CHECKLIST FOR BACKFILLING

Project : KMI Project - Assembly Shop


Location / Structure : Date :

Ref Drawing Number :

Sl. No Description Points Yes No Remarks

1 Check for Area Barricated.

2 Check for Clearence of structural defects.

3 Check for MEP clearence before backfilling.

4 Check for markings of layers from Top of PCC.

5 Check for required water content to be added.

6 Check for correct load of compactor.

7 Check for compaction of 95%.

8 Availability of test report for compacting next layer.

Site
L&W Engineer HEC
Engineer