Conductoare Neizolate Din Al: Po (KW) PSCC (KW)

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 5

Co

Sectiune R X [Ω/km] Distanta medie dintre conducto


mm2 Ω/km 50
16 1.802 0.36
25 1.181 0.34
35 0.833 0.33
50 0.595 0.32
70 0.437 0.31
95 0.303 0.23
120 0.246 0.29

Conductoare torsadate

Sectiune R X

mm2 Ω/km Ω/km


16 1.802 0.098
25 1.181 0.097
35 0.833 0.089
50 0.579 0.086
70 0.437 0.084

Conductoare trifazate din CU si Al tip NYY - J(0) 0.6/1 kV si NAYY - J(0) 0.6/1 kV, montate in p

NYY J(0) Cu NAYY J(0) Al


Sectiune
R [Ω/km]
25 0.722 1.144
35 0.524 0.876
50 0.387 0.641
70 0.268 0.443
95 0.193 0.32
120 0.153 0.253
150 0.124 0.206
185 0.099 0.164
240 0.075 0.125
300 0.061 -

Pierderi in gol si scurt circuit la transformatoare

Sn [kVA] ∆Po [kW] ∆Pscc [kW]


40 0.18 0.98
63 0.3 1.5
100 0.35 2.3
160 0.525 3
250 0.65 3.25
400 0.93 4.6
630 1.3 6.5
1000 1.7 10.5
1600 3 30
2500 4.7 30
Conductoare neizolate din Al
nta medie dintre conductoare d [cm]
60 70 80
0.37 0.38 0.39
0.35 0.37 0.37
0.34 0.35 0.36
0.33 0.34 0.35
0.32 0.33 0.34
0.31 0.32 0.33
0.3 0.31 0.32

YY - J(0) 0.6/1 kV, montate in pamant

NYY Cu + NAYY Al
X [Ω/km]
0.086
0.083
0.083
0.082
0.08
0.08
0.08
0.08
0.079
0.079

ANEXA 8 NTE 013/16/00


90 100
0.4 0.4
0.38 0.39
0.37 0.38
0.36 0.37
0.35 0.36
0.34 0.34
0.33 0.34
Calculul caderilor de tensiune PTA 381 in localitatea Dunarea, judetul Constanta-Varianta 2

tg cos fi 0.43 nr ab 130 P[kW] 107.20 S[kVA] 250.00


cosϕ 0.92 p ab [kW] 0.8 Q[kVAr] 45.67 Δ P0[kW] 0.65
U [kV] 0.4 Energia totala [kWh] 201088 ΔPScc[kW] 3.25
k CPT 0.230756734404537 cost 1 kwh [lei/kWh] 0.6
T sm [h] 3500
τ [h/an] 1933.54028973897
28.8/49.2
Situatia existenta
Nr. circ. Tronsonul Tip cablu s [mmp] r [Ω/km] nr. ab. P abonat P tranzitat Pa (kW) Lungime (km) ΔU(V) ΔU [%] CPT [kWh/an]
PTA-C TYIR 3x70+54.6 mm² 70 0.437 0 0.00 43.20 43.2 0.02 0.944 0.236 237.91 L circuit
C1

C-C1 AL 4x35 mm² 35 0.833 54 43.20 0.00 21.6 1.14 51.408 13.088 6797.34 1.16
PTA-B TYIR 3x70+54.6 mm² 70 0.437 0 0.00 64.00 64 0.02 1.598 0.400 596.75 L circuit
B-B1 AL 4x35 mm² 35 0.833 1 0.80 63.20 63.6 0.14 18.164 4.941 7071.75 2.77
B1-B2 AL 4x35 mm² 35 0.833 26 20.80 0.00 10.4 0.91 19.802 9.891 1260.63
B1-B3 AL 4x35 mm² 35 0.833 4 3.20 39.20 40.8 0.14 11.652 7.854 2910.27
C2

B3-B4 AL 5x35 mm² 35 0.833 28 22.40 0.00 11.2 0.87 20.259 12.918 1388.93
B3-B5 AL 4x35 mm² 35 0.833 3 2.40 14.40 15.6 0.05 1.485 8.225 141.82
B5-B6 AL 3x50 mm² 50 0.595 6 4.80 0.00 2.4 0.27 0.979 8.470 14.10
B5-B7 AL 3x35 mm² 35 0.833 12 9.60 0.00 4.8 0.37 3.656 9.139 107.41

CPT LEA [kWh/an] 20526.91


CPT trafo [kWh/an] 4,746.07
CPT total [kWh/an] 25272.99
CPT % 12.57
Cheltuieli din CPT [lei] 15,163.79

tg cos fi 0.43 nr ab 197 P[kW] 111.20 S[kVA] 250.00


cosϕ 0.92 p ab [kW] 1 Q[kVAr] 47.37 Δ P0[kW] 0.65
U [kV] 0.4 Energia totala [kWh] 689500 ΔPScc[kW] 3.25
k CPT 0.230756734404537 cost 1 kwh [lei/kWh] 0.6
T sm [h] 3500
τ [h/an] 1933.54028973897

Situatia proiectata
Nr. circ. Tronsonul Tip cablu s [mmp] r [Ω/km] nr. ab. P abonat P tranzitat Pa (kW) Lungime (km) ΔU(V) ΔU [%] CPT [kWh/an]
PTA-A TYIR 3x70+54.6 mm² 70 0.437 0 0.00 50.40 50.4 0.02 0.964 0.241 283.34
A-A10``` TYIR 3x70+54.6 mm² 70 0.437 23 18.40 32.00 41.2 0.42 18.905 4.967 4544.16 nr.ab. L max
C1
A10```-A10 TYIR 3x70+54.6 mm² 70 0.437 10 8.00 0.00 4 0.25 1.071 5.235 24.99 63 0.72
A10```-C1 TYIR 3x70+54.6 mm² 70 0.437 30 24.00 0.00 12 0.46 5.965 6.458 417.62
PTA-A TYIR 3x70+54.6 mm² 70 0.437 0 0.00 46.40 46.4 0.02 0.887 0.222 240.15
A-A13 TYIR 3x70+54.6 mm² 70 0.437 0 0.00 46.40 46.4 0.04 1.774 0.665 480.30
A13-A11 TYIR 3x70+54.6 mm² 70 0.437 4 3.20 43.20 44.8 0.21 10.278 3.235 2686.49
A11-A12 TYIR 3x70+54.6 mm² 70 0.437 4 3.20 0.00 1.6 0.18 0.306 3.311 2.86 nr.ab. L max
C2 A11-A10`` TYIR 3x70+54.6 mm² 70 0.437 22 17.60 22.40 31.2 0.53 17.895 7.709 3257.45 58 0.86
A10``-A10` TYIR 3x70+54.6 mm² 70 0.437 3 2.40 0.00 1.2 0.11 0.138 7.743 0.96
A10``-A14 TYIR 3x70+54.6 mm² 70 0.437 8 6.40 13.60 16.8 0.14 2.570 8.351 251.86
A14-A15 TYIR 3x70+54.6 mm² 70 0.437 4 3.20 0.00 1.6 0.42 0.734 8.535 6.85
A14-A16 TYIR 3x70+54.6 mm² 70 0.437 13 10.40 0.00 5.2 0.39 2.187 8.898 66.36
PTA-B TYIR 3x70+54.6 mm² 70 0.437 0 0.00 60.80 60.8 0.02 1.162 0.291 412.34
B-B1 TYIR 3x70+54.6 mm² 70 0.437 1 0.80 60.00 60.4 0.11 6.929 2.023 2441.59
B1-B2 TYIR 3x70+54.6 mm² 70 0.437 26 20.80 0.00 10.4 0.70 7.953 4.011 482.59
B1-B3 TYIR 3x70+54.6 mm² 70 0.437 4 3.20 36.00 37.6 0.11 4.313 3.101 946.18 nr.ab. L max
C3
B3-B4 TYIR 3x70+54.6 mm² 70 0.437 28 22.40 0.00 11.2 0.67 8.137 5.135 531.70 76 0.89
B3-B5 TYIR 3x70+54.6 mm² 70 0.437 3 2.40 11.20 12.4 0.04 0.474 3.220 34.30
B5-B6 TYIR 3x70+54.6 mm² 70 0.437 6 4.80 0.00 2.4 0.21 0.551 3.357 7.71
B5-B7 TYIR 3x70+54.6 mm² 70 0.437 8 6.40 0.00 3.2 0.28 0.979 3.464 18.28
5.27
TOTAL ABONATI 197
CPT LEA [kWh/an] 17138.07
CPT trafo [kWh/an] 4,933.92
CPT total [kWh/an] 22,071.99
CPT % 3.20
Cheltuieli din CPT [lei] 13243.19

You might also like