Abstract of Quantity/Toilet Block/1

Government of Nepal
Department of Urban Development and Building Construction
Pokhara-Damauli MegaCity
Regional Landfill Site
Belchautara-Shuklagandaki
Abstract of Quantity
S/N Description of Work Unit Quantity Rate (NRs.)
Site Preparation : Preparation of site including levelling ground , cutting trees,
removing away bushes, remains of old building like concrete by chipping, removing
loose earth, soil and brick- bats etc. along with preparation of ground level and site
1 Sq.m 86.42 18.51
level plan, and setting out as per drawing, specification and instruction of the
engineer, all complete.

2 Earthwork in excavation
Earthwork in excavation using manual means including lift up to 1.5m and
disposal of soil up to a lead of 10m. as per drawing, specification and instruction of Cu.m 78.15 580.40
the engineer, all complete.

3 Backfill
Back filling upto any depth below ground level around foundations, plinths,
trenches, drains etc to proper grade and level in layers not exceeding 200 mm
thickness using/with approved materials with a lead upto 500m and compacted as Cu.m 46.89 404.28
specified including watering, ramming/compaction by manual/mechanical means,
dressing etc all complete for the following as per specification and instruction of
Backfill using insituall
engineer-in-charge, soilcomplete. Cu.m 16.79 1,045.92

4 Soling

Flatbrick Soling: Providing and laying, dry brick soling in floor with first class Sq.m 99.42 993.83
chimney made bricks complete to specified level including sand filling on joints, as
per drawing, specification and instruction of engineer-in-charge, all complete.

Plain Cement Concrete : Providing and laying of plain cement concrete as leveling
5 course for foundation, basement and all locations depth with plain cement concrete
grade as mentioned below mixed as per nominal mix design of specified grade for
Plain cement concrete work , including lead from batching site to site of work,
placing in position mechanical compaction, finishing, curing (if necessary),
consolidation, finishing, curing etc. complete as per specifications ,drawings and as
per instruction of engineer-in-charge.
i Nominal mix (1:3:6) Cu.m 3.29 11,669.85
ii Nominal mix (1:2:4) Cu.m 4.39 12,429.70

6 PCC for RCC

Providing and laying concrete for reinforced concrete works with approved coarse
sand and graded hard stone aggregate of range 10 - 20mm nominal size in
foundations/substructure, grade slab, paving, drains, under floors etc at any level
below finished floor level, any shape, position or thickness etc complete including
use of plasticizer/ superplasticizer and micro-silica conforming to IS:9103 (latest) to
achieve required slump in concrete all complete as per specification & drawing and
instruction of Engineer-in-charge for the following.
i. M 20 Nominal mix (1:1.5:3) Cu.m 27.71 15,631.95

Reinforcement for RCC work including supplying, delivering and storing of various
diameters as required at site of work transportation, unloading at site, straightening,
cutting, bending, placing in position at any level, binding in position of steel
reinforcements Fe-550D including cost of binding wire, labour, scaffolding,
transportation to & from stores etc complete all as per specifications, drawings and
as per instruction of engineer-in-charge.
7 Rate shall includes preparing and obtaining prior approval of bar bending schedule. MT 5.85 122,325.50

Prepared By: Approved By: Checked By:


Abstract of Quantity/Toilet Block/2

Abstract of Quantity
S/N Description of Work Unit Quantity Rate (NRs.)
Formwork : Providing & Fixing form work with approved quality laminated ply
wood of required thickness and smooth surface for foundation, columns, beams,
slabs staircases, etc. for all heights including proper bracing, ties, anchors, bolts,
nuts, washers, packing plates, fasteners, producing finished concrete surfaces. at all
locations including chamfers, splays, keys, wedges, metal props, rails, bracings,
brackets, cutting holes if specified for pipes etc. providing and applying approved
form oil on all surfaces of formwork coming in contact with concrete all materials,
labour etc.complete as per drawing, specifications and instructions of the engineer-
8 in-charge, all complete.
(Area of formwork in contact with concrete shall only be measured for payment and
stop boards for construction joints will not be measured for payment)
Note : - Prior approval of engineer-in-charge to be obtained for clearance of form
work for laying RCC.

Formwork for Beam and Slab Sq.m 160.15 1,163.37


Formwork for Column Sq.m 48.89 1,426.58

Brick work : Providing brick work in cement mortar in walls, chambers etc. in
thickness mentioned below at all heights, places and position above plinth including
raking out joints, curing, scaffolding etc as per drawings, specification and
9 instruction of engineer-in-charge, all complete.

230 mm thickness in 1:6 (Cement : Sand ) mortar. (Class A Brick) Cu.m 21.90 15,330.07
110mm thickness in 1:4 (Cement : Sand ) mortar. (Class A Brick) Cu.m 10.21 14,800.73

Plaster works: Providing and applying plaster works in cement sand mortar for all
plain / curved surfaces of brick / block / RCC walls and finishing the same (smooth
or broom) in correct line, level & plumb, making of edges, corners, sill, jambs,
soffits, grooves etc.with all necessary surface preparation, scaffolding, hacking of
10 concrete surface to receive plaster, watering, curing, cleaning etc. complete at all
levels and heights as per drawing, specification and instruction of engineer-in-
charge.

12.5 mm thick in 1:4 (cement : sand ) mortar Sq.m 195.22 405.82


12.5 mm thick in 1:3 (cement : sand ) mortar Sq.m 69.05 405.82
20 mm thick in 1:6 (cement : sand ) mortar Sq.m 110.79 481.56

11 Aluminium door, windows and partition


Supplying and fitting Aluminium sliding window without Ventilator using section
(black anodized or white powder coated) of size 101mm x 45mm x 1.50mm, with
5mm glass. All works to be completed as per drawings, specification and instruction
of engineer-in-charge. Sq.m 15.15 8,166.84

12 Wooden works
Wooden door frames : Providing fabricating and erection of wooden door frames
( Agrakh ) . All works to be completed as per drawing, specification and instruction Cu.m 0.44 279,165.49
of engineer-in-charge.
Wooden flush doors Sq.m 17.01 9,117.47

13 Flooring works
Ceramic tiles: Supplying and fixing of Porcelaine tiles approved color and quality
on wall and floor with a minimum of 40 mm underbed in 1:4 cement sand mortar by
volume in case of floor and 1:4 cement sand plaster in case of walls with 1:1 cement
sand mortar with approved color and quality of material , laid using 2mm plastic
a. spacer at corners to acheive perfectly straight joints line filled with joint compound
of matching shade. The work to be done in specified line and level, plumb as per
specification and instruction of engineer-in-charge all complete.

i. Glazed Porcelaine Tiles on wall Sq.m 105.98 3,171.55


ii. 300mm x 300mm Anti skid Porcelaine Tiles on floor Sq.m 47.72 3,171.55
iii Floor Tiles (10mm thick Vitrified Ceramic Tiles)

Granite works: Providing and laying 16 mm thick pre-polished Granite stone of


approved color and texture in flooring on floor, wash basin slabs etc. with average
30mm thk of 1 cement : 3 sand by volume underbed brought to proper level with
b. polishing, edge polishing, curing, cleaning, etc complete at all levels as per drawing, Sq.m 8.78 7,394.77
specification and instruction of engineer-in-charge, all complete.Rate shall be
inclusive of pigments, curing, grinding, granite polishing etc.

Prepared By: Approved By: Checked By:


Abstract of Quantity/Toilet Block/3

Abstract of Quantity
S/N Description of Work Unit Quantity Rate (NRs.)

Screeding works: Providing and laying, 50 mm thick screeding with 1:2:4 concrete
mix on proper slope after scraping, cleaning and watering (which in some case may
require air blast or water blast method ) the old surface as per drawing, specification
c and instruction of engineer-in-charge, all complete.Rate shall be inclusive of all the Sq.m 68.44 823.63
preparation works for the job to be done and preparing sample for obtaining
approval for the screeding work.

14 Painting works
Painting works : Providing and applying, inside and outside painting work on wall
and ceiling of approved color including necesary primer to give uniform color after
rendering surface clean as per specifications, drawings, and instruction of the
engineer-in-charge, all complete.

i Two coat of acrylic emulsion paint with primer coat Sq.m 202.29 186.29
ii Two coat of external paint with primer coat Sq.m 74.95 266.23
Enamel Paint: Providing and applying, inside and outside painting with approved
color and paints with two coats of primer to give uniform color after rendering
surface clean with sandpapering as per drawing, specifications and instruction of the Sq.m 14.67 237.40
engineer-in-charge, all complete.

Chopra Polish Sq.m 17.01 197.80

Staircase railing: Providing and fitting stainless steel pipe railling in verandah and
15 staircase with 50 mm dia stainless steel pipe handrail 2 row 25 mm dia stainless steel Rm 22.74 4,526.40
pipe in between handrail and floor and 50 mm dia stainless stell pipe for vertical
post including welding, cutting, drilling, fixing, joining, tighening, polishing as per
specification and instruction of engineer-in-charge all complete

16 Metal works
Metal work : Supplying, fabricating and erecing metal grill with frame of 4.5mm x
20mm metal strip with 12mm x 12mm solid square rod with a single coat of
redoxide paint. All work to be completed as per drawing, specification and Sq.m 15.15 3,214.25
instruction of engineer-in-charge.

Stone Cladding: Providing and laying stone of approved quality and size in
underbed of 1:4 cement sand mortar by volume with proper joint packing is
17 Sq.m 47.45 5,073.34
proposed line and level including filling of joints with cement sand mortar and edge
restraining wherever necessary and cleaning the stone surface after completion of
task.
Total=
Electrical (7% of Total)
Sanitary (7% of Total)
Sub Total=
4% Contingency=
13% VAT=
Grand Total=

Prepared By: Approved By: Checked By:


Abstract of Quantity/Toilet Block/4

on

Amount

1,599.63

45,358.26

18,956.69

17,555.77

98,806.58

38,393.81
54,566.38

433,161.33

715,764.60

Prepared By: Approved By: Checked By:


Abstract of Quantity/Toilet Block/5

Amount

186,313.71
69,745.50

335,651.88
151,115.45

79,224.18
28,021.87
53,352.03

123,727.63

122,832.82

155,088.16

336,120.87
151,346.37

64,926.08

Prepared By: Approved By: Checked By:


Abstract of Quantity/Toilet Block/6

Amount

56,369.24

37,684.60
19,953.94

3,482.66

3,364.58

102,930.34

48,695.89

240,729.98

3,794,840.82
265,638.86
265,638.86
4,326,118.54
173,044.74
584,891.23
5,084,054.51

Prepared By: Approved By: Checked By:


Summary Sheet/ Toilet Block/7

Government of Nepal
Department of Urban Development and Building Construction
Pokhara-Damauli MegaCity
Regional Landfill Site
Belchautara, Shuklagandaki
Summary Sheet

Foundation Ground First


S.N Item List Rate Unit Floor Floor Total
1 Site Preparation 18.51 Sq.m 86.42 86.42
2 Earthwork in Excavation 580.40 Cu.m 78.15 78.15
3 Backfilling in foundation 404.28 Cu.m 46.89 46.89
Filling Upto Plinth 1,045.92 Cu.m 16.79 16.79
4 Flat Brick Soling 993.83 Sq.m 99.42 99.42
5 PCC nominal mix (1:2:4) 12,429.70 Cu.m 4.39 4.39
PCC nominal mix (1:3:6) 11,669.85 Cu.m 3.29 3.29
PCC for RCC M20 nominal mix
6 (1:1.5:3) 15,631.95 Cu.m 14.51 13.20 27.71
7 Steel Reinforcement 122,325.50 MT 2.50 3.35 5.85
8 Formwork
Beam and Slab 1,163.37 Sq.m 59.16 100.99 160.15
Column 1,426.58 Sq.m 17.84 31.05 48.89
9 Brick Work
230mm thickness(1:4) 15,330.07 Cu.m 9.32 12.58 21.90
110mm thickness(1:6) 14,800.73 Cu.m 8.52 1.69 10.21
10 Plaster Work
20mm thick (1:6) 481.56 Sq.m 16.74 63.38 30.67 110.79
12.5mm thick (1:4) 405.82 Sq.m 195.22 195.22
12.5mm thick (1:3) 405.82 Sq.m 69.05 69.05
11 Aluminium Works 8,166.84 Sq.m 15.15 15.15
12 Wooden Works
Wooden Door Frame 279,165.49 Cu.m 0.44 0.44
Wooden Flush Door Shutter 9,117.47 Sq.m 17.01 17.01
13 Floor Finishing
a Ceramic Tiles
300 mm X 300 mm Anti-Skid
Porcelaine Tiles on Floor 3,171.55 Sq.m 47.72 47.72
Glazed Porcelaine Tiles on wall 3,171.55 Sq.m 105.98 105.98
Floor Tiles (10 mm thick Vitrified
Ceramic Tiles) 3,171.55 Sq.m
b Screeding works 823.63 Sq.m 11.85 56.59 68.44
14 Granite works 7,394.77 Sq.m 8.78 8.78
15 Painting Works
Two coat of external paint with Primer
Coat 266.23 Sq.m 8.67 35.61 30.67 74.95
Two coat of acrylic emulsion paint with
Primer Coat 186.29 Sq.m 202.29 202.29
Enamel Paint 237.40 Sq.m 14.67 14.67
Chopra Polish 197.80 Sq.m 17.01 17.01
16 Metal Works
Metal Grill on windows 3,214.25 Sq.m 15.15 15.15
Stainless Steel Railing 4,526.40 Rm 4.32 18.42 22.74
17 Stone Cladding 5,073.34 Sq.m 47.45 47.45

Prepared By: Checked By: Approved By:


Estimation/Toilet Block/8

Government of Nepal
Department of Urban Development and Building Construction
Pokhara-Damauli MegaCity
Regional Landfill Site
Belchautara-Shuklagandaki
Estimation Sheet
S.N Description Units NumbeLength Breadth Height Quantity Remarks

Site Preparation: Preparation of site including levelling ground, cutting trees, removing away bushes, remains of old building like concrete by
1 chipping, removing loose earth , soil and brick-bats etc. along with preparation of ground level and site level plan

Building Area sq.m 1 10.63 8.13 86.42

Total 86.42 sq.m


2 Earthwork in Excavation
ii By Manual: Earthwork in excavation using manual means including lift up to 1.5m and disposal of soil up to a lead of 10m
Footing
Footing F1 cu.m 1 2.905 2.905 1.654 13.96
Footing F2 cu.m 8 2.005 2.005 1.654 53.19

Footing Beam
Along A/(1-3) cu.m 1 1.99 0.61 1.024 1.24
Along B/(1-3) cu.m 1 1.09 0.61 1.024 0.68
Along C/(1-3) cu.m 1 1.99 0.61 1.024 1.24
Along 1/(A-C) cu.m 1 4.49 0.61 1.024 2.8
Along 2/(A-C) cu.m 1 3.59 0.61 1.024 2.24
Along 3/(A-C) cu.m 1 4.49 0.61 1.024 2.8
Total 78.15 cu.m
Backfilling in foundation: Back filling upto any depth below ground level around foundations, plinths, trenches, drains etc to proper grade and level
in layers not exceeding 200 mm thickness using/with approved materials with a lead upto 500m and compacted as specified including watering,
ramming/compaction by manual/mechanical means, dressing etc all complete for the following as per specification and instruction of engineer-in-
3
charge, all complete.

Backfilling 60% of volume of earthwork in excavation =


cu.m 46.89
Total 46.89 cu.m

Plinth Filling (floor area) cu.m 1 8.8 6.3 0.32 17.74


Steps at Entry cu.m 1 2.5 1.27 0.32 1.02
Ramp cu.m 1 4.3 1.4 0.32 0.965 product/2
Deduction
Plinth Beam+Brickwork cu.m 1 39.9 0.23 0.32 -2.94

Total 16.785 cu.m

4 FlatBrick Soling: Providing and laying, dry brick soling in floor with first class chimney made bricks complete to specified level including sand
filling in joints
Footing
Footing F1 sq.m 1 2.6 2.6 6.76
Footing F2 sq.m 8 1.7 1.7 23.12

Footing Beam
Along A/(1-3) sq.m 1 2.6 0.23 0.6
Along B/(1-3) sq.m 1 1.7 0.23 0.39
Along C/(1-3) sq.m 1 2.6 0.23 0.6
Along 1/(A-C) sq.m 1 5.1 0.23 1.17
Along 2/(A-C) sq.m 1 4.2 0.23 0.97
Along 3/(A-C) sq.m 1 5.1 0.23 1.17

Plinth Beam
Along A/(1-3) sq.m 1 5.4 0.23 1.24
Along B/(1-3) sq.m 1 5.4 0.23 1.24
Along C/(1-3) sq.m 1 5.4 0.23 1.24
Along 1/(A-C) sq.m 1 7.9 0.23 1.82
Along 2/(A-C) sq.m 1 7.9 0.23 1.82
Along 3/(A-C) sq.m 1 7.9 0.23 1.82

Brick Soling (for floor area) sq.m 1 8.8 6.3 55.44


Steps at Entry sq.m 1 2.5 1.27 3.18
Ramp sq.m 1 4.3 1.4 6.02
Deduction
Plinth Beam+Brickwork sq.m 1 39.9 0.23 -9.18

Total 99.42 sq.m

Prepared By: Approved By: Checked By:


Estimation/Toilet Block/9

Estimation Sheet
S.N Description Units NumbeLength Breadth Height Quantity Remarks
PCC Works: Providing and laying of plain cement concrete as levelling course of foundation, basement and all location depth, including lead from
5 batching site to site of work, placing in position mechanical compaction, finishing, curing (if necessary), consolidation, finishing, curing, etc.

PCC (1:3:6) in footing


Upto Plinth Level
Footing
Footing F1 cu.m 1 2.6 2.6 0.075 0.51
Footing F2 cu.m 8 1.7 1.7 0.075 1.73

Footing Beam
Along A/(1-3) cu.m 1 2.6 0.23 0.075 0.04
Along B/(1-3) cu.m 1 1.7 0.23 0.075 0.03
Along C/(1-3) cu.m 1 2.6 0.23 0.075 0.04
Along 1/(A-C) cu.m 1 5.1 0.23 0.075 0.09
Along 2/(A-C) cu.m 1 4.2 0.23 0.075 0.07
Along 3/(A-C) cu.m 1 5.1 0.23 0.075 0.09

Plinth Beam
Along A/(1-3) cu.m 1 5.4 0.23 0.075 0.09
Along B/(1-3) cu.m 1 5.4 0.23 0.075 0.09
Along C/(1-3) cu.m 1 5.4 0.23 0.075 0.09
Along 1/(A-C) cu.m 1 7.9 0.23 0.075 0.14
Along 2/(A-C) cu.m 1 7.9 0.23 0.075 0.14
Along 3/(A-C) cu.m 1 7.9 0.23 0.075 0.14

Total 3.29 cu.m


PCC (1:2:4)
Upto Plinth Level
Floor Area cu.m 1 8.8 6.3 0.075 4.16
Steps at Entry cu.m 1 2.5 1.27 0.075 0.24
Ramp cu.m 1 4.3 1.4 0.075 0.45
Deduction
Plinth Beam+Brickwork cu.m 1 39.9 0.23 0.075 -0.69
Coping cu.m 1 30.667 0.15 0.05 0.23
Total 4.39 cu.m

6 PCC for RCC

Nominal Mix: Providing and laying concrete for reinforced concrete works in foundations/substructure. Grade slab, paving, drains, under floors, etc
at any level below finished floor level, any shape, position or thickness etc complete, all complete.
PCC nominal mix(1:1.5:3)
Upto Plinth level
Footing
Footing F1
Rectangular Part cu.m 1 2.6 2.6 0.3 2.03
sloping area=
h/3*(A1+A2+
Sloping Part cu.m 1 A1= 0.25 A2= 6.76 0.2 0.554 (A1*A2)^0.5)
Footing F2
Rectangular Part cu.m 8 1.7 1.7 0.15 3.47 sloping area=
h/3*(A1+A2+
Sloping Part cu.m 8 A1= 0.25 A2= 2.89 0.15 1.596 (A1*A2)^0.5)
Sub Total 7.65 cu.m

Footing Beam
Along A/(1-3) cu.m 1 5.4 0.23 0.3 0.37
Along B/(1-3) cu.m 1 5.4 0.23 0.3 0.37
Along C/(1-3) cu.m 1 5.4 0.23 0.3 0.37
Along 1/(A-C) cu.m 1 7.9 0.23 0.3 0.55
Along 2/(A-C) cu.m 1 7.9 0.23 0.3 0.55
Along 3/(A-C) cu.m 1 7.9 0.23 0.3 0.55
Sub Total 2.76 cu.m

Prepared By: Approved By: Checked By:


Estimation/Toilet Block/10

Estimation Sheet
S.N Description Units NumbeLength Breadth Height Quantity Remarks
Plinth Beam
Along A/(1-3) cu.m 1 5.4 0.23 0.3 0.37
Along B/(1-3) cu.m 1 5.4 0.23 0.3 0.37
Along C/(1-3) cu.m 1 5.4 0.23 0.3 0.37
Along 1/(A-C) cu.m 1 7.9 0.23 0.3 0.55
Along 2/(A-C) cu.m 1 7.9 0.23 0.3 0.55
Along 3/(A-C) cu.m 1 7.9 0.23 0.3 0.55
Sub Total 2.76 cu.m

Column cu.m 1 0.3 0.3 1.474 0.13


cu.m 8 0.3 0.3 1.674 1.21
Sub Total 1.34 cu.m

Total 14.51 cu.m

Ground Floor
Column
Column C1 cu.m 9 0.3 0.3 2.875 2.33
Sub Total 2.33 cu.m
Beam
Along A/(1-3) cu.m 1 5.4 0.23 0.225 0.28
Along B/(1-3) cu.m 1 5.4 0.23 0.225 0.28
Along C/(1-3) cu.m 1 5.4 0.23 0.225 0.28
Along 1/(A-C) cu.m 1 7.9 0.23 0.225 0.41
Along 2/(A-C) cu.m 1 7.9 0.23 0.225 0.41
Along 3/(A-C) cu.m 1 7.9 0.23 0.225 0.41
Sub Total 2.07 cu.m

Slab cu.m 1 6.53 5 0.125 4.08


cu.m 1 6.3 3.8 0.125 2.99
Projections from Slab
Along A, C cu.m 4 2 0.3 0.125 0.3
Along 1 cu.m 1 3.3 0.23 0.125 0.09
Along 3 cu.m 1 2.825 0.3 0.125 0.11
cu.m 1 2.975 0.3 0.125 0.11
Sub Total 7.68 cu.m

Sill and Lintel


Main Wall
Along A/(1-3) cu.m 1 5.4 0.23 0.1 0.12
Along C/(1-3) cu.m 1 5.4 0.23 0.1 0.12
Along 1/(A-C) cu.m 1 7.9 0.23 0.1 0.18
Along 3/(A-C) cu.m 1 7.9 0.23 0.1 0.18
Deduction Opening cu.m 1 1.8 0.23 0.1 -0.04

Internal Wall
Along A'/(2-3) cu.m 2 1.5 0.11 0.1 0.03
Along A''/(1-2) cu.m 2 2 0.11 0.1 0.04
Along A''/(2-3) cu.m 2 1.5 0.11 0.1 0.03
Along A'''/(1-2) cu.m 2 1.6 0.11 0.1 0.04
Deduction
Door D1 cu.m 2 1.2 0.11 0.1 -0.03

Along B/(1-2) cu.m 2 2.7 0.11 0.1 0.06


Along B/(2-3) cu.m 2 2.7 0.11 0.1 0.06
Deductions
Door D1 cu.m 2 1.2 0.11 0.1 -0.03

Along B'/(1-3) cu.m 2 4.4 0.11 0.1 0.1


Deductions
Door D2 cu.m 8 0.75 0.11 0.1 0.07

Along 1'/(A-B) cu.m 2 4.47 0.11 0.1 0.1


Deduction
Door D1 cu.m 2 1.2 0.11 0.1 -0.03

Along 1'/(B-C) cu.m 2 1.5 0.11 0.1 0.03


Along 1''/(B-C) cu.m 2 1.5 0.11 0.1 0.03
Along 2'/(B-C) cu.m 2 1.5 0.11 0.1 0.03
Along 2''/(B-C) cu.m 2 1.5 0.11 0.1 0.03
Sub Total 1.12 cu.m

Total 13.2 cu.m

Formwork : Providing and fixing form work with approved quality laminated plywood of required thickness and smooth surface for foundation,
columns, beams, slabs, staircases, etc. for all heights and at all locations including chamfers, splays, keys, wedges, metal props, rails, bracings,
7 brackets, cutting holes if specified for pipes etc. providing and applying approved form oil on all surfaces of formwork.

Upto Plinth Level


Footing
Footing F1 sq.m 1 10.4 0.3 3.12
Footing F2 sq.m 8 6.8 0.15 8.16
Sub Total 11.28 cu.m
Footing Beam

Prepared By: Approved By: Checked By:


Estimation/Toilet Block/11

Estimation Sheet
S.N Description Units NumbeLength Breadth Height Quantity Remarks
Along A/(1-3) sq.m 1 10.8 0.3 3.24
Along B/(1-3) sq.m 1 10.8 0.3 3.24
Along C/(1-3) sq.m 1 10.8 0.3 3.24
Along 1/(A-C) sq.m 1 15.8 0.3 4.74
Along 2/(A-C) sq.m 1 15.8 0.3 4.74
Along 3/(A-C) sq.m 1 15.8 0.3 4.74
Sub Total 23.94 cu.m
Plinth Beam
Along A/(1-3) sq.m 1 10.8 0.3 3.24
Along B/(1-3) sq.m 1 10.8 0.3 3.24
Along C/(1-3) sq.m 1 10.8 0.3 3.24
Along 1/(A-C) sq.m 1 15.8 0.3 4.74
Along 2/(A-C) sq.m 1 15.8 0.3 4.74
Along 3/(A-C) sq.m 1 15.8 0.3 4.74
Sub Total 23.94 cu.m

Total 59.16 sq.m

Column sq.m 1 1.2 1.474 1.77


sq.m 8 1.2 1.674 16.07
Total 17.84 cu.m
Ground Floor
Column
Column C1 sq.m 9 1.2 2.875 31.05
Total 31.05 sq.m
Beam

Along A/(1-3) sq.m 1 10.8 0.225 2.43


Along B/(1-3) sq.m 1 10.8 0.225 2.43
Along C/(1-3) sq.m 1 10.8 0.225 2.43
Along 1/(A-C) sq.m 1 15.8 0.225 3.56
Along 2/(A-C) sq.m 1 15.8 0.225 3.56
Along 3/(A-C) sq.m 1 15.8 0.225 3.56

Slab (Sides) sq.m 1 18.06 0.125 2.26


sq.m 1 16.4 0.125 2.05
Slab (Bottom) sq.m 1 6.53 5 32.65
sq.m 6.3 3.8 23.94

Projections from slab (sides)


Along A, C sq.m 4 2.6 0.125 1.3
Along 1 sq.m 1 3.76 0.125 0.47
Along 3 sq.m 1 3.425 0.125 0.43
sq.m 1 3.575 0.125 0.45

Projection from Slab (bottom)


Along A, C sq.m 4 2 0.3 2.4
Along 1 sq.m 1 3.3 0.23 0.76
Along 3 sq.m 1 2.825 0.3 0.85
sq.m 1 2.975 0.3 0.89
Sill and Lintel
Main Wall
Along A/(1-3) cu.m 2 5.4 0.1 1.08
Along C/(1-3) cu.m 2 5.4 0.1 1.08
Along 1/(A-C) cu.m 2 7.9 0.1 1.58
Along 3/(A-C) cu.m 2 7.9 0.1 1.58
Deduction Opening cu.m 2 1.8 0.1 -0.36

Internal Wall
Along A'/(2-3) cu.m 4 1.5 0.1 0.6
Along A''/(1-2) cu.m 4 2 0.1 0.8
Along A''/(2-3) cu.m 4 1.5 0.1 0.6
Along A'''/(1-2) cu.m 4 1.6 0.1 0.64
Deduction 4
Door D1 cu.m 4 1.2 0.1 -0.48

Along B/(1-2) cu.m 4 2.7 0.1 1.08


Along B/(2-3) cu.m 4 2.7 0.1 1.08
Deductions 4
Door D1 cu.m 4 1.2 0.1 -0.48

Along B'/(1-3) cu.m 4 4.4 0.1 1.76


Deductions 4
Door D2 cu.m 4 0.75 0.1 0.3

Along 1'/(A-B) cu.m 4 4.47 0.1 1.79


Deduction 4
Door D1 cu.m 4 1.2 0.1 -0.48

Along 1'/(B-C) cu.m 4 1.5 0.1 0.6


Along 1''/(B-C) cu.m 4 1.5 0.1 0.6
Along 2'/(B-C) cu.m 4 1.5 0.1 0.6
Along 2''/(B-C) cu.m 4 1.5 0.1 0.6
Total 100.99 sq.m

Prepared By: Approved By: Checked By:


Estimation/Toilet Block/12

Estimation Sheet
S.N Description Units NumbeLength Breadth Height Quantity Remarks

Prepared By: Approved By: Checked By:


Estimation/Toilet Block/13

Estimation Sheet
S.N Description Units NumbeLength Breadth Height Quantity Remarks
Brick work: Providing brick work in cement mortar in walls, chambers, etc. in thickness mentioned below at all heights, places and position above
8 plinth including raking out joints, curing, scaffolding, etc.
i 230 mm thickness or higher in 1:6 (Cement: Sand) mortar. (Class A Brick)
Upto Plinth Level
Along A/(1-3) cu.m 1 5.4 0.23 0.874 1.09
Along B/(1-3) cu.m 1 5.4 0.23 0.874 1.09
Along C/(1-3) cu.m 1 5.4 0.23 0.874 1.09
Along 1/(A-C) cu.m 1 7.9 0.23 0.874 1.59
Along 2/(A-C) cu.m 1 7.9 0.23 0.874 1.59
Along 3/(A-C) cu.m 1 7.9 0.23 0.874 1.59
Ramp cu.m 1 4.3 0.23 0.45 0.225 product/2
Steps at entry cu.m 1 4.67 0.3 0.15 0.21
cu.m 1 4.07 0.3 0.3 0.37
cu.m 1 3.47 0.3 0.45 0.47
Total 9.315 cu.m
Ground Floor
Main Wall
Along A/(1-2) cu.m 1 2.7 0.23 2.65 1.65
Deductions
Ventilation V cu.m 1 2 0.23 0.8 -0.37

Along A/(2-3) cu.m 1 2.7 0.23 2.65 1.65


Deductions
Ventilation V cu.m 1 2 0.23 0.8 -0.37

Along C/(1-2) cu.m 1 2.7 0.23 2.65 1.65


Deductions
Ventilation V cu.m 1 2 0.23 0.8 -0.37

Along C/(2-3) cu.m 1 2.7 0.23 2.65 1.65


Deductions
Ventilation V cu.m 1 2 0.23 0.8 -0.37

Along 1/(A-B) cu.m 1 2.76 0.23 2.65 1.68


Deductions
Ventilation V cu.m 1 2 0.23 0.8 -0.37

Along 1/(B-C) cu.m 1 3.7 0.23 2.65 2.26


Deductions
Ventilation V cu.m 1 2 0.23 0.8 -0.37

Along 3/(A-B) cu.m 1 4.2 0.23 2.65 2.56


Deductions
Window W cu.m 1 1.5 0.23 0.8 -0.28

Along 3/(B-C) cu.m 1 3.7 0.23 2.65 2.26


Deductions
Window W cu.m 1 1.5 0.23 0.8 -0.28

Total 12.58 cu.m

ii Partition 110 mm: 110 mm thickness in 1:4 (Cement : Sand) mortar. (Class A Brick)
Ground Floor
Internal Wall
Along A'/(2-3) cu.m 1 1.5 0.11 2.5 0.41
Along A''/(1-2) cu.m 1 2 0.11 2.875 0.63
Along A''/(2-3) cu.m 1 1.5 0.11 2.5 0.41
Along A'''/(1-2) cu.m 1 1.6 0.11 2.875 0.51
Deduction
Door D1 cu.m 1 1.2 0.11 2.65 -0.35

Along B/(1-2) cu.m 1 2.7 0.11 2.65 0.79


Along B/(2-3) cu.m 1 2.7 0.11 2.65 0.79
Deductions
Door D1 cu.m 1 1.2 0.11 2.65 -0.35

Along B'/(1-3) cu.m 1 4.4 0.11 2.5 1.21


Deductions
Door D2 cu.m 4 0.75 0.11 2.1 0.69

Along 1'/(A-B) cu.m 1 4.47 0.11 2.875 1.41


Deduction
Door D1 cu.m 1 1.2 0.11 2.65 -0.35

Along 1'/(B-C) cu.m 1 1.5 0.11 2.5 0.41


Along 1''/(B-C) cu.m 1 1.5 0.11 2.5 0.41
Along 2'/(A-B) cu.m 1 2.225 0.11 2.5 0.61
Deduction
Door D2 cu.m 1 0.75 0.11 2.1 0.17
Along 2'/(B-C) cu.m 1 1.5 0.11 2.5 0.41
Along 2''/(B-C) cu.m 1 1.5 0.11 2.5 0.41
Projections
At 1/B cu.m 1 0.76 0.11 3.53 0.3
Total 8.52 cu.m

Prepared By: Approved By: Checked By:


Estimation/Toilet Block/14

Estimation Sheet
S.N Description Units NumbeLength Breadth Height Quantity Remarks

Roof
Parapet Wall cu.m 1 30.667 0.11 0.5 1.69
Total 1.69 cu.m

Plaster works: Providing and applying plaster works in cement sand mortar for all surfaces of brick/ block/ RCC walls and finishing the same
9 (smooth or broom) in correct line, level and plumb, making of edges, corners, sill, jambd, soffits, grooves etc. with all necessary surfaces preparation,
scaffolding, hacking of concrete surface to receive plaster, waterig, curing, cleaning, etc.
i 20 mm thick in 1:6 (cement : sand) mortar (outside)
Upto Plinth Level
Along A/(1-3) sq.m 1 6.53 0.45 2.94
Along C/(1-3) sq.m 1 6.53 0.45 2.94
Along 1/(A-C) sq.m 1 8.8 0.45 3.96
Along 3/(A-C) sq.m 1 8.8 0.45 3.96
Steps at entry sq.m 1 13.11 0.15 1.97
Ramp Sides sq.m 1 4.3 0.45 0.97 product/2
Total 16.74 sq.m
Ground Floor
Main Wall
Along A/(1-2) sq.m 1 2.7 2.65 7.16
Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along A/(2-3) sq.m 1 2.7 2.65 7.16


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along C/(1-2) sq.m 1 2.7 2.65 7.16


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along C/(2-3) sq.m 1 2.7 2.65 7.16


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along 1/(A-B) sq.m 1 2.76 2.65 7.31


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along 1/(B-C) sq.m 1 3.7 2.65 9.81


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along 3/(A-B) sq.m 1 4.2 2.65 11.13


Deductions
Window W sq.m 1 1.5 0.8 -0.6 product/2

Along 3/(B-C) sq.m 1 3.7 2.65 9.81


Deductions
Window W sq.m 1 1.5 0.8 -0.6 product/2

Along 1/B sq.m 1 0.76 3.53 2.68


Plaster on Column sq.m 4 0.6 3 7.2
sq.m 4 0.3 3 3.6
Total 63.38 cu.m

Roof
Parapet Wall sq.m 2 30.667 0.5 30.67
Total 30.67 sq.m

ii 12.5 mm thick in 1:4 (cement : sand) mortar (inside)


Ground Floor
a Main Wall
Along A/(1-2) sq.m 1 2.7 2.65 7.16
Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along A/(2-3) sq.m 1 2.7 2.65 7.16


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along C/(1-2) sq.m 1 2.7 2.65 7.16


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along C/(2-3) sq.m 1 2.7 2.65 7.16


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along 1/(A-B) sq.m 1 2.76 2.65 7.31


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Prepared By: Approved By: Checked By:


Estimation/Toilet Block/15

Estimation Sheet
S.N Description Units NumbeLength Breadth Height Quantity Remarks
Along 1/(B-C) sq.m 1 3.7 2.65 9.81
Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along 3/(A-B) sq.m 1 4.2 2.65 11.13


Deductions
Window W sq.m 1 1.5 0.8 -0.6 product/2

Along 3/(B-C) sq.m 1 3.7 2.65 9.81


Deductions
Window W sq.m 1 1.5 0.8 -0.6 product/2

Along A-A/1-1 sq.m 1 2.8 3 8.4


Along B-B/1-1 sq.m 1 0.5 3 1.5
Sub Total 70.6 cu.m

b Internal Wall
Along A'/(2-3) sq.m 2 1.5 2.5 7.5
Along A''/(1-2) sq.m 2 2 2.875 11.5
Along A''/(2-3) sq.m 2 1.5 2.5 7.5
Along A'''/(1-2) sq.m 2 1.6 2.875 9.2
Deduction
Door D1 sq.m 2 1.2 2.65 -6.36 Deduct full
Add for Jambs and Sills sq.m 2 7.7 0.11
Along B/(1-2) sq.m 2 2.7 2.65 14.31
Along B/(2-3) sq.m 2 2.7 2.65 14.31
Deductions
Door D1 sq.m 2 1.2 2.65 -6.36 Deduct full
Add for Jambs and Sills sq.m 2 7.7 0.11
Along B'/(1-3) sq.m 2 4.4 2.5 22
Deductions
Door D2 sq.m 8 0.75 2.1 -6.3 product/2

Along 1'/(A-B) sq.m 2 4.47 2.875 25.7


Deduction
Door D1 sq.m 2 1.2 2.65 -6.36 Deduct full
Add for Jambs and Sills sq.m 2 7.7 0.11
Along 2'/A-B sq.m 2 2.225 2.5 11.13
Deduction
Door D2 sq.m 4 0.75 2.1 -3.15 product/2

Along 1'/(B-C) sq.m 2 1.5 2.5 7.5


Along 1''/(B-C) sq.m 2 1.5 2.5 7.5
Along 2'/(B-C) sq.m 2 1.5 2.5 7.5
Along 2''/(B-C) sq.m 2 1.5 2.5 7.5

Plaster on Columns sq.m 1 1.2 2.875 3.45


sq.m 8 0.3 2.875 6.9

Sub Total 124.62 sq.m

Total 195.22 sq.m

c Ceiling
Slab sq.m 1 6.3 3.8 23.94
sq.m 1 6.53 5 32.65

Projections from slab (sides)


Along A, C sq.m 4 2.6 0.125 1.3
Along 1 sq.m 1 3.76 0.125 0.47
Along 3 sq.m 1 3.425 0.125 0.43
sq.m 1 3.575 0.125 0.45

Projection from Slab (top and bottom)


Along A, C sq.m 8 2 0.3 4.8
Along 1 sq.m 2 3.3 0.23 1.52
Along 3 sq.m 2 2.825 0.3 1.7
sq.m 2 2.975 0.3 1.79
Total 69.05 sq.m

10 Aluminium Works
Sliding window without Ventrilator: Supplying and fitting Aluminium sliding window without Ventrilator using section (black anodized or white
powder coated) of size 101mm X 45mm X 1.50 mm with 5 mm glass.
Ground Floor
Ventilation V sq.m 6 2 0.8 9.6
Window W sq.m 2 1.5 1.85 5.55
Total 15.15 sq.m

11 Wooden Works
Wooden door frames: Providing fabricating and erection of wooden door frames
Ground Floor
Door D2 cu.m 6 5.55 0.075 0.1 0.25
Door D1 cu.m 3 8.45 0.075 0.1 0.19

Prepared By: Approved By: Checked By:


Estimation/Toilet Block/16

Estimation Sheet
S.N Description Units NumbeLength Breadth Height Quantity Remarks
Total 0.44 cu.m

Wooden flush doors: Supplying, fabricating and erecting of wooden of wooden flush doors using wood of 38mm thickness with all necessary
materials and manpower (hinges, handles, locks,etc.)
Door D2 sq.m 6 0.75 2.1 9.45
Door D1 sq.m 3 1.2 2.1 7.56
Total 17.01 sq.m

12 Floor Finishing
Screeding works: Providing and laying, 50 mm thick screeding with 1:2:4 concrete mix on proper slope after scraping, cleaning and watering (which
in some case may require air blast or water blast method ) the old surface as per drawing, specification and instruction of engineer-in-charge, all
i complete.Rate shall be inclusive of all the preparation works for the job to be done and preparing sample for obtaining approval for the screeding
work.

Upto Plinth Level


Steps at entry sq.m 1 3.1 1.87 5.8
Ramp sq.m 1 4.323 1.4 6.05
Total 11.85 sq.m
Roof
Screeding on Roof surface sq.m 1 6.3 3.8 23.94
sq.m 1 6.53 5 32.65
Total 56.59 sq.m

ii Ceramic Tiles : Supplying and fixing of porcelaine tiles approved color and quality on wall and floor in 1:4 cement sand mortar by volume in case of
floor and 1:4 cement sand plaster in case of walls with 1:1 cement sand mortar with approved color and quality of material, laid using 2mm plastic
spacer at corners to achieve perfectly straight joints line filled with joint compound of matching shade.
Ground Floor
a 300 mm X 300 mm Anti-Skid Porcelaine Tiles on Floor
Ladies Toilet sq.m 1 5.77 3.77 21.75
Gents Toilet sq.m 1 4.47 3.74 16.72
Disabled Toilet sq.m 1 2.23 2.2 4.91
Entry Portion sq.m 1 2 2.17 4.34
Total 47.72 sq.m

b Glazed Porcelaine Tiles on wall


Ladies Toilet sq.m 1 19.08 1.5 28.62
sq.m 1 20.8 1.5 31.2
Deduction
Door sq.m 1 1.2 1.5 -1.8
Door D2 sq.m 4 1.5 1.5 -9

Gents Toilet sq.m 1 16.42 1.5 24.63


sq.m 1 13.65 1.5 20.48
Deduction
Door sq.m 1 1.2 1.5 -1.8
Door D2 sq.m 2 0.75 1.5 -2.25

Disabled Toilet sq.m 1 8.86 1.5 13.29


Deductions
Door D1 sq.m 1 1.2 1.5 -1.8

Entry Portion sq.m 1 8.34 1.5 12.51


Deduction
Door D1 sq.m 3 1.2 1.5 -5.4
Opening sq.m 1 1.8 1.5 -2.7
Total 105.98 sq.m

Granite Works: Providing and laying 16 mm thick pre-polished Granite stone of approved color and texture in flooring on floor, wash basin slabs,
13 etc. with average 30 mm thick of 1:3 cement and sand by volume underbed brought to proper level with polishing, edge polishing, curing, cleaning,
etc.
Ladies Toilet sq.m 1 5.84 0.6 3.5
Skirting sq.m 1 12.88 0.15 1.93

Gents Toilet sq.m 1 3.74 0.55 2.06


Skirting sq.m 1 8.58 0.15 1.29
Total 8.78 sq.m

14 Painting works
i Two coat of external paint with primer coat (Weather Guard)

Upto Plinth Level


Along A/(1-3) sq.m 1 4 0.45 1.8
Along C/(1-3) sq.m 1 4 0.45 1.8
Along 1/(A-C) sq.m 1 3.3 0.45 1.49
Along 3/(A-C) sq.m 1 5.8 0.45 2.61
Ramp Sides sq.m 1 4.3 0.45 0.97 product/2
Total 8.67 sq.m
Ground Floor
Main Wall
Along A/(1-2) sq.m 1 2.7 2.65 7.16
Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Prepared By: Approved By: Checked By:


Estimation/Toilet Block/17

Estimation Sheet
S.N Description Units NumbeLength Breadth Height Quantity Remarks
Along A/(2-3) sq.m 1 2.7 2.65 7.16
Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along C/(1-2) sq.m 1 2.7 2.65 7.16


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along C/(2-3) sq.m 1 2.7 2.65 7.16


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along 1/(A-B) sq.m 1 2.76 2.65 7.31


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along 1/(B-C) sq.m 1 3.7 2.65 9.81


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along 3/(A-B) sq.m 1 4.2 2.65 11.13


Deductions
Window W sq.m 1 1.5 0.8 -0.6 product/2

Along 3/(B-C) sq.m 1 3.7 2.65 9.81


Deductions
Window W sq.m 1 1.5 0.8 -0.6 product/2

Along A-A/1-1 sq.m 1 2.8 3 8.4


Along B-B/1-1 sq.m 1 0.5 3 1.5

Projections from Slab


Projections from slab (sides)
Along A, C sq.m 4 2.6 0.125 1.3
Along 1 sq.m 1 3.76 0.125 0.47
Along 3 sq.m 1 3.425 0.125 0.43
sq.m 1 3.575 0.125 0.45

Projection from Slab (top and bottom)


Along A, C sq.m 8 2 0.3 4.8
Along 1 sq.m 2 3.3 0.23 1.52
Along 3 sq.m 2 2.825 0.3 1.7
sq.m 2 2.975 0.3 1.79

Deductions
Stone Cladding sq.m 1 -47.45

Total 35.61 sq.m


Roof
Parapet Wall sq.m 2 30.667 0.5 30.67
Total 30.67 sq.m

ii Two coat of acrylic emulsion paint with primer coat (Distemper)

Ground Floor
Main Wall
Along A/(1-2) sq.m 1 2.7 2.65 7.16
Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along A/(2-3) sq.m 1 2.7 2.65 7.16


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along C/(1-2) sq.m 1 2.7 2.65 7.16


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along C/(2-3) sq.m 1 2.7 2.65 7.16


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along 1/(A-B) sq.m 1 2.76 2.65 7.31


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along 1/(B-C) sq.m 1 3.7 2.65 9.81


Deductions
Ventilation V sq.m 1 2 0.8 -0.8 product/2

Along 3/(A-B) sq.m 1 4.2 2.65 11.13


Deductions
Window W sq.m 1 1.5 0.8 -0.6 product/2

Prepared By: Approved By: Checked By:


Estimation/Toilet Block/18

Estimation Sheet
S.N Description Units NumbeLength Breadth Height Quantity Remarks
Along 3/(B-C) sq.m 1 3.7 2.65 9.81
Deductions
Window W sq.m 1 1.5 0.8 -0.6 product/2

Along A-A/1-1 sq.m 1 2.8 3 8.4


Along B-B/1-1 sq.m 1 0.5 3 1.5

Internal Wall
Along A'/(2-3) sq.m 2 1.5 2.5 7.5
Along A''/(1-2) sq.m 2 2 2.875 11.5
Along A''/(2-3) sq.m 2 1.5 2.5 7.5
Along A'''/(1-2) sq.m 2 1.6 2.875 9.2
Deduction
Door D1 sq.m 2 1.2 2.65 -6.36 Deduct full
Add for Jambs and Sills sq.m 2 7.7 0.11
Along B/(1-2) sq.m 2 2.7 2.65 14.31
Deductions
Door D1 sq.m 2 1.2 2.65 -6.36 Deduct full
Add for Jambs and Sills sq.m 2 7.7 0.11

Along B/(2-3) sq.m 2 2.7 2.65 14.31

Along B'/(1-3) sq.m 2 4.4 2.5 22


Deductions
Door D2 sq.m 8 0.75 2.1 -6.3 product/2

Along 1'/(A-B) sq.m 2 4.47 2.875 25.7


Deduction
Door D1 sq.m 2 1.2 2.65 -6.36 Deduct full
Add for Jambs and Sills sq.m 2 7.7 0.11
Along 2'/A-B sq.m 2 2.225 2.5 11.13
Deduction
Door D2 sq.m 4 0.75 2.1 -3.15 product/2

Along 1'/(B-C) sq.m 2 1.5 2.5 7.5


Along 1''/(B-C) sq.m 2 1.5 2.5 7.5
Along 2'/(B-C) sq.m 2 1.5 2.5 7.5
Along 2''/(B-C) sq.m 2 1.5 2.5 7.5

Ceiling
Slab cu.m 1 6.53 5 0.125 4.08
cu.m 1 6.3 3.8 0.125 2.99
Total 202.29 sq.m

iii Enamel Paint: Providing and applying, inside and outside painting with approved color and paints with two coats of primer to give uniform color
after rendering surface clean with sandpapering
Ground Floor
Grill Work for Windows
Ventilation V sq.m 6 2 0.8 9.6
Window W sq.m 2 1.5 0.8 2.4

Door Frames
Door D2 sq.m 6 5.55 0.25 8.33
Door D1 sq.m 3 8.45 0.25 6.34
Total 14.67 sq.m

iv Chopra Polish
Ground Floor
Door D2 sq.m 6 0.75 2.1 9.45
Door D1 sq.m 3 1.2 2.1 7.56
Total 17.01 sq.m
15 Metal Works
Stainless Steel

Railing: Providing and fitting stainless steel pipe railling in verandah and staircase with 50 mm dia stainless steel pipe handrail 2 row 25 mm dia
stainless steel pipe in between handrail and floor and 50 mm dia stainless stell pipe for vertical post including welding, cutting, drilling, fixing,
joining, tighening, polishing as per specification and instruction of engineer-in-charge all complete
Upto Plinth Level
Ramp Sides Rm 1 4.323 4.32
Total 4.32 Rm
Roof
Railing on roof edges Rm 1 18.42 18.42
Total 18.42 Rm

Grillwork for windows : Supplying, fabricating and erecing metal grill with frame of 4.5mm x 20mm metal strip with 12mm x 12mm solid square
rod with a single coat of redoxide paint. All work to be completed as per drawing, specification and instruction of engineer-in-charge.

Ground Floor
Grillwork for windows
Ventilation V sq.m 6 2 0.8 9.6
Window W sq.m 2 1.5 1.85 5.55
Total 15.15 sq.m

Prepared By: Approved By: Checked By:


Estimation/Toilet Block/19

Estimation Sheet
S.N Description Units NumbeLength Breadth Height Quantity Remarks

Stone Cladding: Providing and laying stone of approved quality and size in underbed of 1:4 cement sand mortar by volume with proper joint packing
16
is proposed line and level including filling of joints with cement sand mortar and edge restraining wherever necessary and cleaning the stone surface
after completion of task.
Along A sq.m 1 2.6 3.95 10.27
Along C sq.m 1 2.3 3.95 9.09
Along 1 sq.m 1 4.5 3.95 17.78
sq.m 1 3.2 0.35 1.12 facia
sloped portion along ramp
sq.m 1 0.513 3.53 1.81
on face
sq.m 1 0.5 3.95 1.98
Deductions
Ventilation V1 sq.m 2 2 0.8 -3.2
Opening sq.m 1 1.97 2.65 -5.22

Along 3 sq.m 1 3 3.95 11.85

Steps at entry sq.m 1 13.11 0.15 1.97

Total 47.45 sq.m

Prepared By: Approved By: Checked By:


Estimation/Toilet Block/Rebar

Estimation Sheet
No. of Length of Development Total Length Unit Total
S.No Description Dia (mm) No. of Rebar Lap length weight Remarks
section single rebar length (M) quantity(kg)
(kg/m)

Steel Reinforcement: Reinforcement for RCC work including supplying, delivering and storing of various diameters as required at site of work transportation, unloading at site, straightening, cutting,
1 bending, placing, in position at any level, binding in position of steel reinforcements Fe-550D including cost of binding wire, labour, scaffolding, transportation to and from stores etc complete all

Upto Plinth
Column 1 Volume of Concrete (cu.m)= 1.34 7850 420.76 4% of Concrete
Volume
Footing Beam 1 Volume of Concrete (cu.m)= 2.76 7850 649.98 3% of Concrete
Volume
Plinth Beam 1 Volume of Concrete (cu.m)= 2.76 7850 649.98 3% of Concrete
Volume
Footing 1 Volume of Concrete (cu.m)= 7.65 7850 780.6825 1.3% of Concrete
Volume
Total 2501.4025 kg

Ground Floor
Column 1 Volume of Concrete (cu.m)= 2.33 7850 731.62 4% of Concrete
Volume
Beam 1 Volume of Concrete (cu.m)= 2.07 7850 487.485 3% of Concrete
Volume
Slab 1 Volume of Concrete (cu.m)= 7.68 7850 783.744 1.3% of Concrete
Volume
Sill and Lintel 1 Volume of Concrete (cu.m)= 13.2 7850 1347.06 1.3% of Concrete
Volume
Total 3349.909 kg

Prepared By: Approved By: Checked By:


Estimation/Toilet Block/Ground Floor

Estimation Sheet
S.No. Description Unit No. Length Breadth Height Quantity Remarks

1 PCC for RCC


Nominal Mix: Providing and laying concrete for reinforced concrete works in foundations/substructure. Grade slab, paving, drains,
under floors, etc at any level below finished floor level, any shape, position or thickness etc complete, all complete.
Nominal Mix (1:1.5:3)

Prepared By; Approved By: Checked By:


Estimation/Toilet Block/Ground Floor

Estimation Sheet
S.No. Description Unit No. Length Breadth Height Quantity Remarks
Formwork : Providing and fixing form work with approved quality laminated plywood of required thickness and smooth surface for
foundation, columns, beams, slabs, staircases, etc. for all heights and at all locations including chamfers, splays, keys, wedges, metal
props, rails, bracings, brackets, cutting holes if specified for pipes etc. providing and applying approved form oil on all surfaces of
formwork.
2

Prepared By; Approved By: Checked By:


Estimation/Toilet Block/Ground Floor

Estimation Sheet
S.No. Description Unit No. Length Breadth Height Quantity Remarks

Brick work: Providing brick work in cement mortar in walls, chambers, etc. in thickness mentioned below at all heights, places and
position above plinth including raking out joints, curing, scaffolding, etc.
3
230 mm thickness or higher: 230 mm thickness or higher in 1:6 (Cement : Sand) mortar. (Class A Brick)
i

ii

Prepared By; Approved By: Checked By:


Estimation/Toilet Block/Ground Floor

Estimation Sheet
S.No. Description Unit No. Length Breadth Height Quantity Remarks

Plaster works: Providing and applying plaster works in cement sand mortar for all surfaces of brick/ block/ RCC walls and finishing the
same (smooth or broom) in correct line, level and plumb, making of edges, corners, sill, jambd, soffits, grooves etc. with all necessary
4 surfaces preparation, scaffolding, hacking of concrete surface to receive plaster, waterig, curing, cleaning, etc.
i 20 mm thick in 1:6 (cement : sand) mortar (outside)

Prepared By; Approved By: Checked By:


Estimation/Toilet Block/Ground Floor

Estimation Sheet
S.No. Description Unit No. Length Breadth Height Quantity Remarks

7 Floor Finishing

Prepared By; Approved By: Checked By:


Estimation/Toilet Block/Ground Floor

Estimation Sheet
S.No. Description Unit No. Length Breadth Height Quantity Remarks

9 Painting works
i Two coat of external paint with primer coat (Weather Guard)

Prepared By; Approved By: Checked By:


Estimation/Toilet Block/Ground Floor

Estimation Sheet
S.No. Description Unit No. Length Breadth Height Quantity Remarks

Prepared By; Approved By: Checked By:


Estimation/Toilet Block/Ground Floor

Estimation Sheet
S.No. Description Unit No. Length Breadth Height Quantity Remarks

Prepared By; Approved By: Checked By:


Estimation/Toilet Block/Ground Floor

Estimation Sheet
S.No. Description Unit No. Length Breadth Height Quantity Remarks

Prepared By; Approved By: Checked By:


Estimation/Toilet Block/Roof

Estimation Sheet
S.No. Description Unit No. Length Breadth Height Quantity Remarks
1 PCC Nominal Mix (1:1.5:3

Brick work: Providing brick work in cement mortar in walls, chambers, etc. in thickness mentioned below at all
2 heights, places and position above plinth including raking out joints, curing, scaffolding, etc.

Plaster works: Providing and applying plaster works in cement sand mortar for all surfaces of brick/ block/ RCC
walls and finishing the same (smooth or broom) in correct line, level and plumb, making of edges, corners, sill,
jambd, soffits, grooves etc. with all necessary surfaces preparation, scaffolding, hacking of concrete surface to
3 receive plaster, waterig, curing, cleaning, etc.
i 20 mm thick in 1:6 (cement : sand) mortar (outside)

4 Floor Finishing

5 Painting works
i Two coat of external paint with primer coat (Weather Guard)

6 Metal Works
Stainless Steel

Railing: Providing and fitting stainless steel pipe railling in verandah and staircase with 50 mm dia stainless steel
pipe handrail 2 row 25 mm dia stainless steel pipe in between handrail and floor and 50 mm dia stainless stell pipe
for vertical post including welding, cutting, drilling, fixing, joining, tighening, polishing as per specification and
instruction of engineer-in-charge all complete

Prepared By: Approved By: Checked By:


beam depth 0.35
floor height 3
slab depth 0.125
fl ht- beam depth 2.65 bht
fl ht- slab depth 2.875 ht

length breadth
column 0.3 0.3

footing Footing 1 length 2.6 f1l


Footing 2 length 1.7 f2l
footing depth 1.524 fd
length breadth
Plinth Beam 0.23 0.3 pbl pbd
Footing Beam 0.23 0.3 fbl fbd