Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

P.

O Box 37405, Doha – Qatar


JOB CARD
Email:info@teamcoolqatar.com

Job # 3173 Report prepared by: ADITYA


Order ref# Date: 29-Aug-19
Cust ref# Others: CHILLER # 2

Serial # : 12 N 400270 Model: 30GX 267 Make: CARRIER

Customer/Company M H AL MUFTAH Contact Person MR. SUJITH


Contact # 974- Contact # 974-30023544
Building/Location AL SAAD SPORTS CLUB Email
Job Completed Yes
Address DOHA
Others N/A

SAFETY / RISK EVALUATION

Extra PPE required (please specify) High Avg Low


Ergonomic (lifting,position,constrains) X
N/A
Fall X
Confined Space X

Reason for call AMC SCHEDULE - AUGUST - 2019


Unit status on tech arrival RUNNING
Unit status on tech leaving CIRCUIT A : RUNNING CIRCUIT B: RUNNING

Details of work

CARRIED OUT MONTHLY SERVICING OF CHILLER # 2, CHECKED AND CLEANED ELECTRICAL PANEL WITH AIR BLOWER, CLEANED ALL THE CONDENSER
COILS WITH WATER PUMP, STARTED THE CHILLER, CHECKED ALL PARAMETERS, LEFT THE CHILLER CIRCUIT B IN RUNNING CONDITION.

Tech Name Date Job Start Job End


ADITYA 8:00 11:30
27-Aug-19
DASAN 8:00 11:30

Suggested repair /upgrade


1. CIRCUIT A 2 FAN MOTORS NOT WORKING NEED TO REPAIR AND REPLACE IMMEDIATELY
1. CIRCUIT B 2 FAN MOTORS NOT WORKING NEED TO REPAIR AND REPLACE IMMEDIATELY

Customer comments

Sup/Tech Name ADITYA Customer Name

Sign Sign

Date 29-Aug-19 Date


P.O Box 37405, Doha – Qatar JOB CARD
Email:info@teamcoolqatar.com

Job # 3173 Report prepared by: ADITYA


Order ref# Date: 29-Aug-19
Cust ref# Others: CHILLER # 2

Serial # : 12 N 400270 Model: 30GX 267 Make: CARRIER

Customer/Company M H AL MUFTAH Contact Person MR. SUJITH


Building / Location AL SAAD SPORTS CLUB Contact # 974-30023544

DESCRIPTION

CARRIED OUT THE MONTHLY SERVICING OF 1 NO' CHILLER

CLEANED ALL THE CONDENSER COILS WITH PRESSURE WATER PUMP

CHECKED AND CLEANED ELECTRICAL PANEL WITH AIR BLOWER

CHECKED ALL SENSORS AND SWITCHES

CHECKED COMPRESSORS AND CONDENSER FAN MOTORS

CHECKED THE REFRIGERANT LINE FOR ANY LEAKAGES

CHECKED ALL ELECTRICAL TERMINALS

STARTED THE CHILLER CHECKED ALL PARAMETERS

LEFT THE CHILLER CIRCUIT B IN RUNNING CONDITION

NOTE:

DISCHARGE PRESSURE OF BOTH CIRCUITS ARE VERY HIGH AND TEMPERATURE OF COMPRESSORS ARE VERY HIGH DUE TO 4 FAN MOTORS NOT
WORKING.

NEED TO REPAIR AND REPLACE THE FAN MOTORS ASAP SO AS TO PREVENT FURTHER ELECTRICAL AND MECHANICAL DAMAGE OF COMPRESSORS
P.O Box 37405, Doha – Qatar
Email:info@teamcoolqatar.com

Job # 3173 Report prepared by: ADITYA


Order ref# Date: 29-Aug-19
Cust ref# Others: CHILLER # 2

Serial # : 12 N 400270 Model: 30GX 267 Make: CARRIER

Customer/Company M H AL MUFTAH Contact Person MR. SUJITH


Building / Location AL SAAD SPORTS CLUB Contact # 974-30023544

CHECK LIST

TEMPERATURES / PRESSURES
COOLER ENTERING FLUID EWT 10.9 ˚C
COOLER LEAVING FLUID LWT 6.6 ˚C
CONTROL POINT CTPT 6.4˚C
CAPACITY CAP 70%
OUTSIDE AIR TEMPERATURE OAT 38 ˚C

CIRCUIT A CIRCUIT B CIRCUIT C


DISCHRGE PRESSURE 1654 KPA DIS PRSR 1778 KPA DS PRSR N/A
SUCTION PRESSURE 275 KPA SUC PRSR 275 KPA SUC PRSR N/A
OIL PRESSURE 1475 KPA OIL PRES 1613.5 KPA OIL PRES N/A
ECNOMISE PRESSURE 496 KPA ECN PRES 620 KPA ECN PRES N/A
SCT 66.2˚C SCT 64.2˚C SCT N/A
SST 3.5˚C SST 7.6 ˚C SST N/A
DGT 85.2˚C DGT 91.5˚C DGT N/A
SSH 18.5˚C SSH 26.5 ˚C SGT N/A
DSH N/A DSH N/A SUP N/A
ECT N/A ECT N/A ECT N/A
ESH N/A ESH N/A ESH N/A
CTP N/A CTP N/A CTP N/A
EXV N/A EXV N/A EXV N/A
ECO EXV N/A ECOEXV N/A ECO N/A

COMPRESSOR MOTOR CURRENT


L1 L2 L3
COMP A1,A2 157.7 A, 158.4 A N/A N/A
COMP B1 164.7 A N/A N/A
COMP C1 N/A N/A N/A
P.O Box 37405, Doha – Qatar
Email:info@teamcoolqatar.com

Job # 3173 Report prepared by: ADITYA


Order ref# Date: 29-Aug-19
Cust ref# Others: CHILLER # 2

Serial # : 12 N 400270 Model: 30GX 267 Make: CARRIER

Customer/Company M H AL MUFTAH Contact Person MR. SUJITH


Building / Location AL SAAD SPORTS CLUB Contact # 974-30023544

CONDENSOR FAN MOTOR

CKT A CKT B CKT C


FAN MOTOR 1 NORMAL NOT WORKING N/A
FAN MOTOR 2 NORMAL NOT WORKING N/A
FAN MOTOR 3 NORMAL NORMAL N/A
FAN MOTOR 4 NORMAL NORMAL N/A
FAN MOTOR 5 NOT WORKING
FAN MOTOR 6 NORMAL
FAN MOTOR 7 NORMAL
FAN MOTOR 8 NOT WORKING
FAN MOTOR 9
FAN MOTOR 10
FAN MOTOR 11
FAN MOTOR 12
FAN MOTOR 13
FAN MOTOR 14
FAN MOTOR 15

COMMENTS:
1. NEED TO REPAIR AND REPLACE 2 FAN MOTOR IN CKT A
2. NEED TO REPAIR AND REPLACE 2 FAN MOTOR IN CKT B

TECH NAME ADITYA CUSTOMER NAME

SIGN: SIGN:

DATE: 29-Aug-19 DATE:


SAFETY AUDIT

Job # 3173 Report prepared by: ADITYA


Order ref# Date: 29-Aug-19
Cust ref# Others: CHILLER # 2

Serial # : 12 N 400269 Model: 30GX 267 Make: CARRIER

Customer/Company M H AL MUFTAH Contact Person MR. SUJITH


Building / Location AL SAAD SPORTS CLUB Contact # 974-30023544

JOB SITE SAFETY AUDIT

DESCRIPTION YES NO N/A


is there safe access to the site? X
free from slippery floors? X
is there adequate lighting ? X
Work Area is there adequate space? X
is the noise level acceptable with appropriate PPE? X
are fire exintinguisher readily available? X
is the equipment able to be locked out / tagged out? X

is there a safe area for loading/ unloading ? X


Handling
the site is free from dangerous material handling issues? X

the job can be completed without specific risk for working heights? X
Height
all steps,platforms or scaffolding are safe? X

Others:

how do you evaluate the total risk for this job site? 0
0 = Low
Risk
1 = Avg
2 = High Need customer support

COMMENTS:

Sup/Tech Name ADITYA Customer Name

Sign Sign

Date 29-Aug-19 Date

You might also like