Professional Documents
Culture Documents
RSIA Bina Medika Bintaro - MAM-A151958-FIN-00
RSIA Bina Medika Bintaro - MAM-A151958-FIN-00
RSIA Bina Medika Bintaro - MAM-A151958-FIN-00
Bintaro
A 23/SEP/2019 DC-110142: Final study based on DC-106920 Indonesia
REV DATE MODIFICATIONS
01 - Cover Sheet Jumarsono Sunarno
02 - Equipment Layout
03 - Floor and Electrical Layout GE Healthcare 628111941195
04 - Structural Details Jumarsono.sunarno@ge.com
05 - Power and Network Requirements
06 - Detailed Schematics of PDB
07 - HVAC - Environment - Equipment
dimensions
SENOGRAPHE CRYSTAL NOVA
08 - Interconnection - Delivery FINAL STUDY
09 - Disclaimer - Site Readiness
Drawn by Verified by Concession S.O. (GON) PIM Manual Rev
A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in
incomplete documentation required for site design and preparation.
Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning YoonSun Lee SoYun Kim - 4808869 6673206-8EN 1
GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete Format Scale File Name Date Sheet
set of final issue drawing. GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings, however caused. All
dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work
due to scaling from these drawings. A3 1:30 MAM-A151958-FIN-00.DWG 23/SEP/2019 01/09
EQUIPMENT LAYOUT
DIMENSIONS WEIGHT
ITEM DESCRIPTION LxWxH (mm) (kg)
3400
EXAM ROOM HEIGHT
FINISHED FLOOR TO SLAB HEIGHT -
FALSE CEILING HEIGHT rec. 2.4m
1001
1400
45°
2
3900
45
14
1
3
4
300
1910(ISO) 400
2310
3400
RS Bina Medika Bintaro SENOGRAPHE CRYSTAL NOVA MAM-A151958-FIN-00.DWG 1:30 Rev A Date 23/SEP/2019 Equipment Layout 02/09
FLOOR AND ELECTRICAL LAYOUT
ITEM QTY DESCRIPTION
Basic system
3 Electrical outlet 10/16A 230V + G
1 RJ 45 network socket
1168
System remote control (Y), locked when power OFF "ON" and "OFF" impulse buttons
886 1
with indicator lamps red=ON / green=OFF located at 1.50m above floor
1 System emergency off (SEO), (recommended height 1.50m-1.85m above floor)
1 System ON light (L) - 24V
1 X-Ray ON lamp (L1) - 24V
Floor duct
1287
1570
Scan Room
600
2
3900
2350
4
1
550
3
750
600
450
427
1800
2080
RS Bina Medika Bintaro SENOGRAPHE CRYSTAL NOVA MAM-A151958-FIN-00.DWG 1:30 Rev A Date 23/SEP/2019 Floor and Electrical Layout 03/09
ANCHORING TO THE FLOOR CABLE MANAGEMENT
Min 300
[12 in]
720
25
85
140
400
6xØ12 [Ø0.47 in] Ø35 [Ø1.38 in]
holes in the floor Baseplate
cable inlet Removable coverplate Removable coverplate
6xØ14 [Ø0.55 in]
145
holes in the plate
330
475
675
Gantry axis
Baseplate Ø60 [Ø2.36 in]
cable inlet 2xØ12 [Ø0.47 in]
holes in the floor
470 Control station 2xØ14 [Ø0.55 in]
axis holes in the plate
· Anchors are not supplied by GE
· Inserts to be used: Hilti HSL-3 M8/20
· Minimum hole depth in the floor: 80 mm [3.15 in]
· Minimum floor thickness: 100 mm [3.94 in]
· Tightening torque: 25 Nm
· The floor must be stable and flat, and sufficiently strong to accept masses as defined below without distortion
beyond the tolerance given:
·· The worst case mass of the complete Gantry / Control station is 308.6 kg [680.3 lb]±10% / 97.2 kg [214.3 lb]±10%
·· The bearing surface of the Gantry / Control Station base plate is 0.35 m² [3.78 ft²] / 0.22 m² [2.37 ft²]
Face Shield
[94 in]
2400
[26 in]
[84 in]
[84 in]
650
2146
2146
[53 in]
1334
Bucky
[27 in]
684
928 1104
[37 in] [43 in]
RS Bina Medika Bintaro SENOGRAPHE CRYSTAL NOVA MAM-A151958-FIN-00.DWG 1:30 Rev A Date 23/SEP/2019 Structural Details 04/09
POWER AND NETWORK REQUIREMENTS POWER DISTRIBUTION
H07RN-F
GROUND SYSTEM
3x1.5
· Equipotential : the equipotential link will be by means of an equipotential bar. SEO Emergency OFF button, located 1.50m above floor (2)
This equipotential bar should be connected to the protective earth conductors in the ducts of the non GE Y System remote control. "ON" and "OFF" impulse buttons
cableways and to additional equipotential connections linking up all the conducting units in the rooms where with indicator lamps (OFF = red, ON = green), placed 1.50m
GE units are located. above floor (1)
L System ON light G
CABLES L1 X-Ray ON light (turned on for at least 5 seconds during
· Power and cable installation must comply with the distribution diagram below. X-Ray emission)
· All cables must be isolated and flexible. B Junction box
· Cable color codes must comply with standards for electrical installation. Wall duct guided cables are housed in a junction box
· Case PDB furnished by GE : the cables for signals and remote control (Y, SEO, L...) will go to PDB with a pigtail G Generator cabinet
length of 1.5m, and will be connected during installation. Each conductor will be identified and isolated (screw
connector).
· The ligne supply cable from the generator must be internally and permanently connected to the hospital Notes :
power distribution box and cannot be externally connected to the Power Distribution Box via a plug. The (1) Two dry contacts: "System ON" and "X-Ray ON", both
internal and permanent connection must be made in a way such the line supply cable can only be released by the generator cabinet.
disconnected by use of a tool. Max. voltage = 30 V
Cable SUPPLIED BY
(2) 2 x AWG12 (3.3 mm² / Ph + N) + 1 x AWG10 (5.3mm² / CUSTOMER
CABLEWAYS Earth) cable with 9.5 m usable length, supplied with the
The general rules for laying cableways should meet the conditions laid down in current standards and regulations, system Cable SUPPLIED BY GE
with regard to :
· Protecting cables against water (cableways should be waterproof) Equipment SUPPLIED BY
· Protecting cables against abnormal temperatures (proximity to heating pipes or ducts) CUSTOMER
· Protecting cables against temperature shocks
· Replacing cables (cableways should be large enough for cables to be replaced). Metal cableways should be Equipment SUPPLIED BY GE
grounded.
RS Bina Medika Bintaro SENOGRAPHE CRYSTAL NOVA MAM-A151958-FIN-00.DWG Rev A Date 23/SEP/2019 Power and Network Requirements 05/09
DETAILED SCHEMATICS OF POWER DISTRIBUTION BOX
PE L N
GENE
Y X-RAY ON
R1 R2 R2
OFF
CONTROL
IG
TDR2 0.5 sec
INTERRUPTER R1
2x50A
ON
24VAC
B1 0 230 B3
2x3A 230V TR1 6A+N
MBD1 Type D Type C
2x32A 250VA R1 C1 R2 TDR1 TDR2
Type D 24V 230/24V
30mA
0 24
C1
2x32A
EARTH BAR
B2 B4
3G6
10A+N 6A+N R1 R1 R1 TDR1 5 sec R2
N
yO
Type C Type C
Ra
X-
Y
SIGNALLING ON OFF
JUNCTION BOX H1 L L1
Green Red RED WHITE
White 24VAC 24VAC
24VAC 24VAC 24VAC
RS Bina Medika Bintaro SENOGRAPHE CRYSTAL NOVA MAM-A151958-FIN-00.DWG 1:30 Rev A Date 23/SEP/2019 Detailed Schematics of PDB 06/09
TEMPERATURE AND HUMIDITY SPECIFICATIONS ENVIRONMENTAL SPECIFICATIONS
NOTE
In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to
take measures to protect the equipment from dropping water.
GANTRY Broadband Connections are necessary during the installation process and going forward to ensure full support
from the Engineering Teams for the customers system. Maximum performance and availability for the customers
system is maintained and closely monitored during the lifetime of the system. Proactive and reactive maintenance
is available utilising the wide range of digital tools using the connectivity solutions listed below:
[26 in]
[84 in]
[84 in]
2146
2146
650
928 1104
[37 in] [43 in] The requirements for these connectivity solutions are explained in the broadband solutions catalogue (separate
FRONT VIEW SIDE VIEW document).
[61 in]
FRONT VIEW
690
RS Bina Medika Bintaro SENOGRAPHE CRYSTAL NOVA MAM-A151958-FIN-00.DWG 1:30 Rev A Date 23/SEP/2019 HVAC - Environment - Dimensions 07/09
INTERCONNECTION
9.50 m 3.50 m
[31.17 ft] [11.48 ft]
6.50 m
[21.33 ft]
NOT TO SCALE
DELIVERY
THE CUSTOMER MUST :
· Provide an area, adjacent to the GE suite, for delivery and unloading of the GE equipment.
· Ensure that the dimensions of all doors, corridors, ceiling heights, are sufficient to accommodate the movement
of GE equipment from the delivery area to the specific rooms of the GE site.
· Ensure that the access route will accommodate the weights of the equipment and any transportation, lifting
and rigging equipment,
· If the parking and dock facilities are on property which does not belong to the customer, ensure that all
necessary steps have been taken to ensure their temporary use by GE.
DIMENSIONS
CRATE 1 CRATE 2
DEPTH (mm [in]) 2280 [89.76] 698.5 [27.50]
WIDTH (mm [in]) 1400 [55.12] 622.3 [24.50]
HEIGHT (mm [in]) 1550 [61.02] 428.6 [16.87]
WEIGHT (kg [lb]) 765 [1686.5] ± 10% 19.575 [43.2] ± 10%
RS Bina Medika Bintaro SENOGRAPHE CRYSTAL NOVA MAM-A151958-FIN-00.DWG Rev A Date 23/SEP/2019 Interconnections - Delivery 08/09
DISCLAIMER GLOBAL SITE READINESS CHECKLIST (DI)
DOC1809666 Rev. 6
GENERAL SPECIFICATIONS Customer Name: PMI Name:
GON/SO Number: Field Service Name:
· GE is not responsible for the installation of developers and associated equipment, lighting, cassette trays and Equipment: Country/City or City/State:
protective screens or derivatives not mentioned in the order.
Site Visit Date for SRC: SRC Status:
· The final study contains recommendations for the location of GE equipment and associated devices, electrical
wiring and room arrangements. When preparing the study, every effort has been made to consider every
aspect of the actual equipment expected to be installed. Site Ready Checks at Installation
· The layout of the equipment offered by GE, the dimensions given for the premises, the details provided for General Site Planning
the pre-installation work and electrical power supply are given according to the information noted during Room dimensions, including ceiling height, for all Exam, Equipment/Technical & Control rooms meets GE specifications.
on-site study and the wishes expressed by the customer. Ceiling support structure, if on the GE drawing, is at correct location and height according to the drawing specifications. Levelness and
· The room dimensions used to create the equipment layout may originate from a previous layout and may not spacing has been measured. Overhead support Structure has been confirmed with contractor to meet GE criteria.
be accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to
lack of information. Rooms that will contain equipment, including staging areas if applicable, are construction debris free. Precautions must be taken to prevent
debris from entering rooms containing equipment.
· Dimensions apply to finished surfaces of the room.
· Actual configuration may differ from options presented in some typical views or tables. Finished ceiling is installed. If applicable ceiling tiles installed per PMI discretion.
· If this set of final drawings has been approved by the customer, any subsequent modification of the site must Delivery route from truck to installation space has been reviewed, all communications have occurred, arrangements made for special
be subject to further investigation by GE about the feasibility of installing the equipment. Any reservations handling (if needed). Floors along delivery route will support weight of the equipment, reinforcements arranged if needed.
must be noted.
System power & grounding (PDB/MDP) is available as per GE specifications, installed at point of final connection and ready to use. Lock Out
· The equipment layout indicates the placement and interconnection of the indicated equipment components. Tag Out is available.
There may be local requirements that could impact the placement of these components. It remains the
customer's responsibility to ensure that the site and final equipment placement complies with all applicable System power and grounded audit has been scheduled to be completed during installation of equipment. (If Required) GEHC PM to
confirmed if needed.
local requirements.
· All work required to install GE equipment must be carried out in compliance with the building regulations and Adequate room illumination installed and working.
the safety standards of legal force in the country concerned. Cableways (floor, wall, ceiling, etc.) ready for GE cables and are of correct length and diameter. Cableways routed per GE Final drawings and
· These drawings are not to be used for actual construction purposes. The company cannot take responsibility access openings installed as determined by GEHC PM. Surface floor duct installed at time of system installation.
for any damage resulting therefrom. HVAC systems Installed, and the site meets minimum environmental operational system requirements.
Network outlets installed and computer network available and working.
CUSTOMER RESPONSIBILITIES
Hospital IT/connectivity contacts have been engaged and information has been added to Project management tool. (If Required)
· It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the Floor levelness/flatness is measured and within tolerance, and there are no visible defects per GEHC specifications. Floor Strength and
final study. A detailed site readiness checklist is provided by GE. It is the responsibility of the customer to thickness have been discussed with customer/contractor and they have confirmed GE requirements are met.
ensure all requirements are fulfilled and that the site conforms to all specifications defined in the checklist and Customer supplied countertops where GE equipment will be installed are in place.
final study. The GE Project Manager of Installation (PMI) will work in cooperation with the customer to follow Specific for CT & X-ray
up and ensure that actions in the checklist are complete, and if necessary, will aid in the rescheduling of the
Doors and windows complete or scheduled to be installed. If applicable, radiation protection (shielding) finished & radioprotection
delivery and installation date. regulatory approval for installation obtained.
· Prior to installation, a structrual engineer of record must ensure that the floor and ceiling is designed in such a
PMI Signature:
way that the loads of the installed system can be securely borne and transferred. The layout of additional
structural elements, dimensioning and the selection of appropriate installation methods are the sole Customer Signature:
responsibility of the structural engineer. Execution of load bearing structures supporting equipment on the FS Signatature: optional
ceiling, floor or walls are the customer's responsibility.
RADIO-PROTECTION
· Suitable radiological protection must be determined by a qualified radiological physicist in conformation with
local regulations. GE does not take responsibility for the specification or provision of radio-protection.
THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.
RS Bina Medika Bintaro SENOGRAPHE CRYSTAL NOVA MAM-A151958-FIN-00.DWG Rev A Date 23/SEP/2019 Disclaimer - Site Readiness 09/09