Engineer Comments :
Requested by Contractor
Approved by Consultant
FIELD INTER FACE CLEARANCE
INSPECTION BEFORE PLACING OF CONCRETE
SIGNATURE
Inspection Check(V)
Date Checked REMARKS
Item Approved by Applicable Rating
( ) GOOD
Rebar Work none none
( ) POOR
( ) GOOD
Form Work
( ) POOR
( ) GOOD
Clean Out
( ) POOR
( ) GOOD
( ) POOR
( ) GOOD
( ) POOR
( ) GOOD
( ) POOR
( ) GOOD
( ) POOR
( ) GOOD
( ) POOR
Remarks
Requested by Contractor
Approved by Consultant
FIELD TEST / INSPECTION REPORT
CONCRETE POURING PERMIT
SLUMP REQUIRED
TEMPERATURE REQ'D
8 COMMENTS
GRADE OF CONCRET18MPA
Remarks
Requested by Contractor
Approved by Consultant
GENERAL CHECK FORMAT
Remarks
Requested by Contractor
Approved by Consultant
SUB-PREPARATION FORMS
SUB-PREPARATION FORMS