1. All beams to have 100 bearing into party wall & 150mm into
internal walls
2. Beams to be placed as shown.
3. Beam to be preloaded by shimming steel plate wedges & dry
packing between steel beams & existing strucure prior to
release props. (Deflection of 6-8mm to be achieved on all
beams wiht preloading).
4. Steel to steel welding to be 6mm fillet weld full profile
unless noted otherwise.
5. Provide min 15mm dry packing btwn steel beam and walls.
6. All setting out dimensions to site and to architect drawings
7. New foundations pits to be inspected & approved by D.S.
prior to pouring concrete.
8. All existing joists span to be confirmed once opening works