Indonesia is rich in natural resources, one of which is geothermal potential. Has
identified 331 point which consisted of a resource of 11 073 MW and a reserve of 17,506 MW spread across 30 Provinces. Dieng is located in Central Java province is one of the project sites geothermal electricity (PLTP) Geo Dipa Energi, the total potential energy around Dieng is estimated at 400 MW. Currently, PT Geo Dipa Energi successfully operate the project Dieng Unit 1 with a capacity of 60 MW. To take advantage of geothermal energy, can be done by converting geothermal energy into electrical energy. To find the conversion process can learn the system start-up at power plants. Start-up process is very important as it can minimize the damage to the plant components or shorted electrical current. To minimize the occurrence of things that can cause damage to the power plant, then learn the system start-up into one solution.