RFI ABSTRACT FOR MACHARA

Sr.No RFI No BOQ

1 JEPL/SR/MACHARAM/RFI/18-19/HWY/0172 2.23

2 JEPL/SR/MACHARAM/RFI/18-19/HWY/0173 2.22
RFI ABSTRACT FOR MACHARAM LVUP & SR - JEPL (27.05.2019)
Chainage
Description Side
From

Checking of Reinforcement Steel for for Drain Wall lift Banglore


RHS 77+050
Side

Checking of Pouring Concrete RCC M 25 for Drain Wall lift


RHS 77+050
Banglore Side
19)
Chainage RFI Raised Inspection Date RFI Closed Date
To Date & Time

28.05.2019
77+070 27.05.2019
12.00 PM

28.05.2019
77+070 27.05.2019
2.00 PM