El Reto de Implementar BIM en Proyectos de Infraestructura: Ramón González

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 21

El reto de implementar BIM en

proyectos de infraestructura
Ramón González
Digital Environments SN Europe Leader
Jornada BIM | Colegio de Caminos, Madrid – 7 Junio 2016
Doncaster Car Depot | Arup ©
BIM Maturity Measure Tool
• Todas las empresas aseguran tener una
experiencia BIM elevada
• Esto no ayuda a entender el avance del
“proyecto medio”

• Queremos que todo proyecto sea un


caso de éxito….
• Necesitamos aumentar la madurez BIM del
“proyecto medio”
• Necesitamos controlar nuestro avance
BIM Maturity Measure Tool
¿Por qué medir la madurez BIM?

1. Entender el rendimiento de Arup en el proyecto


2. Comunicar que constituye BIM
3. Identificar el “BIM Wash”

Para los Directores / Coordinadores de Proyecto


• Mide tanto la gestión de la información como el modelado
• Permite establecer objetivos y monitorizarlos
• Utilizable tanto dentro como fuera de Arup
Standards: initiation stage
DISEÑO PRODUCCIÓN COORDINACION / EXPLOTACIÓN

Arup Issue Tracker

ANÁLISIS FABRICACIÓN COLABORACIÓN


CERN
What is it?
• European Centre for Particle Physics
• Higgs Boson Discovery 2012

Underground Infrastructure
• Large Hadron Collider: 27 km
• Tunnels: 70 km
• Caverns: 80 no.
Arup Tunnels involvement
• Post-Higgs period of machine upgrade
• Upgrade of existing ageing infrastructure
• Development of new schemes
• Future Circular Collider
• International Linear Collider
CERN | Future Circular Collider (FCC)
How is this best practice?

Combined BIM Strategy & BIM Development


Data
• Novel Use of Early Project Information
• CDE for engineering, planning, physics across project
collaborators

Analytics
• Step change to tunnel development and planning
• Objective, repeatable, parametric Design
• Regional scale clash detection

Tunnel Optimisation Tool (TOT)


• Bespoke Open Source Development
• Cloud based server for shared model
• User friendly GUI and user management
CERN | Future Circular Collider (FCC)
Value to Arup and The Client?

Ability to impact cost and


functional design

Cost of design changes

Traditional design process

“One of ARUP’s key values is understanding what the client requires at a


BIM design process
particular stage of a project. They quickly proposed this unique interactive
investigative tool called TOT, which has proved invaluable in understanding
what is possible and what is not. The tool developed has proved not only
Schematic
Design

Documentation
Construction

Construction
Administration
Development
Design
Pre-design

Procurement

Operation

crucial in the decision making process, to help decide which layout is most
feasible, but also as an excellent communication tool.

Thanks to ARUP’s excellent client relationship, they have proved the perfect
match with CERN, and have far exceeded the expectations given in the initial
Early project BIM integration brief !”
Failures in ground-related construction projects are
mainly due to shortcomings in the use of available – John Osborne, CERN Head of Civil Engineering Future Accelerator
data and knowledge as opposed to uncertainty due to Studies Section
unknown factors. - Cardenas et al (2013)
CERN | Future Circular Collider (FCC)
New Ways of Working?

Digital Engineering
• Arup and client upskilling
• Early adopter benefits
• Communication and collaboration (VDR)

Next steps
• Phase 2 futureproofing with increasing data
maturity and LOD
• Adoption onto new projects

International Linear Collider “A perfect example of industry and fundamental


• CERN + KEK (Japan) + Fermilab (USA) + research partnership that demonstrates the
DESY (Germany) many possible synergies between accelerator
• Working with Arup Japan R&D activities worldwide.”
• Digital as a means to share knowledge and
export skills - Michael Benedikt, CERN, Chair of FCC
Study Coordination Group
CERN | Future Circular Collider (FCC)
Why is this important?
International Linear Collider Workshop
Santander, Spain
May 30th - June 5th, 2016

Thanks to:
• Lluis Miralles Verge: CERN Head of Site
Management and Buildings Department
• Luigi Scibile: CERN Head of Site Engineering Group
• John Osborne: CERN Head of Future Accelerator
Studies Section
GD Wine Factory, China
Construction
preparation

Soil nail Cross-check


Terminal de graneles sólidos
¿Cómo lo hacemos?

Movimiento de Redes Cintas


Muelle Almacenes y Silos transportadoras y
tierras y dragado de agua tuberías

• Microstation (dgn) • PowerCivil (dgn) • PowerCivil (dgn) • SewerCAD (dgn) • SUE (dgn)
• Microstation (dgn) • WaterCAD (dgn)
• SUE (dgn)
¿Cómo trabajamos?

ModelBuilder
Vía Excel

SUE SewerCad
Modelo geométrico Modelo Hidráulico

ModelBuilder
Vía Excel
Reducir el riesgo en todo = Reducir el coste

Reducir el incertidumbre

You might also like