DESIGN CHECK FOR PLUNGE IN COLUMN

Project : Belfield tunnel


Location : M&E4
Date : 4/13/2020
Description : 2 LEVELS

Design of Plunging Column :


Inclination Of column= 90
Ultimate Load to Column,Px = 15322 kN
Height of Columnt = 9500 mm
Design Strength of Steel= 275 N/mm2

Section Properties:

Section : U.B 356x406x634kg/m Iyy= 982000000 mm4 ry= 110.35207 mm


d= 474.2 mm Izz= 2750000000 mm4 ry= 184.66776 mm
b= 424.1 mm Zyy= 4640000 mm3
tw= 47.62 mm Zzz= 11600000 mm3
tf= 77.09 mm Syy= 6310000 mm3
r= 15.2 mm Szz= 2940000 mm3
Ag= 80640 mm2
Section Classification :
ε= 1
Flange= 5.501362 b/tf Flange is Plastic
Web= 9.9580008 d/tw Web is Plastic

Effective Length of Struct= 9500 mm

Slenderness about Y ,λx= 86.0881 Pc = 169 N/mm2 BS5950 Table 27 (b)


Slenderness about Z ,λy= 51.443738 Pc = 236 N/mm2 BS5950 Table 27 (b)

Ultimate axial Capacity,Pc= 13628.16 kN Pc<Px ULS: 1.12

Output : Fail!!! Revise section