Steps:
a. Delivery: $30 per truckload on top of the soil cost. Each truckload can deliver up
to 18 cubic yards. Total cost for delivery is $210 (added on to soil cost).
b. Pick up: Gas? 17 miles= a gallon. How much is a gallon? $3.79. To pick up soil is
9 miles. Costs $4 to go there and back. How many times? Truck can hold 2.366
yards of dirt. Total cost for pick up= $190.194 (added on to soil cost).