NAME:SANTOSH RATOD

DESIGNATION:Asst. ENGINEER

DEPARTMENT:MECHANICAL

COMPANY:KANODIA INFRATECH LIMITED

KPI REPORT:

BELT CONVEYOR

1. BELT CONVEYOR JOINT WORK.


2. BELT CONVEYOR TAIL PULLEY,HEAD PULLEY,BEND PULLEY,TAKE UP PULLEY
AND SNUB PULLEY LAGGING WORK.
3. WEIGH FEEDER BELT REPLACEMENT WORK.
4. BELT CONVEYOR IDDLER CHANGING WORK.
5. CONVEYOR BELT REPLACEMENT WORK.
6. BELT CONVEYOR TNT TAIL DRUM BEARING CHANGING WORK.
7. BELT CONVEYOR TAIL PULLEY REPLACEMENT WORK.
8. BELT CONVEYOR TAIL PULLEY ,SNUB PULLEY,BEND PULLEY AND TAKE UP
PULLEY BEARING CHANGING WORK.
9. BELT CONVEYOR HEAD PULLEY DRIVE AND NON DRIVE END BEARING
CHANGING WORK.
10.BELT CONVEYOR ALL PULLEY CHANGING WORK.
11.BELT CONVEYOR GEAR BOX CHANGING WORK.
12.BELT CONVEYOR MOTOR REPLACEMENT WORK.

RC FAN

13.RC FAN DRIVE END BEARING CHANGING WORK .


14.RC FAN NON-DRIVE END BEARING CHANGING WORK.
15.RC FAN IMPELLER BALANCING WORK.
16.RC FAN GEAR BOX REPLACEMENT WORK.
ROLLER PRESS

17.ROLLER PRESS ROLLER PROFILING WORK.


18.ROLLER PRESS HYDRAULIC CYLINDER REPLACEMENT WORK.
19.ROLLER PRESS ROLLER’S BEARING REPLACEMENT WORK.
20.ROLLER PRESS GEAR BOX CHANGING WORK.
21.ROLLER PRESS CARDON SHAFT BEARING REPLACEMENT WORK.
22.ROLLER PRESS SAFE SET COUPLING CHANGING WORK.
23.ROLLER PRESS BOTH FIXED AND MOVABLE ROLLER CHANGING WORK.
24.ROLLER PRESS HYDRAULIC GATE MAITENANCE WORK.
25.ROLLER PRESS MOTORISE GATE MAINTENANCE WORK.
26.ROLLER PRESS ACCUMULATOR CHANGING WORK.
27.ROLLER PRESS ROLLER’S HARD FACING WOK.
28.ROLLER PRESS HYDRAULIC TANK CLEANING WORK.
29.ACCUMULATOR BLADDER CHANGING WORK.

BALL MILL

30.BALL MILL TRUNION BEARING INSPECTION WORK.


31.BALL MILL GIRTH GEAR INSPECTION WORK.
32.BALL MILL TORSION SHAFT BEARING INSPECTION WORK.
33.BALL MILL GEAR BOX INSPECTION WORK.
34.BALL MILL OUTER SHELL LINNER BOLT TIGHTEN WORK.
35.BALL MILL LINNER INSPECTION WORK.
36.BALL MILL MEDIA CHARGE INSPECTION WORK.
37.BALL MILL LUBRICATION CIRCUIT INSPECTION WORK .
38.BALL MILL GIRTH GEAR SPRAY NOZZLE INSPECTION WORK.

BUCKET ELEVATOR

39.BUCKET ELEVATOR BOTTOM BEARING CHANGING WORK.


40.BUCKET ELEVATOR FRICTION PLATE CHANGING WORK.
41.BUCKET ELEVATOR COUPLING AND GEAR BOX INSPECTION WORK.
42.BUCKET REPLACEMENT WORK.
43.ELEVATOR DRIVE AND NON DRIVE END BEARING INSPECTION AND
CHANGING WORK.

SEPERATOR

44.DYNAMIC SEPERATOR FIXED AND MOVABLE VANES INSPECTION WORK.


45.SEPERATOR GEAR BOX INSPECTION WORK.
46.SEPERATOR LUBRICATION CIRCUIT INSPECTION.
47.SEPERATOR TOP AND BOTTOM BEARING INSPECTION.

BAG FILTER’S

48.BAG FILTER BAG CHANGING WORK.

49.BAG FILTER PURGING LINE CHECKING WORK.

50.BAG FILTER FAN BEARING INSPECTION AND REPLACEMENT WORK.

51.BAG FILTER FAN COUPLING INSPECTION.

52.ROTARY AIR LOCK BEARING INSPECTION WORK.

PACKING PLANT

53.PACKER BOTTOM BEARING INSPECTION.

54.PACKER NOZZLE CHANING WORK.

55.PACKER AIRATION LINE CHECKING WORK.

56.PACKER DISCHARGE,BAG HOLDING AND THREE POSITION CYLINDER


CHANGING WORK.

57.FILLING IMPELLER INSPECTION WORK.

58.V-BELT CHANGING WORK OF FILLING IMPELLER AND BLOWER.