Professional Documents
Culture Documents
Key Performance Indicators List
Key Performance Indicators List
Release
KPI Name Application Description Maximo 5.0 Report Name Date
wotrack_pmoverdue_priority_k
1 PM Workorders Overdue by Priority KPI PM Workorders Overdue by Priority KPI pi_graph Dec-01
wotrack_pmoverdue_priority_k
KPI PM Workorders Overdue by Priority Details pi_details Dec-01
wotrack_pmoverdue_supervisor
2 PM Workorders Overdue by Supervisor KPI PM Workorders Overdue by Supervisor _kpi_graph Dec-01
PM Workorders Overdue by Supervisor wotrack_pmoverdue_supervisor
KPI Details _kpi_details Dec-01
3 Material Failures KPI KPI Materials Failure KPI matlfail_kpi_tbl Dec-01
KPI Materials Failure KPI - Graph 2 matlfail_kpi_tbl_level2 Dec-01
KPI Material Failure Details KPI matl_fail_details_tbl Dec-01
Updated KPIs - with 3 Level Drilldown Format - For Release 5.1, Able to Populate Start Centers 80 and 99
1 KPI Indicator % Overdue PM WO Jun-02
PMOVERDUE_KPI_L1 KPI - Level 1 % Overdue PM WO - by Site Jun-02
PMOVERDUE_KPI_L2 KPI - Level 2 % Overdue PM WO - by Location Jun-02
KPI - Level 2 Details Jun-02
PMOVERDUE_KPI_L3 KPI - Level 3 % Overdue PM WO - by Equipment Jun-02
KPI - Level 3 Details Jun-02
2 KPI Indicator % Over Std EM Response Time Jun-02
EMRESPONSE_KPI_L1 KPI - Level 1 % Over Std EM Response Time - by Site Jun-02
A WO is considered overdue if its actual completion date is null, and the current date is greater than its targeted completion date.
The graphics are displayed as: Between 0 and 20%, Green. Between 20 and 60%, Yellow. Greater than 80%, Red.
An item is considered a failure if its actual life is less than the manufacturer's expected life.
The actual life of the item is calculated by multiplying its average meter unit by the number of days since its last replacement.
The Manufacturer's Expected Life must be in the same unit of measure as the Equipment's Meter Unit that the item is used in.
KPI Description
PM WO's Overdue by Location - Level 2
PM WO's Overdue by Location - Level 2 Details
Link to WO Details Report
KPI Description
% to Standard Emergency Maintenance Resonse by Location - Level 2
% to Standard Emergency Maintenance Resonse by Location - Level 2 Details
KPI Description
% WO's Overdue (all but PM) by Location - Level 2
% WO's Overdue (all but PM) by Location - Level 2 Details
Backlog Hours
KPI Description
% Reactive Work Order Types by Location - Level 2
% Reactive Work Order Types by Location - Level 2 Details
KPI Description
OEE by Location – Level 2
OEE by Location – Level 2 Details
Specific production information is available for each location.
Each location is listed on a separate page for ease of distribution/analysis
OEE by Location - Level 2 - History
OEE by Equipment – Level 3
OEE by Equipment – Level 3 Details