URBAN UPGRADING PROGRAMME FOR THE TOWNS OF KIGOMA, LINDI AND SUMBAWANGA

TIME SHEET

Name : COLMAN NGAINAYO Month : January Year: 2014

Position : Resident Engineer

Project Number ACTIVITY TOTAL DAYS


DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

LOCATION URBAN UPGRADING PROGRAMME FOR


THE TOWNS OF KIGOM, LINDI AND
KIGOMA SUMBAWANGA
LINDI LOT 3: SUMBAWANGA WATER SUPPLY
DAR ES SALAAM AND SANITATION 3 1 1 1
SUMBAWANGA 26 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL DAYS WORKED 29
VACATION 0
TRAVEL 2 1 1
PUBLIC HOLIDAYS 0
SICK LEAVE 0

ACCUMULATED TOTAL LAST MONTH 271 WORK


NET TOTAL THIS MONTH 31 PLACE Sumbawanga/Tanzania
ACCUMULATED TO NEXT MONTH 302

SIGNATURE:____________________ DATE: 1/31/2014 APPROVED:___________________ APPROVED:___________________


MD SUWASA MoW

TEAM LEADER:
/Juergen Steinmann/
FULL PROJECT TITLE

TIME SHEET

Name : Month : February Year: 2013

Position :

Project Number ACTIVITY TOTAL DAYS


DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

LOCATION
Project Title

TOTAL DAYS WORKED 0


VACATION 0
TRAVEL 0
PUBLIC HOLIDAYS 0
SICK LEAVE 0

ACCUMULATED TOTAL LAST MONTH 302 WORK


NET TOTAL THIS MONTH 0 PLACE TOWN / COUNTRY
ACCUMULATED TO NEXT MONTH 302

SIGNATURE:___________________________________ DATE: 2/28/2013 APPROVED:____________________________________


FULL PROJECT TITLE

TIME SHEET

Name : Month : March Year: 2013

Position :

Project Number ACTIVITY TOTAL DAYS


DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

LOCATION
Project Title

TOTAL DAYS WORKED 0


VACATION 0
TRAVEL 0
PUBLIC HOLIDAYS 0
SICK LEAVE 0

ACCUMULATED TOTAL LAST MONTH 302 WORK


NET TOTAL THIS MONTH 0 PLACE TOWN / COUNTRY
ACCUMULATED TO NEXT MONTH 302

SIGNATURE:___________________________________ DATE: 3/31/2013 APPROVED:____________________________________


URBAN UPGRADING PROGRAMME FOR THE TOWNS OF KIGOMA, LINDI AND SUMBAWANGA

TIME SHEET

Name : COLMAN NGAINAYO Month : April Year: 2013

Position : Resident Engineer

Project Number ACTIVITY TOTAL DAYS


DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
LOCATION
URBAN UPGRADING PROGRAMME FOR
THE TOWNS OF KIGOM, LINDI AND
SUMBAWANGA
LOT 3: SUMBAWANGA WATER SUPPLY
AND SANITATION
Sumbawanga
TOTAL DAYS WORKED 15 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
VACATION 0
TRAVEL 0
PUBLIC HOLIDAYS 1 1
SICK LEAVE 0

ACCUMULATED TOTAL LAST MONTH 302 WORK


NET TOTAL THIS MONTH 16 PLACE Sumbawanga / Tanzania
ACCUMULATED TO NEXT MONTH 318

SIGNATURE:___________________________________ DATE: 4/30/2013 APPROVED:____________________________________

TEAM LEADER:
/Boris Jovkov/
URBAN UPGRADING PROGRAMME FOR THE TOWNS OF KIGOMA, LINDI AND SUMBAWANGA

TIME SHEET

Name : COLMAN NGAINAYO Month : May Year: 2013

Position : Resident Engineer

Project Number ACTIVITY TOTAL DAYS


DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
LOCATION OF WORK
URBAN UPGRADING PROGRAMME FOR
THE TOWNS OF KIGOM, LINDI AND
SUMBAWANGA
Dar es Salaam LOT 3: SUMBAWANGA WATER SUPPLY 0
Lindi AND SANITATION 0
Sumbawanga 30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL DAYS WORKED 30
VACATION 0
TRAVEL 1 1
PUBLIC HOLIDAYS 0
SICK LEAVE 0

ACCUMULATED TOTAL LAST MONTH 318 WORK


NET TOTAL THIS MONTH 31 PLACE Sumbawanga/Tanzania
ACCUMULATED TO NEXT MONTH 349

SIGNATURE:___________________________________ DATE: 5/31/2013 APPROVED:____________________________________

TEAM LEADER:
/Boris Jovkov/
URBAN UPGRADING PROGRAMME FOR THE TOWNS OF KIGOMA, LINDI AND SUMBAWANGA

TIME SHEET

Name : COLMAN NGAINAYO Month : June Year: 2013

Position : Resident Engineer

Project Number ACTIVITY TOTAL DAYS


DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

LOCATION URBAN UPGRADING PROGRAMME FOR


THE TOWNS OF KIGOM, LINDI AND
SUMBAWANGA
LOT 3: SUMBAWANGA WATER SUPPLY
AND SANITATION

TOTAL DAYS WORKED 30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1


VACATION 0
TRAVEL 0
PUBLIC HOLIDAYS 0
SICK LEAVE 0

ACCUMULATED TOTAL LAST MONTH 349 WORK


NET TOTAL THIS MONTH 30 PLACE Sumbawanga/Tanzania
ACCUMULATED TO NEXT MONTH 379

SIGNATURE:___________________________________ DATE: 6/30/2013 APPROVED:____________________________________

TEAM LEADER:
/Boris Jovkov/
URBAN UPGRADING PROGRAMME FOR THE TOWNS OF KIGOMA, LINDI AND SUMBAWANGA

TIME SHEET

Name : COLMAN NGAINAYO Month : July Year: 2013

Position : Resident Engineer

Project Number ACTIVITY TOTAL DAYS


DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

LOCATION URBAN UPGRADING PROGRAMME FOR


THE TOWNS OF KIGOM, LINDI AND
KIGOMA SUMBAWANGA
LINDI LOT 3: SUMBAWANGA WATER SUPPLY
DAR ES SALAAM AND SANITATION 5 1 1 1 1 1
SUMBAWANGA 23 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL DAYS WORKED 28
VACATION 0
TRAVEL 2 1 1
PUBLIC HOLIDAYS 1 1
SICK LEAVE 0

ACCUMULATED TOTAL LAST MONTH 379 WORK


NET TOTAL THIS MONTH 31 PLACE Sumbawanga/Tanzania
ACCUMULATED TO NEXT MONTH 410

SIGNATURE:____________________ DATE: 7/31/2013 APPROVED:___________________ APPROVED:___________________


MD SUWASA MoW

TEAM LEADER:
/Boris Jovkov/
URBAN UPGRADING PROGRAMME FOR THE TOWNS OF KIGOMA, LINDI AND SUMBAWANGA

TIME SHEET

Name : COLMAN NGAINAYO Month : August Year: 2013

Position : Resident Engineer

Project Number ACTIVITY TOTAL DAYS


DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

LOCATION URBAN UPGRADING PROGRAMME FOR


THE TOWNS OF KIGOM, LINDI AND
KIGOMA SUMBAWANGA
LINDI LOT 3: SUMBAWANGA WATER SUPPLY
DAR ES SALAAM AND SANITATION
SUMBAWANGA 27 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL DAYS WORKED 0
VACATION 0
TRAVEL 0
PUBLIC HOLIDAYS 4 1 1 1 1
SICK LEAVE 0

ACCUMULATED TOTAL LAST MONTH 410 WORK


NET TOTAL THIS MONTH 31 PLACE Sumbawanga/Tanzania
ACCUMULATED TO NEXT MONTH 441

SIGNATURE:____________________ DATE: 7/31/2013 APPROVED:___________________ APPROVED:___________________


MD SUWASA MoW

TEAM LEADER:
/Boris Jovkov/
URBAN UPGRADING PROGRAMME FOR THE TOWNS OF KIGOMA, LINDI AND SUMBAWANGA

TIME SHEET

Name : COLMAN NGAINAYO Month : September Year: 2013

Position : Resident Engineer

Project Number ACTIVITY TOTAL DAYS


DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

LOCATION URBAN UPGRADING PROGRAMME FOR


THE TOWNS OF KIGOM, LINDI AND
KIGOMA SUMBAWANGA 3 1 1 1
LINDI LOT 3: SUMBAWANGA WATER SUPPLY
DAR ES SALAAM AND SANITATION 3 1 1 1
SUMBAWANGA 18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL DAYS WORKED 0
VACATION 0
TRAVEL 4 1 1 1 1
PUBLIC HOLIDAYS 0
SICK LEAVE 0

ACCUMULATED TOTAL LAST MONTH 441 WORK


NET TOTAL THIS MONTH 28 PLACE Sumbawanga/Tanzania
ACCUMULATED TO NEXT MONTH 469

SIGNATURE:____________________ DATE: 9/30/2013 APPROVED:___________________ APPROVED:___________________


MD SUWASA MoW

TEAM LEADER:
/Juergen Steinmann/
URBAN UPGRADING PROGRAMME FOR THE TOWNS OF KIGOMA, LINDI AND SUMBAWANGA

TIME SHEET

Name : COLMAN NGAINAYO Month : October Year: 2013

Position : Resident Engineer

Project Number ACTIVITY TOTAL DAYS


DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

LOCATION URBAN UPGRADING PROGRAMME FOR


THE TOWNS OF KIGOM, LINDI AND
KIGOMA SUMBAWANGA
LINDI LOT 3: SUMBAWANGA WATER SUPPLY
DAR ES SALAAM AND SANITATION 3 1 1 1
SUMBAWANGA 23 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL DAYS WORKED 0
VACATION 0
TRAVEL 3 1 1 1
PUBLIC HOLIDAYS 2 1 1
SICK LEAVE 0

ACCUMULATED TOTAL LAST MONTH 469 WORK


NET TOTAL THIS MONTH 31 PLACE Sumbawanga/Tanzania
ACCUMULATED TO NEXT MONTH 500

SIGNATURE:____________________ DATE: 10/31/2013 APPROVED:___________________ APPROVED:___________________


MD SUWASA MoW

TEAM LEADER:
/Juergen Steinmann/
URBAN UPGRADING PROGRAMME FOR THE TOWNS OF KIGOMA, LINDI AND SUMBAWANGA

TIME SHEET

Name : COLMAN NGAINAYO Month : November Year: 2013

Position : Resident Engineer

Project Number ACTIVITY TOTAL DAYS


DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

LOCATION URBAN UPGRADING PROGRAMME FOR


THE TOWNS OF KIGOM, LINDI AND
KIGOMA SUMBAWANGA
LINDI LOT 3: SUMBAWANGA WATER SUPPLY
DAR ES SALAAM AND SANITATION
SUMBAWANGA 16 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL DAYS WORKED 0
VACATION 12 1 1 1 1 1 1 1 1 1 1 1 1
TRAVEL 2 1 1
PUBLIC HOLIDAYS 0
SICK LEAVE 0

ACCUMULATED TOTAL LAST MONTH 500 WORK


NET TOTAL THIS MONTH 16 PLACE Sumbawanga/Tanzania
ACCUMULATED TO NEXT MONTH 516

SIGNATURE:____________________ DATE: 11/30/2013 APPROVED:___________________ APPROVED:___________________


MD SUWASA MoW

TEAM LEADER:
/Juergen Steinmann/
URBAN UPGRADING PROGRAMME FOR THE TOWNS OF KIGOMA, LINDI AND SUMBAWANGA

TIME SHEET

Name : COLMAN NGAINAYO Month : December Year: 2013

Position : Resident Engineer

Project Number ACTIVITY TOTAL DAYS


DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

LOCATION URBAN UPGRADING PROGRAMME FOR


THE TOWNS OF KIGOM, LINDI AND
KIGOMA SUMBAWANGA
CHINA LOT 3: SUMBAWANGA WATER SUPPLY 3 1 1 1
DAR ES SALAAM AND SANITATION 7 1 1 1 1 1 1 1
SUMBAWANGA 19 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL DAYS WORKED 31
VACATION 0
TRAVEL 2 1 1
PUBLIC HOLIDAYS 0
SICK LEAVE 0

ACCUMULATED TOTAL LAST MONTH 516 WORK


NET TOTAL THIS MONTH 31 PLACE Sumbawanga/Tanzania
ACCUMULATED TO NEXT MONTH 547

SIGNATURE:____________________ DATE: 112/31/2013 APPROVED:___________________ APPROVED:___________________


MD SUWASA MoW

TEAM LEADER:
/Juergen Steinmann/