Professional Documents
Culture Documents
El Reto de Implementar BIM en Proyectos de Infraestructura: Ramón González
El Reto de Implementar BIM en Proyectos de Infraestructura: Ramón González
El Reto de Implementar BIM en Proyectos de Infraestructura: Ramón González
proyectos de infraestructura
Ramón González
Digital Environments SN Europe Leader
Jornada BIM | Colegio de Caminos, Madrid – 7 Junio 2016
Doncaster Car Depot | Arup ©
BIM Maturity Measure Tool
• Todas las empresas aseguran tener una
experiencia BIM elevada
• Esto no ayuda a entender el avance del
“proyecto medio”
Underground Infrastructure
• Large Hadron Collider: 27 km
• Tunnels: 70 km
• Caverns: 80 no.
Arup Tunnels involvement
• Post-Higgs period of machine upgrade
• Upgrade of existing ageing infrastructure
• Development of new schemes
• Future Circular Collider
• International Linear Collider
CERN | Future Circular Collider (FCC)
How is this best practice?
Analytics
• Step change to tunnel development and planning
• Objective, repeatable, parametric Design
• Regional scale clash detection
Documentation
Construction
Construction
Administration
Development
Design
Pre-design
Procurement
Operation
crucial in the decision making process, to help decide which layout is most
feasible, but also as an excellent communication tool.
Thanks to ARUP’s excellent client relationship, they have proved the perfect
match with CERN, and have far exceeded the expectations given in the initial
Early project BIM integration brief !”
Failures in ground-related construction projects are
mainly due to shortcomings in the use of available – John Osborne, CERN Head of Civil Engineering Future Accelerator
data and knowledge as opposed to uncertainty due to Studies Section
unknown factors. - Cardenas et al (2013)
CERN | Future Circular Collider (FCC)
New Ways of Working?
Digital Engineering
• Arup and client upskilling
• Early adopter benefits
• Communication and collaboration (VDR)
Next steps
• Phase 2 futureproofing with increasing data
maturity and LOD
• Adoption onto new projects
Thanks to:
• Lluis Miralles Verge: CERN Head of Site
Management and Buildings Department
• Luigi Scibile: CERN Head of Site Engineering Group
• John Osborne: CERN Head of Future Accelerator
Studies Section
GD Wine Factory, China
Construction
preparation
• Microstation (dgn) • PowerCivil (dgn) • PowerCivil (dgn) • SewerCAD (dgn) • SUE (dgn)
• Microstation (dgn) • WaterCAD (dgn)
• SUE (dgn)
¿Cómo trabajamos?
ModelBuilder
Vía Excel
SUE SewerCad
Modelo geométrico Modelo Hidráulico
ModelBuilder
Vía Excel
Reducir el riesgo en todo = Reducir el coste
Reducir el incertidumbre