Test Results of Safety Devices " Aux. Boiler " Alarms and Shut Down Tests

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

VESSEL NAME:

DATE: 29.02.2020

TEST RESULTS OF SAFETY DEVICES " AUX. BOILER "


ALARMS AND SHUT DOWN TESTS
NO. DESCRIPTION FUNCTION DESIGN VALUE ACTUAL VALUE REMARKS
STEAM PRESSURE
1 AUTO START / STOP ( MASTER ) N.A 6/ 9 B 3.5/ 6.8 B SATISFACTORY
3 LOW STEAM ALARM ALM. 4.5 B 3B SATISFACTORY
4 HIGH STEAM TRIP TRIP 9.1 B 8.1 B SATISFACTORY
5 SAFETY VALVE SET N.A 10.8 B 9.2 B SATISFACTORY
SATISFACTORY
WATER SATISFACTORY
1 LOW LEVEL ALARM ALM. 115mmWG 115mmWG SATISFACTORY
2 L. LOW LEVEL TRIP TRIP 50mmWG 50mmWG SATISFACTORY
4 HIGH LEVEL ALARM ALM. 485mmWG 485mmWG SATISFACTORY
5 HIGH HIGH LVL. ALM. 540mmWG 540mmWG SATISFACTORY
6 OIL CONTENT HIGH ALM. 10ppm 10ppm SATISFACTORY
7 SALINITY HIGH ALM. 10ppm 10ppm SATISFACTORY

FUEL
1 AUTO STBY. Pp START ALM. 14.0 B 13.5 B SATISFACTORY
2 LOW OIL TEMP. INTERLOCK ALM. 100 C 80 C SATISFACTORY
3 HIGH OIL TEMP. INTERLOCK ALM. 150 C 145 C SATISFACTORY
4 IGNITION Pp. OVERLOAD TRIP N.A N.A SATISFACTORY
SATISFACTORY
COMBUSTION / OTHERS SATISFACTORY
1 ATOMIZING STM. LOW TRIP 3.5 B 3.5 B SATISFACTORY
2 F.D FAN OVERLOAD TRIP N.A N.A GOOD
3 OIL VALVE NOT IN POSITION TRIP N.A N.A GOOD
4 LANCE NOT INSERTED TRIP N.A N.A GOOD
5 FIRE IN WIND BOX TRIP N.A N.A GOOD
6 FLAME FAILURE TRIP N.A N.A GOOD
7 SEQUENCE FAILURE TRIP N.A N.A GOOD
8 EMERGENCY TRIP TRIP N.A N.A GOOD

ETO 3RD ENGINEER 2ND ENGINEER CHIEF ENGINEER


SHALAB DANDRIYAL RAJ SINGH

You might also like