RFI ABSTRACT FOR MACHARA

Sr.No RFI No BOQ

1 JEPL/SR/MACHARAM/RFI/18-19/HWY/0158 1.15

2 JEPL/SR/MACHARAM/RFI/18-19/HWY/0159 1.14

3 JEPL/SR/MACHARAM/RFI/18-19/HWY/0160 1.15

4 JEPL/SR/MACHARAM/RFI/18-19/HWY/0161 1.14
RFI ABSTRACT FOR MACHARAM LVUP & SR - JEPL (06.04.2019)
Chainage
Description Side
From

Checking of Reinforcement Steel for Retaining Wall IInd lift


RHS 76+920
-Hyderabad Side

Checking of Pouring Concrete RCC M 25 for Retaining Wall IInd


RHS 76+920
lift -Hyderabad Side

Checking of Reinforcement Steel for Retaining Wall Ist lift


RHS 76+880
-Hyderabad Side

Checking of Pouring Concrete RCC M 25 for Retaining Wall Ist lift


RHS 76+880
-Hyderabad Side

-40
19)
Chainage RFI Raised Inspection Date RFI Closed Date
To Date & Time

07.04.2019
76+960 06.04.2019
3.00 PM

07.04.2019
76+960 06.04.2019
4.30 PM

07.04.2019
76+920 06.04.2019
3.00 PM

07.04.2019
76+920 06.04.2019
4.30 PM