Dump Condenser

Steam Quantity 5000 kg/hr


heat load Q 2551280 Kcal/hr
HTA A 14.86 M2
LMTD DT 114.35
Heat transfer Coefficient U 1501.42 Kcal/m2.C

Steam Condensate Quantity Temp deg C


Evaporation 6000 Kg/hr 80
Heat load 276000 Kcal/hr
MCW PUMP
Capacity 1761 GPM 396225 Kg/hr
396.225 Tons/hr
316980 Kg/hr
Condenser inlet temp 32 deg.C
0.8707174
condenser outlet temp 32.87 deg.C

LMTD 14.28 Deg.C

Heat transfer Co-efficient 1501.42 Kcal/m2.C

HTA required 12.87 M2


14.16 M2

* minimum Temp difference between condensate out and water inlet is 10 Deg.c

Steam Condensate Quantity Temp deg C


Evaporation 6000 Kg/hr 80
Heat load 240000 Kcal/hr
MCW PUMP
Capacity 1761 GPM 396225 Kg/hr
396.225 Tons/hr
316980 Kg/hr
Condenser inlet temp 30 deg.C
0.7571456
condenser outlet temp 30.76 deg.C

LMTD 24.62 Deg.C

Heat transfer Co-efficient 1501.42 Kcal/m2.C


HTA required 6.49 M2
7.14 M2
80
34
47.13
2
32.87 32

45.13
3.159763

80
40
49.2429
10
30.76 30

39.24285
1.594179
Condenser HTA

Steam Condensate Quantity Temp deg C


Evaporation 6000 Kg/hr 80
Heat load 240000 Kcal/hr

MCW PUMP
Capacity 1761 GPM 396225 Kg/hr
396.225 Tons/hr
316980 Kg/hr
Condenser inlet temp 30 deg.C
0.7571456
condenser outlet temp 30.76 deg.C

LMTD 10.69 Deg.C

Heat transfer Co-efficient 560 Kcal/m2.C ** Assumption

HTA required 40.08 M2


44.09 M2
80
40
49.24
30.76 10
30

39.24
3.669697
6