JOB DESCRIPTION DURING LOCKDOWN

NAME JOB DESCRIPTION


Gourab Saha 1. Joint marking, Drawing marking,
2. Calcutating ID,IM of the drawing given by HOD
3. Data entery in to the system

Souvik Dey 1. Preparing JSA of electrical & instrumantion work.


2. Helping the machnical team for calculation to work the drawing also.
3. prepared the aticle for the magazine.
4. prepard the staff detels for HO requiments.
5. Responsibility of the mess.

Abhijit Jana 1. Preparing JSA of scaffolding erection & dismantling.


2. Helping the staff detels for HO requiments.
3. Helping in the mess marketing.

Subrata Bain 1. Helping in the mess work activity.

Susanta Shit 1. Joint marking, Drawing marking, submited by Gourob


2. Calcutating ID,IM of the drawing given by HOD submited by Gourob

Jayanta Aich 1. Observation of drawing (ELC).

Anup Barik 1. Next two months maqtirals alocated.

Jagadish Mallik 1. preparing Documents, QAP; ITP of Electrical format.


2.Planing schedule supply installaling .
3. Drawing preperation .
4. Obervation of tender & techenical spcufication.

Raejeev Kumar 1. preparation of balance QA doucmentslike method statements proceduse quality assurance manual.
2. Formulation for welder performance & MIS report.
3. Study of tender documents for balance document and requiremats for QA/QC.
4. Co-ordination with QC team for all balance lot preparation for NDE backlog clearance.

Subrata Dhar 1. Preparation of PPT for PRM.


2. Paid Vs. claim for composite X PHPL.
3. Fixed corst analysis for composite.
4. RA bill prepared for composite.
5. Job distibution to all staffs during lockdown.
6. Co-ordination with client & consultant for different users.
7. preparation of liabilition nite sheet.
8. Billing followup with TKIS & IOCL.
9. Analysis of scaffolding for composite work.
10. Corrosponant to client & sub-constrator.
11. Co-ordination with HR Admin during lockdown.
12. Panding work order regularise for PHPL project.
13. Co-ordination with all staffs for feuture planning.
14. Making of project found managemant.

Kaustav Samanta 1. LHS Update for RA BILL.


2. RT LOT for RA BILL.
3. RT LOT Update in LHS.
4. WELDER DETAILS ; WQT REGISTER
5. Method statement of Non Shrinkage Grouting material
6. Ongoing Method Statement of Bolt tightening and PMI.

Shailesh kumar 1. IM entry for billing


2. Iso index updation
3. Special support and secondary support MTO calculation
4. Document controll related to piping.
5. DHDT loop file preparation

Ravi Shankar Pal 1. Payment to sweeper.


2. Behera PF stahctery compliance document scanned and mail to mr. S.Dhar sir.
3. guest house cleaning.
4. Gadibrahma PF & stahctery complince maill to all.
5. Staff details contact calculated and submitted to S.dhar sir.
6. Employee code calculated and send to Dhar sir via sourov.
7. Cash bill hand-over to G.B sir via mail.
8. Craine bill(scan) and mail to S.Dhar sir.
9.Manoj vehicle log book checked.
March attenance send to G.B sir.

Supradip Majumdar 1. Updation of stock register from starting to as on date.


2. Collection & instruction regarding stock register details from Mr. Goutam Banerjee (udaybihar Gest house) by walking.
3. Tarinigara Gest house drinking water collection from paradip Gar & continually follow up with water supplier.
4. Mess manager roll playing during this lockdown period.

Anipto Parida 1. Equipment padding,erection,alignment,billing status updated and submitted to Subrat Dhar sir.
2. Made an erection schedule of balance equipment erection in HGU, ROG, KHDS, DHDT unit and submitted to Dipak Mitra sir.
3. Made a list of rented crane,jcb used for equipment erection and area develope at ROG and KHDS site.
4. Studied the drawings available with me.

1. planning for eraction, alingment and grouting of balance each and evey equipment (bs-vi) in
Dipak Mitra month wise.

2. preparing the equipment loading and Erection scheme which we have planned for the month of
April and May.
3. preparing the file (Supporting Document) equipment wise which required final (ITP) Handover for commissioning.

Deepk Kumar 1. Linewise pipe rack erection monthly plan


2. Pipe supports weight calculation.

Nanda Kisor 1. fitup-weldvisual enty in LHS.


2. Co-ordinate with contactors for fitup-weldvisual reports.
3. LHS correction,seprated double entry line no from LHS.
4. line no entry in LHS is continuing.
5. Work hamperd due to non avability of laptop.
Dipak Mitra sir.