Cost of Road Per KM:: S.No Description Unit Qty Rate
Cost of Road Per KM:: S.No Description Unit Qty Rate
Cost of Road Per KM:: S.No Description Unit Qty Rate
11,235,390.63 112.4
13,645,640.63 136.5
11,744,953.13 117.4
LHS
Excavation 500mm 7.5 m
Subgrade 500mm 7.5 m
572250.00 GSB 230mm 7.5 m
81750.00 WMM 250mm 7.5 m
DBM 50mm 7.5 m
4042500.00 SDBC 25mm 7.5 m
534187.50 MEDIAN
2618550.00 Median YES 3m
3858750.00 Kerb BOTH 2 Nos
866250.00 RHS
7072500.00 Excavation 500mm 7.5 m
261375.00 Subgrade 500mm 7.5 m
3670781.25 GSB 230mm 7.5 m
960000.00 WMM 250mm 7.5 m
292500.00 DBM 50mm 7.5 m
SDBC 25mm 7.5 m
24,831,393.75 248.314 L
LHS
Excavation 500mm 11 m
Subgrade 500mm 11 m
882900.00 GSB 230mm 11 m
81750.00 WMM 250mm 11 m
DBM 50mm 11 m
6237000.00 SDBC 40mm 11 m
548625.00 MEDIAN
3840540.00 Median YES 6m
5659500.00 Kerb BOTH 2 Nos
1270500.00 RHS
10373000.00 Excavation 500mm 11 m
383350.00 Subgrade 500mm 11 m
8614100.00 GSB 230mm 11 m
960000.00 WMM 250mm 11 m
585000.00 DBM 50mm 11 m
SDBC 40mm 11 m
39,436,265.00 394.363 L
LHS Service Road
Excavation 500mm 11 m 0
Subgrade 500mm 11 m 0
882900.00 GSB 230mm 11 m 0
81750.00 WMM 250mm 11 m 0
DBM 50mm 11 m 0
6237000.00 SDBC 25mm 11 m 0
534187.50
3840540.00 MEDIAN (CENTRAL)
5659500.00 Median YES 6m
1270500.00 Kerb BOTH 2 Nos
10373000.00
383350.00 RHS Service Road
5383812.50 Excavation 500mm 11 m 7.5
960000.00 Subgrade 500mm 11 m 7.5
693000.00 GSB 230mm 11 m 7.5
WMM 250mm 11 m 7.5
408750.00 DBM 50mm 11 m 7.5
2887500.00 SDBC 25mm 11 m 7.5
267093.75
1309275.00 MEDIAN (LHS)
1929375.00 Median YES 3m
433125.00 Kerb C.W & S.R 2 Nos
3536250.00
130687.50 MEDIAN (RHS)
1835390.63 Median YES 3m
1920000.00 Kerb C.W & S.R 2 Nos
693000.00
Note: C.W - Carrage way Side & S.R - Service Road Side
51,649,986.88 516.500 L
1000 0
500 7.5
300 11
12.5
250 15
230
200
150
130
100 SEZ
50 DTZ
40
25
1000
500
300
250
230
200
150
100
50
25
1000
500
300
250
230
200
150
100
50
25
1000 LHS 1
RHS 1
500 BOTH 2
300
250
230
200
150
100
50
25
1000
500
300
250
230
200
150
100
50
40
25
Service Road
m
m
m
m
m 1000
m 500
300
250
230
200
Service Road 150
m 100
m 50
m 25
m
m
m
DTZ SEZ
Excavation 54.5 52
Subgrade 385 310
Granular Sub-base 690 540
Wet Mix Macadam 980 870
Prime Coat 55 43
Dense Bitumen Macadam 9200 7900
Tack Coat 17 14
Semi Densed Bituminous Concrete 9550 8600
Kerb 480 430
YES 3
NO 0
YES 6
NO 0
C WAY 1
S.ROAD 1
C.W & S.R 2
Cost of Road per KM:
Commen notes:
a) Bitumen qty in DBM & SDBC as per mix design and SS Emulsion for prime coat at the rate of 6 to 9
kg per 10 sqm and RS Emulsion for tack coat 2.5 to 3 kg per 10sqm shall be applied
b) Excavation and Subgrade thickness will be as per actual EGL and CBR value of existing ground. For
costing purpose both are considered as 500mm
c) Storm drain excavation will be executed along with the road work so the cost included in the road,
shall be deducted in storm drain cost
d) Cost of utility crossings and culverts shall be in respective item costing
Between ROW
Each side
Between ROW
Each side
Between ROW
Each side
Between ROW
on Each side (7.5mx2=15.0m)
Each side
Between ROW
On Each side (11mx2=22.0m)
Each side
Between ROW
on Each side (11mx2=22.0m)
on Each side (7.5mx2=15.0m)
Each side