The document outlines an environmental monitoring plan for both the construction and operational phases of a project. During construction, ambient air quality, ambient noise, and groundwater will be monitored quarterly at a recurring cost of 87,000 rupees per year. During operations, those three parameters will continue to be monitored quarterly along with generator noise and STP treated water quality at a higher recurring cost of 1,21,000 rupees per year.
A separate table outlines the daily water requirement and storage calculations for the proposed project based on population and area. The total daily water demand is estimated at 12,88,320 liters.
The document outlines an environmental monitoring plan for both the construction and operational phases of a project. During construction, ambient air quality, ambient noise, and groundwater will be monitored quarterly at a recurring cost of 87,000 rupees per year. During operations, those three parameters will continue to be monitored quarterly along with generator noise and STP treated water quality at a higher recurring cost of 1,21,000 rupees per year.
A separate table outlines the daily water requirement and storage calculations for the proposed project based on population and area. The total daily water demand is estimated at 12,88,320 liters.
The document outlines an environmental monitoring plan for both the construction and operational phases of a project. During construction, ambient air quality, ambient noise, and groundwater will be monitored quarterly at a recurring cost of 87,000 rupees per year. During operations, those three parameters will continue to be monitored quarterly along with generator noise and STP treated water quality at a higher recurring cost of 1,21,000 rupees per year.
A separate table outlines the daily water requirement and storage calculations for the proposed project based on population and area. The total daily water demand is estimated at 12,88,320 liters.
Water grease, BOD, COD, TSS, Ammonical, Nitrogen as N, Disolved Phosphate, Nitrate, Nitrogen
5 Groundwater Biochemical, Quarterly 26,000
physiochemical
TOTAL 1,21,000
TABLE -: Environmental Monitoring Plan
TABLE-: Daily Water Requirement and Storage for Proposed
ISBT
DESCRIP COVER POPULA POPULA BASISOFT TOTALWA BASIS OF WATERREQ
TION ED TION TION OTAL TER WATER UIRED (in AREAI BASIS WATER REQUIRE REQUIRED Liters) NSQ REQUIRE MENT (in DOME FLUSH DO FLUS MTR MENT Liters) STIC ING MES HIN TIC G @% @% Ltrs Ltrs A. FORTERMINALPASSENGERPARKING DAILY NBC 78000 15 lts/ 1170000. 60 40 7020 4680 WATER ___ clause per 00 00.0 00.0 REQUIRE 4.1.2 son 0 0 MENT and4.1.3 B. FORTERMINAL(OFFICESANDSTAFF) DAILY 5400 1person 590 45 lts/ 26550.00 60 40 1593 1062 WATER /10sqm per 0.00 0.00 REQUIRE son MENT C. FORISBTCOMMERCIALRETAIL&OFFICES DAILY 10575 1person 1077 25 lts/ 26937.00 60 40 1616 1077 WATER /10sqm per 2.00 5.00 REQUIRE son MENT FOR RESTAURANTS DAILY 4381.0 1person 926 70 lts/ 64834.00 60 40 3890 2593 WATER 0 /3sqm per 0.00 3.00 REQUIRE son MENT TOTAL SAY 12,88,320 7,72, 5,15, DAILY 992 328 WATER DEMAN D