Professional Documents
Culture Documents
Final Report New
Final Report New
Final Report New
CHAPTER
INTRODUCTION
The purpose of this chapter is to provide an introduction to the
company profile and also define basic terminology used in our system
Company Profile.
Scope of System.
quality, user friendly and result oriented products and services. The
name and business strength that has been earned by our organization
today, is due to the professionally equipped and able staff, who have a
About Services:-
available
applications.
Similarly all the different types of report and process detail are
Misplacing of document.
This system is partially manual. The below are main problems with
manual system.
of the computer.
duplicates.
time.
Company.
for MIS.
transaction.
for year.
Scope is nothing but the contents which we include in the project. The
Project Management.
Supplier Management.
Material Management.
Access rights.
Reports.
Service Management.
Voucher Management.
Hardware Specifications
LAN Connection.
Software Specifications
Operating System:
XP or above
Front End:
Eclipse,
Back End:
MySQL 5.1
Server:
This chapter gives you an idea about the project which I have
developed leading to proposing a solution for the same from our side.
User requirements we get from our client so it’s totally based on client
need.
Proposed System.
Objective of System.
User Requirements.
Completely Automated.
Time saving.
work will be
administrative level.
specifications.
and understand.
Security of information
Time saving.
easy to understand.
dialog box.
asset.
Use-Case Diagram.
Class Diagram.
Activity Diagram.
Sequence Diagram.
Component Diagram.
Deployment Diagram.
E-R Diagram.
Table Design.
to use.
people.
The system should guide the user with prompt messaging for
concurrent activities;
the workflow;
(final state).
organized along two axes: the horizontal axis shows the elements that
are involved in the interaction, and the vertical axis represents time
proceeding down the page. The elements on the horizontal axis many
initiate this activity with the help of graphical user interface. Database
server and presentation view to help of Browser fetch the user &
server and presentation view to help of Browser fetch the user &
component diagram.
manager.
machine.
each project.
requisition.
record.
Input Screens
Reports
Description: It will display that the user is logging into the system.
The user will select user type i.e. admin and enter his login details.
Description: It will display the Home page. This is also a dash board.
Description: In this page the administrator adds the user and their
Description: Admin and User can add update delete supplier details
from database.
database.
database
Description: This form show detail about material receives entry and
attendance.
Masters
Enquiry
Reports
Admin
Reports:
and it can be generated with the help of the system. Reports like:
Customer Details
Enquiry By Status
Enquiry By Region
Enquiry By Attended By
Booking Details
2.3. PROTOTYPING
Technique.
QUESTIONNAIRE
INTERVIEWS
OBSERVATION
RECORD VIEW
QUESTIONNAIRE
INTERVIEWS
groups.
under study.
problem in advance.
OBSERVATION
operation.
capture data and complete analysis. The prototype was prepared and
various reports that could be produced from the system were shown to
the owner.
3.10 REPORTS
Design
Coding
Real Estate Management System 1
Testing
Implementation
Figure: Stages of Software Development Life Cycle
Analysis
Design
Real Estate Management System 1
As per user requirements the Databases and the User
Coding
Technology
(Development Platform).
Testing
is tested over here. If any errors are there then again solved in
Implementation
Options:
Masters
Enquiry
Reports
Admin
Masters:
1) Employee:-
the facility to New, Save, Edit, Delete, View and Close records in the
Master Menu.
NEW:-
will auto generates the Id for the new record. It was compulsory to
To save the record user must click on this option. It will give
UPDATE:
modified.
DELETE:
deleted and after confirming with the user the record is deleted from
the system.
VIEW:
The user can view the record on the screen just double clicking
Reports
Admin
In the Admin Menu Change the password and main Profile Rights.
Admin decides
Exit
Login Form
Main Form
Test Procedures
software doesn’t fail and runs according to its specifications and in the
way the end user expects. This can be done by various software testing
exercise the input and output domains of the program to uncover errors
Unit testing
Integration testing
Unit Testing
individual units have been tested in isolation and written to meet the
Unit testing is the test for the small units of code, e.g.
were exercised at least once. Unit testing is also done to test data the
errors associated with the interfacing. During this activity, unit tested
components were taken and a program structure were built per the
program testing is done and it is not easy to correct them at one go.
tested completely.
errors that black box testing cannot. During White box testing activity,
executed to check both true and false conditions. All loops were
and output only and not relate with the internal structure of the
Interface errors.
Performance errors.
validate all requirements. Alpha testing and beta testing are two types
Alpha testing
matter of fact, the end user conducts alpha test at the developer’s site.
But since I’m the developer and this system has been developed at the
company’s site itself, it is assumed that alpha test has been conducted
the end user was operating the software in my presence and I was
recording the errors that were occurring and other problems that were
Beta testing
Beta testing was also conducted at the company site by the end
user, but in my absence. Here the end user himself recorded all the
problems that he had encountered during testing the system and then
of a particular system.
item, writing error record and signaling the appropriate message to the
error message is popped to the user who is supposed to realize the fact
thoroughly for errors by testing it with data and the errors that are
raised during this can be clarified. The program may halt during an
unpredictable error.
IMPLEMENTATION PHASE
implemented module.
already existing old system and once the things are seemed to function
well and users also get acquainted with the system total shifting of
works on the new computer can be done. This decision was enormous,
as this would further subject the system to move live data and still
time. The system would be sound and fully proof system. Once the
user satisfied with the result the decision will be taken by the
During the phase there were errors regarding data entry to minor
printed outputs was rectified and finally the overall system quality was
Advantages
1. Multi-User Environment
Drawbacks
1. Multi-User Environment:
test bed from a main server. Data of tests conducted on any test
This feature is very useful on sites where there are more than
Depending on login of the user the user will have the rights to
Bibliography
1. Professional C# 2008
By Wrox Publication
5. MSDN Help
7. HTTP://WWW.LearnDOTNET.Com
8. HTTP://WWW.ni.Com