PPCR OPRC Kalomo Dundumwezi Ngoma Itezhi Tezhi Namwala Site Interim

Interim Measurments
Description: Backfilling

Chainage Average Average


Road No Length Volume (m3)
Start End Width Depth

2.44 5.3 0.95 12.29


L4 2+700 4.3

0.95

6.3

0.95

2.44

2.6 5.65 0.75 11.02


4.9
2+775
0.95

6.4

0.75

2.6 Total: 23.30

AGREED: AGREED:
FOR CONTRACTOR FOR ENGINEER
CSC&EC Rougton&BCHOD

DATE DATE
PPCR OPRC Kalomo Dundumwezi Ngoma Itezhi Tezhi Namwala Site Interim
Interim Measurments
Description: Backfilling
Chainage Average Average
Road No Length Volume (m3)
Start End Width Depth
3.9 9.85 0.8 30.73
L4 4+750 9.7

0.8

10

0.8

3.9

3.4 8.75 1 29.75


7.7
4+950
1

9.8

3.4 Total: 60.48

AGREED: AGREED:
FOR CONTRACTOR FOR ENGINEER
CSC&EC Rougton&BCHOD

DATE DATE
PPCR OPRC Kalomo Dundumwezi Ngoma Itezhi Tezhi Namwala Site Interim
Interim Measurments

Description: Backfilling
Chainage Average Average
Road No Length Volume (m3)
Start End Width Depth
0 0 0 0.00
L4 0
0+000
0

0 0 0 0.00

0 0.00

AGREED: AGREED:
FOR CONTRACTOR FOR ENGINEER
CSC&EC Rougton&BCHOD

DATE DATE
PPCR OPRC Kalomo Dundumwezi Ngoma Itezhi Tezhi Namwala Site Interim
Interim Measurments
Description: Backfilling

Chainage Average Average


Road No Length Volume (m3)
Start End Width Depth

3 12 0.95 34.20
L4 3+225 11.8

0.95

12.2

0.95

3.5 9.4 0.8 26.32


9.1
4+625
0.8

9.7

0.8

3.5 Total: 60.52

AGREED: AGREED:
FOR CONTRACTOR FOR ENGINEER
CSC&EC Rougton&BCHOD

DATE DATE
PPCR OPRC Kalomo Dundumwezi Ngoma Itezhi Tezhi Namwala Site Interim
Interim Measurments
Description: Backfilling
Chainage Average Average
Road No Length Volume (m3)
Start End Width Depth
4 8.6 0.6 20.64
L4 6+275 8.2

0.6

0.6

0 Total: 20.64

AGREED: AGREED:
FOR CONTRACTOR FOR ENGINEER
CSC&EC Rougton&BCHOD

DATE DATE
PPCR OPRC Kalomo Dundumwezi Ngoma Itezhi Tezhi Namwala Site Interim
Interim Measurments

Description: Backfilling
Chainage Average Average
Road No Length Volume (m3)
Start End Width Depth
0 0 0 0.00
L4 0+000 0

0 0 0 0.00

0 0.00

AGREED: AGREED:
FOR CONTRACTOR FOR ENGINEER
CSC&EC Rougton&BCHOD

DATE DATE
PPCR OPRC Kalomo - Dundumwezi - Ngoma - Itezhi Tezhi - Namwala
Interim Measurments
Road Link: Itezhi - Tezhi - Namwala (Baanga Potoon)

Description: Removal of Culverts and backfilling

Chainage Average Average


Date Length Volume (m3)
Start End Width Depth

18-Aug-17 2+700 2.44 5.30 0.95 12.29


2+775 2.60 5.65 0.75 11.02
3+225 3.00 12.00 0.95 34.20
4+625 3.50 9.40 0.80 26.32
4+750 3.90 9.85 0.80 30.73
4+950 3.40 8.75 1.00 29.75
6+275 4.00 8.60 0.60 20.64

Total(m3) 164.94

AGREED: AGREED:
FOR CONTRACTOR FOR ENGINEER
CSC&EC Rougton&BCHOD
DATE DATE