Professional Documents
Culture Documents
Thanh Lanh Lake - Suoi Tien - Thac Ba Lake Eco-Tourism Area
Thanh Lanh Lake - Suoi Tien - Thac Ba Lake Eco-Tourism Area
Planning explanation 1/500 Thanh Lanh lake eco-tourism area- Suoi
Tien- Thac Ba - Hosoxaydung.com please send to
readers. When planning projects need to contact us at Hotline:
0904.87.33.88 for advice. The following is the explanation of the plan:
>>>>>> See also: Sample civil and industrial bids
>>>>>> See also: Notes when making bids
>>>>>> See also: Quotations make bids
HANOI July 2006
TABLE OF CONTENTS
INTRODUCTION ABOUT THE INVESTOR
A - DOCUMENT PROCESS FOR APPROVAL OF THE PROJECT.
B - PROJECT NOTES:
CHAPTER 1: Introduction
1.1 - Location, location, investor
1.2 - Bases
1.3 - The need for construction investment
1.4 - Objectives and tasks of the project
1.5 - Investment form, size of manpower
CHAPTER 2: Natural conditions and current situation
Design research area
2.1 - Research location and scope
2.2 - Natural characteristics
2.3 - Current status of land use
2.4 - Population situation
2.5 - Current status of architectural works
2.6 - Current situation of technical infrastructure
2.7 - Relevant investment preparation projects
CHAPTER 3: Landscape architecture planning
3.1 - Properties
3.2 - Viewpoints and principles of planning
3.3 - The main indicators of the project
3.4 - Organizational structure of planning
3.5 - Land use planning
3.6 - Organize architectural planning space
3.7 - Green tree layout.
3.8 - Pets in nature museum.
3.9 - Volume and funding of technical infrastructure
construction and architectural works.
CHAPTER 4: Planning of technical infrastructure system
4.1 - Traffic planning
4.2 - Planning of water supply leveling
4.3 - Planning of electricity supply, lightning protection, fire
protection, communication
4.3 - Planning on environmental sanitation impact assessment
CHAPTER 5: Environmental impact assessment
5.1 - Basis for making environmental impact assessment
report
5.2 - Factors affecting environmental impacts
5.3 - Solutions to minimize environmental impact
5.4 - Research solutions limiting environmental impacts
when water supply and drainage systems are put into
operation
5.5 - Solve the problem of waste treatment Exam
planning is put into operation
5.6 - Solid waste collection solutions
5.7 - Evaluation of project effectiveness
CHAPTER 6: Analysis of investment efficiency of the
project
6.1 - Basis for calculation
6.2 - Analysis of investment efficiency of the project
CHAPTER 7: Capital sources and total investment
7.1 - Capital source and total investment
7.2 - Total investment
CHAPTER 8 : Planning and construction
management mechanism
- implementation progress
8.1 - Management of planning and construction
8.2 - Implementation schedule
CHAPTER 9: Conclusions and recommendations
9.1 - Conclusion.
9.2 - Recommendations.
C- LEGAL DOCUMENTS AND DRAWINGS
INTRODUCTION ABOUT THE INVESTOR
first . Investor's name: Nam Tam Dao Joint Stock Company
Foreign trade name: SOUTH TAM DAO JOINT STOCK COMPANY
Abbreviated name: STAM DAO, JSC
Business registration: No. 1903000114 dated November 16, 2004 at
Business Registration Office - Department of Planning and Investment of
Vinh Phuc Province.
Charter capital: VND 17.5 billion
Project's name: Eco-tourism area at Thanh Lanh lake - Suoi Tien -
Thac Ba
2 . Investment form of the enterprise: Nam Tam Dao Joint Stock
Company with own capital, and other mobilized capital sources, borrowed
capital, associated capital, associated capital, capital collected from the
division of land for sale. ancient Vietnamese villas, capital for leasing
technical infrastructure, actively implementing a number of items. A
number of items will call for secondary investors being domestic and
foreign individuals to participate. Investors will buy or rent infrastructure
to directly invest in optional items in the form of 100% capital, fully
autonomous, independent in business management and accounting. The
investor will be the investment management agency according to the
planning approved by the competent authorities.
3. Business:
- Services of recreation, eco-tourism, motels, houses for rent, coffee
refreshments, mud baths, saunas, beauty salons, fishing, boat racing,
mountaineering, waterfalls, stream bathing ; Business travel services
domestic and international; Transporting passengers and goods
services; Afforestation; Manufacturing ornamental plants; Aquaculture
and wildlife farming; Planting medicinal herbs; Buying and selling
agricultural, forestry and aquatic products.
- Real estate business; Vocational training; Health care club
- Leveling works; Construction of civil, industrial, transport, water and
electricity projects; Mining
- Designing, manufacturing, installing and transferring technology of
production lines.
4. Legal representative of the company:
Full name: NGUYEN TRUNG CHINH (male) Phone: 7.912522
Graduated from Hanoi University of Technology, Hanoi Law University -
Master of Science and Technology Management.
Born:
April 3 , 1954 Ethnicity: Kinh Nationality: Vietnamese
Identity card number: 010427258
Date of issue: October 14 , 1999 Place of
issue: Hanoi Police
Registered place of permanent residence :
No. 4, Group 25, Cong Vi Ward, Ba Dinh District, Hanoi
Current address: 471 Doi Can Street, Cong Vi Ward, Ba Dinh
District, Hanoi
CHAPTER 1:
HEADING
1.1 Location, location, investor:
Project's name: Eco-tourism area at Thanh Lanh lake - Suoi
Tien - Thac Ba.
1.3 Necessity of construction investment:
Vinh Phuc is a province in the Northern midland and mountainous region,
60km north of Hanoi capital, the province's economy in recent years has
stabilized. With the economic growth of the whole country, Vinh Phuc
province is increasingly developing in all aspects, socio-economic and
social. Entertainment and recreation of the people.
Located in the Northern tourism region, nature has created for Vinh Phuc
many interesting landscapes such as Tam Dao, Tay Thien, Dai Lai Lake…
many historical relics of the province have been ranked by the Ministry of
Culture and Information such as Binh Son tower, famous landscapes Tay
Thien, Dinh Phu My, Huong Canh, Tho Tang… The number of tourists
visiting Vinh Phuc increases every year.
The revenue from entertainment and cultural tourism services increased,
leading to the development of cultural and sports entertainment, tourists
coming to Vinh Phuc in addition to sightseeing activities also needed.
about relaxing, relaxing and enjoying art, folklore, culinary culture and
other special cultural activities such as village tourism, traditional festivals
to learn about life of indigenous people. Recreational, cultural and sport
activities are one of the essential cultural forms of Vinh Phuc, it ensures
environmental protection in combination with capital-raising service
activities. invest in the protection of the environment, the protection of
the industry, aquatic resources and precious plants and animals. The
development of investment in aquaculture, development and protection of
forest ecosystems, landscape improvement has brought long-term effects
to the people of Vinh Phuc in particular and the people of the country in
general, creating jobs for many workers. The strategy of investing in the
eco-tourism area system of Vinh Phuc Province has been contributing to
improving and improving the quality of life for people in the coming years.
The goal of building a new tourist area based on the forms of
entertainment, cultural, sport and ecotourism will not only contribute to
improving infrastructure and available cultural activities of Vinh Phuc but
also have a high environmental protection and educational effect, in
accordance with the International Convention on the protection of the
landscape and environment of natural heritage areas to be preserved.
With a markedly increasing standard of living, the creation of architectural
complexes of eco-entertainment and recreation areas with high standards
of service is becoming increasingly urgent. The populations of eco-tourism
areas have more and more clear criteria that are convenient and have
conditions to meet the needs of customers in the field of culture. Cultural
activities associated with ecology are the best way to deal with the needs
of tourism activities on a unit of area that is blessed with geographical
location, history of formation and available environmental landscape. , is
the right direction of developed countries in the world on development
planning of landscape protection.
The model of culture, entertainment, sport and ecotourism is a basic
solution of countries with civilized and modern life, which needs to be
preserved and protected of the natural landscape and put it into
combination to serve people. . Using harmonious traditional architectural
and technical solutions to absorb modern architectural technologies, new
perspectives on life, cultural and spiritual entertainment create a common
development of many aspects of the area. Create responsible,
knowledgeable communities that follow the modern civilized lifestyle
combined with the protection of nature.
1.4 Objectives and tasks of the project
1.4.1. Target:
Invest in constructing technical infrastructure of ecological potential
area into a center of cultural, entertainment and recreation activities of
regional stature in order to meet the demand for entertainment and
activities High artistic sport. At the same time, it contributes a beautiful
highlight to the tourist land of Vinh Phuc province.
1.4.2. Tasks of the project:
% of
Need amount of garbage
payment
5-5. Solid waste collection solutions
5-5-1. Collection solutions:
Collection of solid waste in residential areas: collection of all types
of waste by pushcarts of each house, each lane, after which the waste is
collected and transported to the garbage disposal site and sorted on
Sorting conveyor belt for processing.
In short, in the short and long-term stage in Thanh Lanh tourist
area, the method of collecting waste according to the method of placing
garbage containers at hotel guesthouses and collecting garbage by
handcart is reached. Gather garbage in residential areas, then the
environmental company will collect trash in 24 hours a day is reasonable
and better.
5-5-2 Collection model and limit the scope of the project.
Garbage
line
Garbage Collecting
solid waste
service and
disposal
transporting
Domestic
waste
5-6. The recommendations
In Thanh Lanh Lake eco-tourism area, in order to ensure a sustainable
environment that does not pollute the environment, in the beginning,
there should be specific sanctions for environmental protection, such as
promulgating legal documents to concretize or guide the implementation
of the contents inscribed in the law, especially specific measures to
implement environmental quality standards prescribed by the State.
In the field of waste management, the stage of identifying waste
collection and transportation routes plays a very important role, these
stages involve equipment and means of transporting garbage from small
collection points to collection points. take garbage from larger garbage
trucks to transport to the general waste disposal area of the whole
area. Therefore, it is necessary to specify the collection time in the area,
collection locations, collection routes, collection facilities and modes of
waste transportation, including manpower, to perform each of the above
stages.
According to the experience of advanced countries, the waste
classification at the waste treatment area is very expensive, so it is
necessary to classify the waste right from the waste consumers by putting
all kinds of waste into different color garbage bags such as: bags organic
waste, scrap bags: plastic, rubber and mixed garbage bags (Other types
except for the two above bags). If the above-mentioned waste sorting
process is done, it will be greatly simplified, reducing the cost of
treatment for 1 m3 of waste.
5-7. Evaluate the effectiveness of the project:
When the system of water supply, drainage and environmental sanitation
came into operation, it brought great efficiency to the planning
area. When going into operation, environmental issues in the area will be
thoroughly solved. This will have a good effect on the surrounding
environment. The health of the resident community in the area is
guaranteed. If wastewater and waste are not collected in time, they will
pollute the water and air environment of the area, especially noticeable as
the unclean smell of sewage will make the living environment affected.
serious impacts as well as urban beauty. As the environment polluted with
diseases likely to spread through the respiratory tract, eating and drinking
will increase, the cost of prevention and treatment of diseases will
increase, even higher than the construction and operation costs.
operating water supply, drainage and environmental sanitation
systems. Those are the great social effects that the project brings. In
summary, the construction of water supply, drainage and sanitation
systems is an indispensable thing that brings about socio-economic
benefits.
Above is the planning process of 1/500 planning project. You need
advice to contact the hotline: 0904.87.33.88. Or refer to the
article investment project planning process