basement with initial lead in layers not
exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming
including cost and conveyance of water to
work site and all operational, incidental,
labour charges, hire charges of T & P etc.,
complete for finished item of work.
DETAILS OF COLUMNS
FOOTING SIZE
Sl.No. COLUMN TYPE No.s
LENGTH BREADTH
1 C1 7 0.750 0.750
2 C2 6 0.750 0.750
3 C3 30 0.600 0.600
4 C4 3 0.600 0.850
5 C5 21 0.600 0.600
6 C5a 1 0.600 0.600
7 C6 3 0.600 0.850
Col.
Soil Footing PB Col. Depth RB
PCC PCC top Footing Footing Footing PB top Slab Height
S.No. Description Bottom Sand Filling Beam bottom upto PB Bottom
Depth level Depth Top level Beam Top level Top LVL upto slab
level Depth level Top LVL
Bottom
1 Grid A,Retaining wall - C3,C3 94.590 0.300 0.100 94.990 0.400 95.390 0.600 95.990 97.650 98.100 101.000 100.825
2 Grid B - CF1/C1,C1 94.394 0.300 0.100 94.794 0.500 95.294 0.700 95.994 97.650 98.100 2.106 101.740 100.990 2.890
3 Grid C - CF1/C1,C1 94.438 0.300 0.100 94.838 0.500 95.338 0.700 96.038 97.650 98.100 2.062 102.190 101.440 3.340
4 Grid D - CF1/C1,C1 94.198 0.300 0.100 94.598 0.500 95.098 0.700 95.798 97.650 98.100 2.302 102.650 101.900 3.800
5 Grid E - CF1/C2,C2 93.858 0.300 0.100 94.258 0.500 94.758 0.700 95.458 97.650 98.100 2.642 103.110 102.360 4.260
6 Grid F - CF2/C2,C2 93.783 0.300 0.100 94.183 0.500 94.683 0.700 95.383 97.650 98.100 2.717 103.580 102.830 4.730
7 Grid G - CF3/C2,C3 93.526 0.300 0.100 93.926 0.500 94.426 0.700 95.126 97.650 98.100 2.974 103.970 103.220 5.120
8 Raft - 1 93.553 0.300 0.100 93.953 0.900 94.853 - 94.853 97.650 98.100 3.247 104.150 103.400 5.300
9 Grid J/1,2 - F1/C4.C4 93.660 0.300 0.100 94.060 0.800 94.860 - 94.860 97.650 98.100 3.240 104.150 103.400 5.300
10 Grid J/3,4 - CF5/C5,C5 94.668 0.300 0.100 95.068 0.650 95.718 0.350 96.068 97.650 98.100 2.032 104.150 103.400 5.300
Col.
Soil Footing PB Col. Depth RB
PCC PCC top Footing Footing Footing PB top Slab Height
S.No. Description Bottom Sand Filling Beam bottom upto PB Bottom
Depth level Depth Top level Beam Top level Top LVL upto slab
level Depth level Top LVL
Bottom
11 Grid K/3,4 - CF5/C5,C5 94.614 0.300 0.100 95.014 0.650 95.664 0.350 96.014 97.650 98.100 2.086 104.150 103.400 5.300
12 Grid 3/L,M - CF4/C5,C3 94.560 0.300 0.100 94.960 0.500 95.460 0.700 96.160 97.650 98.100 1.940 104.150 103.400 5.300
13 Grid 4/L,M - CF4/C5,C3 94.340 0.300 0.100 94.740 0.500 95.240 0.700 95.940 97.650 98.100 2.160 104.150 103.400 5.300
14 Grid 5,6/L,M - CF4a/C3,C3,C3,C6 94.020 0.300 0.100 94.420 0.600 95.020 0.600 95.620 97.650 98.100 2.480 104.150 103.400 5.300
15 Grid K/5,6 - F1/C5,C6 94.586 0.300 0.100 94.986 0.800 95.786 - 95.786 97.650 98.100 2.314 104.150 103.400 5.300
16 Grid J/5,6 - F1/C4,C6 94.586 0.300 0.100 94.986 0.800 95.786 - 95.786 97.650 98.100 2.314 104.150 103.400 5.300
17 Grid J/7 - F2/C5 94.575 0.300 0.100 94.975 0.800 95.775 - 95.775 97.650 98.100 2.325 104.150 103.400 5.300
18 Grid K/7 - F2/C2 95.175 0.300 0.100 95.575 0.800 96.375 - 96.375 97.650 98.100 1.725 104.150 103.400 5.300
19 Grid 7/K',L - CF7/C3 94.360 0.300 0.100 94.760 0.650 95.410 0.350 95.760 97.650 98.100 2.340 104.150 103.400 5.300
20 Grid 7/M,M' - CF6/C3 94.470 0.300 0.100 94.870 0.750 95.620 0.250 95.870 97.650 98.100 2.230 104.150 103.400 5.300
21 Grid Y - CF8/C3,C3 91.350 0.650 0.530 92.530 0.500 93.030 0.700 93.730 97.650 98.100 4.370 104.150 103.400 5.300
22 Grid X - CF8/C3,C3 91.603 0.350 0.400 92.353 0.500 92.853 0.700 93.553 97.650 98.100 4.547 104.150 103.400 5.300
23 Grid W - CF10/C3,C3 91.560 0.400 0.450 92.410 0.500 92.910 0.700 93.610 97.650 98.100 4.490 103.150 102.400 4.300
24 Grid W - CF9/C3,C3 94.470 0.300 0.100 94.870 0.750 95.620 - 95.620 97.650 98.100 2.480 103.150 102.400 4.300
25 Grid V - CF8/C1,C5 91.818 0.400 0.400 92.618 0.500 93.118 0.700 93.818 97.650 98.100 4.282 102.610 101.860 3.760
26 Raft - 2 93.210 0.300 0.100 93.610 0.700 94.310 - 94.310 97.650 98.100 3.790 101.790 101.040 2.940
27 Grid S - CF10/C5,C5 93.638 0.300 0.100 94.038 0.500 94.538 0.700 95.238 97.650 98.100 2.862 101.380 100.630 2.530
28 Grid R - CF10/C5,C5a 94.570 0.300 0.100 94.970 0.500 95.470 0.700 96.170 97.650 98.100 1.930 100.900 100.150 2.050
29 Grid Q - CF10/C5.C5 95.170 0.300 0.100 95.570 0.500 96.070 0.700 96.770 97.650 98.100 1.330 100.310 99.560 1.460
30 Grid P Retaining wall - C5,C5 95.380 0.300 0.100 95.780 0.400 96.180 0.600 96.780 97.650 98.100 1.320 99.500 99.325
Area- 1
Pre Level Post Leve
99.06 98.030
98.898 98.030
99.21 98.030
97.871 98.030
98.572 98.030
100.865 98.030
99.708 98.030
100.253 98.030
99.749 98.030
101.308 98.030
99.549 98.030
Cutting Depth : 1.519 m
Area of cutting : 325.800 sqm
Quantity : 495.021 cum
Area- 2
Per Level Post Level
97.782 99.330
98.819 99.330
98.331 99.330
98.793 99.330
99.008 99.330
99.318 99.330
99.789 99.330
98.834 99.330
Filling Depth : 0.496 m
Area of cutting : 336.000 sqm
Quantity : 166.560 cum
Area- 3
Per Level Post Level
100.000 100.630
100.800 100.630
100.616 100.630
100.919 100.630
100.220 100.630
100.234 100.630
99.866 100.630
100.379 100.630
Filling Depth : 0.251 m
Total Area : 285.000 sqm
WBP Area - 2 nos : 72.000 sqm
Area of cutting : 213.000 sqm
Quantity : 53.402 cum
5 Shuttering
a) Footings cum 645.723 cum
18 Expansion Joint
Angle 75 x 75 x 6
Gride - 1&2 2 19.855 13.600 540.056
Gride - 5&6 2 21.404 13.600 582.189
### kg
Plate 40 x 6
Gride - 1&2 1 19.855 0.140 0.006 131.324
Gride - 5&6 1 21.404 0.140 0.006 141.570
272.894 kg
12 Dia Bolt at 300 C/C
Gride - 1&2 68 0.135 9.180
PLINTH BEAM :
1 Plinth Beam (PB1) - Gride - A - 1 Size : ### 0.450 0.450
Main Bar :
Bottom Main Bar 4 nos - 16 Y 16 1 4 63.144 252.576 1.580 399.132
8 Plinth Beam (PB7) - Gride - B,C,D & E Size : 8.000 0.300 0.450
Main Bar :
Bottom Main Bar 3 nos - 20 Y 20 4 3 8.640 103.680 2.469 256.000
Top Main Bar 3 nos - 20 Y 20 4 3 8.640 103.680 2.469 256.000
Extra Bar Bottom :
Extra Bar 3 nos. - 16 Y @ Gride - B,C.D&E 16 4 3 8.640 103.680 1.580 163.840
Extra Bar Top :
Extra Bar 3 nos. - 20 Y 20 8 3 2.920 70.080 2.469 173.037
SRIRRUPS :
2 L - 8 Y @ 100 mm C/C - Gride - Gride - 8 4 20 1.420 113.600 0.395 44.879
B,C.D&E
2 L - 8 Y @ 150 mm C/C - Gride - B,C.D&E 8 4 20 1.420 113.600 0.395 44.879
2 L - 8 Y @ 100 mm C/C - Gride - B,C.D&E 8 4 20 1.420 113.600 0.395 44.879
ROOF BEAM :
1 Roof Beam (B1) - Gride A - 1 Size: ### 0.300 0.600
16 Roof Beam (B16) - Gride A,B.C.D & E Size: 8.000 0.600 0.750
Main Bar :
Bottom Main Bar 6 nos. 25 Y 25 5 6 8.940 268.200 3.858 1,034.722
Top Main Bar 6 nos. 25 Y 25 5 6 8.940 268.200 3.858 1,034.722
Extra Bar Bottom :
Extra Bar 6 nos. - 25 Y 25 5 6 6.000 180.000 3.858 694.444
Extra Bar 2 nos. - 20 Y 20 5 2 6.000 60.000 2.469 148.148
Extra Bar Top :
Extra Bar 6 nos. - 25 Y (Both Side) 25 5 12 3.220 193.200 3.858 745.370
23 Roof Beam (B22a) - Gride (J - L') 1 & 2 Size: ### 0.600 0.750
Main Bar :
Bottom Main Bar 6 nos. 25 Y 25 2 6 20.785 249.420 3.858 962.269
Top Main Bar 6 nos. 20 Y 25 2 6 20.785 249.420 3.858 962.269
Extra Bar Bottom :
Extra Bar 4 nos. - 20 Y Gride J - K 20 2 4 5.700 45.600 2.469 112.593
Extra Bar 4 nos. - 20 Y Gride K - L 20 2 4 5.000 40.000 2.469 98.765
Extra Bar 4 nos. - 20 Y Gride L - L' 20 2 4 3.745 29.960 2.469 73.975
Extra Bar Top :
Extra Bar 6 nos. - 20 Y Gride - J 20 2 6 3.320 39.840 2.469 98.370
Extra Bar 6 nos. - 20 Y Gride - K 20 2 6 4.200 50.400 2.469 124.444
Extra Bar 4 nos. - 20 Y Gride - K 20 2 4 4.200 33.600 2.469 82.963
Extra Bar 6 nos. - 20 Y Gride - L 20 2 6 3.600 43.200 2.469 106.667
Extra Bar 6 nos. - 20 Y Gride - L' 20 2 6 2.450 29.400 2.469 72.593
Skin Reinforcement :
1 x 3 - 12 Y 12 2 6 19.785 237.420 0.889 211.040
SRIRRUPS :
4 L - 12 Y @ 100 mm C/C Gride - J 12 2 20 2.700 108.000 0.889 96.000
12 2 20 2.220 88.800 0.889 78.933
4 L - 8 Y @ 150 mm C/C Gride J - K 8 2 22 2.700 118.800 0.395 46.933
8 2 22 2.220 97.680 0.395 38.590
4 L - 12 Y @ 100 mm C/C Gride - K 12 2 20 2.700 108.000 0.889 96.000
12 2 20 2.220 88.800 0.889 78.933
4 L - 12 Y @ 100 mm C/C Gride - K 12 2 19 2.700 102.600 0.889 91.200
12 2 19 2.220 84.360 0.889 74.987
4 L - 8 Y @ 150 mm C/C Gride K - L 8 2 21 2.700 113.400 0.395 44.800
8 2 21 2.220 93.240 0.395 36.836
4 L - 12 Y @ 100 mm C/C Gride - L 12 2 19 2.700 102.600 0.889 91.200
12 2 19 2.220 84.360 0.889 74.987
4 L - 12 Y @ 100 mm C/C Gride - L 12 2 14 2.700 75.600 0.889 67.200
12 2 14 2.220 62.160 0.889 55.253
4 L - 8 Y @ 150 mm C/C Gride L - M 8 2 13 2.700 70.200 0.395 27.733
8 2 13 2.220 57.720 0.395 22.803
4 L - 12 Y @ 100 mm C/C Gride - M 12 2 14 2.700 75.600 0.889 67.200
12 2 14 2.220 62.160 0.889 55.253
Sl. Total Sl. Total Unit Sl. Total Unit Sl. Total Unit
Units
No Length Length No Length Length s No Length Length s No Length Length s
33 ### 15.597 33 7.739 8.639 33 7.739 8.639 33 ### 15.473
34 ### 15.586 34 7.258 8.158 34 7.258 8.158 34 ### 15.451
35 ### 15.575 35 7.536 8.436 35 7.536 8.436 35 ### 15.428
36 ### 15.563 36 7.671 8.571 36 7.671 8.571 36 ### 15.404
37 ### 15.551 37 7.803 8.703 37 7.803 8.703 37 ### 15.379
38 ### 15.538 38 7.933 8.833 38 7.933 8.833 38 ### 15.352
39 ### 15.524 39 8.061 8.961 39 8.061 8.961 39 ### 15.329
40 ### 15.509 40 8.187 9.087 40 8.187 9.087 40 ### 15.295
41 ### 15.493 41 8.310 9.210 41 8.310 9.210 41 ### 15.264
42 ### 15.477 42 8.432 9.332 42 8.432 9.332 42 ### 15.222
43 ### 15.460 43 8.551 9.451 43 8.551 9.451 43 ### 15.199
44 ### 15.442 44 8.668 9.568 44 8.668 9.568 44 ### 15.164
45 ### 15.423 45 8.784 9.684 45 8.784 9.684 45 ### 15.128
46 ### 15.404 46 8.897 9.797 46 8.897 9.797 46 ### 15.090
47 ### 15.384 47 9.009 9.909 47 9.009 9.909 47 ### 15.051
48 ### 15.363 48 9.118 10.018 48 9.118 10.018 48 ### 15.011
49 ### 15.341 49 9.226 10.126 49 9.226 10.126 49 ### 14.910
50 ### 15.318 50 9.332 10.232 50 9.332 10.232 50 ### 14.759
51 ### 15.295 51 9.437 10.337 51 9.437 10.337 51 ### 14.607
52 ### 15.270 52 9.539 10.439 52 9.539 10.439 52 ### 14.453
53 ### 15.245 53 9.641 10.541 53 9.641 10.541 53 ### 14.297
54 ### 15.219 54 9.740 10.640 54 9.740 10.640 54 ### 14.139
55 ### 15.192 55 9.838 10.738 55 9.838 10.738 55 ### 13.819
56 ### 15.164 56 9.934 10.834 56 9.934 10.834 56 ### 13.657
57 ### 15.135 57 ### 10.929 57 ### 10.929 57 ### 13.492
58 ### 15.106 58 ### 11.022 58 ### 11.022 58 ### 13.326
59 ### 15.075 59 ### 11.114 59 ### 11.114 59 ### 13.158
60 ### 15.043 60 ### 11.204 60 ### 11.204 60 ### 12.988
61 ### 15.011 61 ### 11.293 61 ### 11.293 61 ### 12.816
62 ### 14.940 62 ### 11.380 62 ### 11.380 62 ### 12.642
63 ### 14.820 63 ### 11.466 63 ### 11.466 63 ### 12.466
64 ### 14.699 64 ### 11.551 64 ### 11.551 64 ### 12.288
65 ### 14.576 65 ### 11.634 65 ### 11.634 65 ### 12.108
66 ### 14.453 66 ### 11.716 66 ### 11.716 66 ### 11.925
67 ### 14.328 67 ### 11.797 67 ### 11.797 67 ### 11.740
68 ### 14.203 68 ### 11.876 68 ### 11.876 68 ### 11.553
Sl. Total Sl. Total Unit Sl. Total Unit Sl. Total Unit
Units
No Length Length No Length Length s No Length Length s No Length Length s
69 ### 14.076 69 ### 12.450 69 ### 12.450 69 ### 11.364
70 ### 13.948 70 ### 12.031 70 ### 12.031 70 ### 11.171
71 ### 13.819 71 ### 12.107 71 ### 12.107 71 ### 10.977
72 ### 13.690 72 ### 12.181 72 ### 12.181 72 9.879 10.779
73 ### 13.558 73 ### 12.255 73 ### 12.255 73 9.679 10.579
74 ### 13.426 74 ### 12.327 74 ### 12.327 74 9.477 10.377
75 ### 13.293 75 ### 12.397 75 ### 12.397 75 9.271 10.171
76 ### 13.158 76 ### 12.467 76 ### 12.467 76 9.062 9.962
77 ### 13.022 77 ### 12.536 77 ### 12.536 77 8.850 9.750
78 ### 12.885 78 ### 12.603 78 ### 12.603 78 8.635 9.535
79 ### 12.747 79 ### 12.669 79 ### 12.669 79 8.416 9.316
80 ### 12.607 80 ### 12.734 80 ### 12.734 80 7.739 8.639
81 ### 12.466 81 ### 12.798 81 ### 12.798 81 7.515 8.415
82 ### 12.324 82 ### 12.861 82 ### 12.861 82 7.267 8.167
83 ### 12.180 83 ### 12.923 83 ### 12.923 83 7.025 7.925
84 ### 12.035 84 ### 12.984 84 ### 12.984 84 6.778 7.678
85 ### 11.888 85 ### 13.044 85 ### 13.044 85 6.527 7.427
86 ### 11.740 86 ### 13.102 86 ### 13.102 86 6.270 7.170
87 ### 11.591 87 ### 13.160 87 ### 13.160 87 6.007 6.907
88 ### 11.440 88 ### 13.217 88 ### 13.217 88 5.739 6.639
89 ### 11.287 89 ### 13.272 89 ### 13.272 89 5.465 6.365
90 ### 11.133 90 ### 13.327 90 ### 13.327 90 5.184 6.084
91 ### 10.977 91 ### 13.380 91 ### 13.380 91 4.896 5.796
92 9.919 10.819 92 ### 13.433 92 ### 13.433 92 4.601 5.501
93 9.760 10.660 93 ### 13.485 93 ### 13.485 93 4.297 5.197
94 9.599 10.499 94 ### 13.535 94 ### 13.535 94 3.985 4.885
95 9.436 10.336 95 ### 13.585 95 ### 13.585 95 3.662 4.562
96 9.271 10.171 96 ### 13.634 96 ### 13.634 96 3.329 4.229
97 9.104 10.004 97 ### 13.682 97 ### 13.682 97 2.985 3.885
98 8.935 9.835 98 ### 13.728 98 ### 13.728 98 2.627 3.527
99 8.764 9.664 99 ### 13.774 99 ### 13.774 99 2.254 3.154
100 8.591 9.491 100 ### 13.819 100 ### 13.819 100 1.865 2.765
101 8.416 9.316 101 ### 13.863 101 ### 13.863 101 1.456 2.356
102 8.239 9.139 102 ### 13.907 102 ### 13.907 102 1.024 1.924
103 8.059 8.959 103 ### 13.949 103 ### 13.949 103 0.565 1.465
104 7.877 8.777 104 ### 13.990 104 ### 13.990
Sl. Total Sl. Total Unit Sl. Total Unit Sl. Total Unit
Units
No Length Length No Length Length s No Length Length s No Length Length s
105 7.692 8.592 105 ### 14.031 105 ### 14.031 Total : ### rmt
106 7.505 8.405 106 ### 14.070 106 ### 14.070
107 7.315 8.215 107 ### 14.109 107 ### 14.109
108 7.123 8.023 108 ### 14.147 108 ### 14.147
109 6.927 7.827 109 ### 14.183 109 ### 14.183
110 6.527 7.427 110 ### 14.219 110 ### 14.219
111 6.322 7.222 111 ### 14.255 111 ### 14.255
112 6.113 7.013 112 ### 14.289 112 ### 14.289
113 5.901 6.801 113 ### 14.040 113 ### 14.040
114 5.685 6.585 114 ### 13.755 114 ### 13.755
115 5.465 6.365 115 ### 13.470 115 ### 13.470
116 5.541 6.441 116 ### 13.186 116 ### 13.186
117 5.012 5.912 117 ### 12.901 117 ### 12.901
118 4.779 5.679 118 ### 12.462 118 ### 12.462
119 4.541 5.441 119 ### 11.880 119 ### 11.880
120 4.297 5.197 120 ### 11.298 120 ### 11.298
121 4.048 4.948 121 9.816 10.716 121 9.816 10.716
122 3.792 4.692 122 9.234 10.134 122 9.234 10.134
123 3.531 4.431 123 8.652 9.552 123 8.652 9.552
124 3.261 4.161 124 8.071 8.971 124 8.071 8.971
125 2.985 3.885 125 7.489 8.389 125 7.489 8.389
126 2.699 3.599 126 6.907 7.807 126 6.907 7.807
127 2.405 3.305 127 6.325 7.225 127 6.325 7.225
128 2.100 3.000 128 5.743 6.643 128 5.743 6.643
129 1.784 2.684 129 5.161 6.061 129 5.161 6.061
130 1.456 2.356 130 4.580 5.480 130 4.580 5.480
131 1.112 2.012 131 3.998 4.898 131 3.998 4.898
132 0.752 1.652 132 3.416 4.316 132 3.416 4.316
133 0.372 1.272 133 2.834 3.734 133 2.834 3.734
134 2.252 3.152 134 2.252 3.152
135 1.670 2.570 135 1.670 2.570
136 1.088 1.988 136 1.088 1.988
137 0.507 1.407 137 0.507 1.407
Total : 1,618.010 rmt 1,317.174 rmt ### rmt
Sl. Total Sl. Total Unit Sl. Total Unit Sl. Total Unit
Units
No Length Length No Length Length s No Length Length s No Length Length s
RAFT - 2
Bottom 20 Y @ 100 mm C/C - Bottom 20 Y @ 100 mm C/C -
Sl. Total
Longer Span Sl. Total
Short Span
No Length Length No Length Length
1 7.135 7.835 1 5.917 6.617
2 7.168 7.868 2 5.970 6.670
3 7.196 7.896 3 6.019 6.719
4 7.223 7.923 4 6.068 6.768
5 7.250 7.950 5 6.113 6.813
6 0.025 0.725 6 6.167 6.867
7 7.300 8.000 7 6.217 6.917
8 7.324 8.024 8 6.266 6.966
9 7.347 8.047 9 6.315 7.015
10 7.369 8.069 10 6.365 7.065
11 7.390 8.090 11 6.414 7.114
12 7.411 8.111 12 6.464 7.164
13 7.430 8.130 13 6.513 7.213
14 7.449 8.149 14 6.562 7.262
15 7.467 8.167 15 6.612 7.312
16 7.484 8.184 16 6.661 7.361
17 7.500 8.200 17 6.710 7.410
18 7.516 8.216 18 6.760 7.460
19 7.530 8.230 19 6.809 7.509
20 7.744 8.444 20 6.859 7.559
21 7.557 8.257 21 6.908 7.608
22 7.569 8.269 22 6.957 7.657
23 7.580 8.280 23 7.007 7.707
24 7.590 8.290 24 7.056 7.756
25 7.600 8.300 25 7.105 7.805
26 7.608 8.308 26 7.155 7.855
27 7.616 8.316 27 7.204 7.904
28 7.623 8.323 28 7.254 7.954
29 7.629 8.329 29 7.303 8.003
30 7.634 8.334 30 7.350 8.050
31 7.638 8.338 31 7.404 8.104
32 7.642 8.342 32 7.451 8.151
Sl. Total Sl. Total Unit Sl. Total Unit Sl. Total Unit
Units
No Length Length No Length Length s No Length Length s No Length Length s
33 7.644 8.344 33 7.501 8.201
34 7.641 8.341 34 7.550 8.250
35 7.642 8.342 35 7.599 8.299
36 7.647 8.347 36 7.645 8.345
37 7.646 8.346 37 7.698 8.398
38 7.644 8.344 38 7.747 8.447
39 7.641 8.341 39 7.797 8.497
40 7.638 8.338 40 7.846 8.546
41 7.633 8.333 41 7.896 8.596
42 7.628 8.328 42 7.945 8.645
43 7.622 8.322 43 8.588 9.288
44 7.614 8.314 44 8.411 9.111
45 7.606 8.306 45 8.212 8.912
46 7.597 8.297 46 8.002 8.702
47 7.587 8.287 47 7.777 8.477
48 7.576 8.276 48 7.537 8.237
49 7.565 8.265 49 7.277 7.977
50 7.552 8.252 50 6.972 7.672
51 7.538 8.238 51 6.531 7.231
52 7.523 8.223 52 5.791 6.491
53 7.508 8.208 53 4.934 5.634
54 7.491 8.191 54 3.883 4.583
55 7.473 8.173 55 2.392 3.092
56 7.455 8.155
57 7.435 8.135 Total : 415.966 rmt
58 7.415 8.115
59 7.393 8.093
60 7.275 7.975
61 7.044 7.744
62 6.812 7.512
63 6.579 7.279
64 6.345 7.045
65 6.110 6.810
66 5.873 6.573
67 5.636 6.336
68 5.378 6.078
Sl. Total Sl. Total Unit Sl. Total Unit Sl. Total Unit
Units
No Length Length No Length Length s No Length Length s No Length Length s
69 5.158 5.858
70 4.917 5.617
71 4.675 5.375
72 4.432 5.132
73 4.188 4.888
74 3.942 4.642
75 3.695 4.395
76 3.447 4.147
77 3.198 3.898
78 2.947 3.647
79 2.695 3.395
80 2.441 3.141
81 2.187 2.887
82 1.930 2.630
83 1.673 2.373
84 1.414 2.114
85 1.153 1.853
86 0.892 1.592
87 0.628 1.328
88 0.363 1.063
89 0.100 0.800
2 Filling with with sand in trenches, sides of cum 3.933 581.50 2,287.04
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work.
3 Plain Cement concrete Grade M10 - Nominal cum 5.900 4,163.00 24,559.62
Mix upto Plinth level using 40mm metal
using concrete mixer
Providing concrete for plain concrete in
open foundations upto plinth using 40 mm
nominal size Graded hard stone aggregate,
mixed, placed in foundation and compacted
by vibration including curing for 14 days
complete as per drawings and technical
specifications.
b) Columns, Lintels, Water Tanks, Rcc Walls In cum 11.155 7,255.00 80,929.53
Buildings Upto A Height Of +3.60M
c) Rcc Slabs, Beams Upto A Height Of +3.60M cum 6.413 5,383.00 34,518.49
Sl. Unit
Description of item Qty Rate Amount
No s Remarks
in INR in INR
5 Shuttering :
HIRE, LABOUR CHARGES FOR CENTERING &
SCAFFOLDING - Unsupported Height upto
3.66 M
Steel scaffolding pipes, jack Props, wallers,
Foot plates, brackets, steel Centering
Plates, etc., complete
Sl. Unit
Description of item Qty Rate Amount
No s Remarks
in INR in INR
11 MT 4.428 ### ###
Reinforcement Steel:
Supplying, fitting and placing HYSD bar
reinforcement in foundation complete as
per drawings and technical specifications for
Bars below 36 mm dia including over laps
and wastage, at all depths and heights,
complete
2 Filling with with sand in trenches, sides of cum 2.444 581.50 1,421.19
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work.
3 Plain Cement concrete Grade M10 - Nominal cum 3.666 4,163.00 15,261.56
Mix upto Plinth level using 40mm metal
using concrete mixer
Providing concrete for plain concrete in
open foundations upto plinth using 40 mm
nominal size Graded hard stone aggregate,
mixed, placed in foundation and compacted
by vibration including curing for 14 days
complete as per drawings and technical
specifications.
b) Columns, Lintels, Water Tanks, Rcc Walls In cum 8.050 7,255.00 58,402.75
Buildings Upto A Height Of +3.60M
c) Rcc Slabs, Beams Upto A Height Of +3.60M cum 3.500 5,383.00 18,840.50
2 Filling with with sand in trenches, sides of cum 4.75 581.50 2,761.89
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work.
b) Columns, Lintels, Water Tanks, Rcc Walls In cum 14.73 7,255.00 ###
Buildings Upto A Height Of +3.60M
6 Shuttering : - -
HIRE, LABOUR CHARGES FOR CENTERING &
SCAFFOLDING - Unsupported Height upto
3.66 M
Steel scaffolding pipes, jack Props, wallers,
Foot plates, brackets, steel Centering
Plates, etc., complete
2 Filling with with sand in trenches, sides of cum 1.31 581.50 762.93
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work.
5 Plastering -
a) Inside Plastering-15mm th. in CM (1:4): 10 33.78 1,365.50 4,612.66
Providing internal cement plaster 15 mm sqm
thick for ceilings in a single coat in cement
mortar 1:4 without neeru finish to concrete
or brick surfaces, in all positions including
scaffolding and curing complete.
6 Painting
a) Painting (Inside) - Oil Bound Distemper: 10 33.78 823.50 2,781.78
Painting to new walls with 2 coats of ready sqm
mixed oil bound wahsable distemper of
approved brand and shade over a base coat
of appropriate primer of approved brand,
making 3 coats in all to give an even shade
after thourughly brushing the surface to
remove all dirt and remains of loose
powdered materials, including cost and
conveyance of all materials to work site and
all operational, incidental, labour charges
etc. complete for finished item of work for
internal walls
###
Remark
Sl. No Description of item nos Qty Units
Length Width Depth s
For Windows (W) -3 1.30 1.30 (5.07)
For Ventilator (V1) -9 1.00 0.45 (4.05)
For Ventilator (V2) -1 1.30 0.45 (0.59)
First Floor Out Side : ### sqm
Short Wall 2 3.46 3.00 20.76
Long Wall 2 6.93 3.00 41.58
Sunshade 1 2.14 0.60 1.28
Deductions : -
For Door (D) -1 1.00 2.00 (2.00)
For Windows (W) -2 1.20 1.20 (2.88)
Second Floor Out Side : -
Short Wall 2 3.46 3.00 20.76
Long Wall 2 6.93 3.00 41.58
Retaining Wall To Staircase 2 1.10 1.23 2.71
1 1.10 0.30 0.33
Deductions : -
For Door (D) -1 1.00 2.10 (2.10)
For Windows (W) -3 1.30 1.30 (5.07)
For Ventilator (V1) -9 1.00 0.45 (4.05)
For Ventilator (V2) -1 1.30 0.45 (0.59)
For Staircase 2 2.30 1.20 5.52
1 9.80 1.20 11.76
Parapet Wall (First Floor) 1 8.45 1.20 10.14
1 6.00 1.20 7.20
Parapet Wall (Second Floor) 1 23.18 0.87 20.05
### sqm
Ceiling
First Floor 1 6.47 3.00 19.41
Second Floor 1 6.47 3.00 19.41
38.82 sqm
10 RCC (M30)
Staircase Slab 1 1.50 1.10 0.20 0.33 cum
11 Shuttering
Staircase Slab 1 1.50 1.10 1.65 sqm
12 CRS Masonary
Staircase 1 1.15 1.10 0.30 0.38
Steps 7 1.10 0.14 1.06
Retaining Wall To Staircase 1 1.10 0.30 1.53 0.50
1.94 cum
13 Painting For MS Door & Windows
For Door 1 1.00 2.10 2.10
For Windows (W) 3 1.30 1.30 5.07
For Ventilator (V1) 9 1.30 0.45 5.27
For Ventilator (V2) 1 1.00 0.45 0.45
12.89
40% of Total Area 1 12.89 0.40 5.15 sqm
14
2 Filling with with sand in trenches, sides of cum 15.70 581.50 9,126.79
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work.
b) Columns, Lintels, Water Tanks, Rcc Walls In cum 55.53 7,255.00 402,868.66
Buildings Upto A Height Of +3.60M
6 Shuttering : - -
HIRE, LABOUR CHARGES FOR CENTERING &
SCAFFOLDING - Unsupported Height upto
3.66 M
Steel scaffolding pipes, jack Props, wallers,
Foot plates, brackets, steel Centering
Plates, etc., complete
2 Filling with with sand in trenches, sides of cum 1.67 581.50 972.62
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work.
4 Plastering -
a) Inside Plastering-15mm th. in CM (1:4): 10 58.47 1,365.50 7,984.52
Providing internal cement plaster 15 mm sqm
thick for ceilings in a single coat in cement
mortar 1:4 without neeru finish to concrete
or brick surfaces, in all positions including
scaffolding and curing complete.
5 Painting -
a) Painting (Inside) - Oil Bound Distemper: 10 58.47 823.50 4,815.27
Painting to new walls with 2 coats of ready sqm
mixed oil bound wahsable distemper of
approved brand and shade over a base coat
of appropriate primer of approved brand,
making 3 coats in all to give an even shade
after thourughly brushing the surface to
remove all dirt and remains of loose
powdered materials, including cost and
conveyance of all materials to work site and
all operational, incidental, labour charges
etc. complete for finished item of work for
internal walls
2 Filling with with sand in trenches, sides of cum 0.23 581.50 130.84
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work.
3 M-30 Grade: - -
Supply and placing of the Ready Mix (RMC)
Standard Design Mix Concrete grade as per
IS 4926-2003 with minimum cement
content as per IS code 456-2000 using 20
mm graded metal, from standard suppliers
approved by the department including
pumping, laying concrete, vibrating, curing
etc. complete but excluding cots of steel
and its fabrication charges, centering,
shuttering for finished item of work.
4 Shuttering : - -
HIRE, LABOUR CHARGES FOR CENTERING &
SCAFFOLDING - Unsupported Height upto
3.66 M
Steel scaffolding pipes, jack Props, wallers,
Foot plates, brackets, steel Centering
Plates, etc., complete
2 Filling with with sand in trenches, sides of cum 0.441 581.50 256.44
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work.
4 M-30 Grade: - -
Supply and placing of the Ready Mix (RMC)
Standard Design Mix Concrete grade as per
IS 4926-2003 with minimum cement
content as per IS code 456-2000 using 20
mm graded metal, from standard suppliers
approved by the department including
pumping, laying concrete, vibrating, curing
etc. complete but excluding cots of steel
and its fabrication charges, centering,
shuttering for finished item of work.
5 Shuttering :
HIRE, LABOUR CHARGES FOR CENTERING &
SCAFFOLDING - Unsupported Height upto
3.66 M
Steel scaffolding pipes, jack Props, wallers,
Foot plates, brackets, steel Centering
Plates, etc., complete
2 Filling with with sand in trenches, sides of cum 0.27 581.50 159.33
foundations and basement with initial lead
in layers not exceeding 15 cm thick,
consolidating each deposited layer by
watering and ramming including cost and
conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished
item of work.
4 11.5 cm wide Brick masonry for super- sqm 6.44 293.50 1,888.97
structure on ground floor in cm (1:3) using
second class traditional size bricks including
cost of all materials, seigniorage charges,
labour and all operations for constructing
half brick masonry, mixing cement mortar,
curing etc., complete for finished item of
work, but excluding conveyance charges of
materials.
Sl.
Description of Item Nos Qty Units
No Length Width Depth Remarks
1 Earth pit sixe : 0.5 x 0.5 x 0.5 m
Panal Room Backside 2 2.00
Near Himase Light 1 1.00
3.00 nos.
Sl.
Description of item nos Qty Units Remarks
No Length Width Depth
2 Stoneware pipes
Panal Room outer To Cable Chamber 1 5.00 5.00 rmt
3 RCC Hume Pipe - 150 mm Dia
Cabul Chamher to Himase Light 1 15.20 15.20
Water Line Entery ramp To Panet Room 1 9.40 9.40
Entery Ramp 1 12.50 12.50
Near Leachate Collection Sump 1 4.80 4.80
41.90 rmt
4 RCC Hume Pipe - 300 mm Dia
Silt Chamber To Leachate Sump 2 2.00 4.00 rmt
5 MS Pipe - 300 mm Dia
Leachate Sump to Out Flow Chamber 1 6.00 ### kg
6 sluice valve - 300 mm Dia 2 2.00 nos
Incommer -
Two (2) Modules with 250A, FP MCCB as -
incommers (1 for EB & 1 for DG incoming
supply).
Two (2) Digital Ammeter (0 - 250 Amps) for -
each incomer with selector switches &
circuit wiring as per IE rules and Drawing
Two (2) Digital Voltmeter (0 - 500V) for -
each incomer with selector switch &
necessary PT's, wiring complete as per IS
Standards.
Two (2) KWH meter / multifunction metes. -
Three (3) R - 1 no, Y- 1no, B - 1 no pilot -
lamps for each,On / Off/Trip indication
lamps etc , as per IE rules and as per local
state electricity board rules.
Outgoing -
One (1) 100A, 4P MCB's. -
Six (6) 63A, TPN MCB's. -
Four (6) 32A, TPN MCB's. -
Four (4) 20A, TPN MCB's. -
Four (4) 16A, TPN MCB's. -
L.T. Cables(Laying) -
Laying,Testing & Commissioning of 1100V -
Grade, PVC insulated, Aluminium/Copper
Armoured cable of following sizes in the
cable trench with necessary hume pipes at
road crossing area/on the walls as per site
requirement and as per IE Rules .
Point Wiring -
Provide all materials, accessories, labour -
etc. for wiring testing,commissioning of
lights, ceiling fans, exhaust fans, using 3
runs of 1.5 Sq.mm PVC insulated multi
strand copper conductor wires of 600V
grade drawing in PVC conduit pipe as per
site Engineers Instructions with all
acessories inside the ceiling/wall from
Switch board to respective points (light, fan
etc) including control switches 5/6A in
nearest switch board. (Contractor has to
provide necessary gang boxes with covers)
Earthing -
36 Constructing & formation of earth pits with No's 10 3,957.00 39,570.00
'B' class 40 mm dia G.I. pipe of 8 feet with
funnel and G.I. Plate(400x400x3mm)
earthing with alternative layer of salt and
charcoal Including civil work of excavation &
back filling, construction of chambers with
man hole cover as per IE Rules.
49 Supply, Laying & Fixing of 6'' dia GI pipe for No's 250 750.00 187,500.00
above mentioned cable erection by
clamping across the bridge from nearest
tapping point to site premises.
50 Suppy, Erection, Testing and Comissioning No's 4 14,720.00 58,880.00
of 3C x 95Sq.mm 11KV outdoor end
termination kit.
51 Supply & Erection of 6/3 M.S Boxpole, RS No's 1 28,155.00 28,155.00
joist.
52 11KV A.B Switch No's 2 8,280.00 16,560.00
53 LT Cable 1 core 120 Sq.mm Mtr 90 120.00 10,800.00
54 AAA conductor 55Sq.mm Mtr 50 40.00 2,000.00
55 PCSS Pole 9.1 mtr No's 1 5,467.00 5,467.00
56 11KV HG fuse set. No's 2 2,500.00 5,000.00
57 100A MCCB No's 1 5,000.00 5,000.00
58 LT Distribution box with 100A MCCB No's 1 7,500.00 7,500.00
59 11Kva Pin Insulators. No's 12 250.00 3,000.00
60 11Kva MS Channels No's 6 750.00 4,500.00
61 Supply & fixing of bottom channel support Ls 1 50,000.00 50,000.00
angles, back clamps. Nut bolts. Lugs &
Glands, PVC tape etc.
62 Labour Charges for 11KV line erection with Ls 1 50,000.00 50,000.00
all necessary accessories.
63 Sanctions from APCPDCL for permanent Ls 1 25,000.00 25,000.00
power supply to site.
64 Supply, Erection, Testing and comissioning Set 2 75,000.00 150,000.00
of photo Sensor arrangement including
wiring by using 4 & 2.5Sq.mm copper under
unloading area for truck movement at site
including all necessary works like civil and
mechanical as per sitre requirement.
68 Repairing the existing street light poles and No's 3 7,500.00 22,500.00
changing the pole box with control SPMCB's
and single arm with 250W HPSV fitting as
per requirement.
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size sqm 10.100 1,024.00 ###
Cement for CM (1:8) for base coat kg. 21.600 5.50 118.80
Cement for slurry kg. 33.000 5.50 181.50
Cement for Pointing with CM (1:3) kg. 6.000 5.50 33.00
Sand for CM (1:8) cum 0.120 1,353.99 162.48
Sand for pointing cum 0.020 1,353.99 27.08
Seigniorage charges of sand cum 0.140 -
B. LABOUR
Mason 1st class day 0.960 285.00 273.60
Mason 2 nd
class day 2.240 260.00 582.40
Mazdoor (unskiled) day 3.300 215.00 709.50
Add water charges 1% LS 0.010 ### 124.31
Unit = 1 cum
A. MATERIALS:
No of blocks required for one cum of nos 110.00 38.00 4,180.00 Local
Masonry
Cost of Cement Mortar (1:6) cum 0.10 2,801.89 280.19
B. LABOUR -
Mason 1st class day 0.42 285.00 119.70
Mason 2nd class day 0.92 260.00 239.20
Man Mazdoor day 0.70 215.00 150.50
Woman Mazdoor day 2.10 215.00 451.50
MA 0.40 960.90 384.36