Well A
t0 = 0,1 menit
s2 = 0,73 meter
s1 = 0,14 meter
Δs = 0,59 meter
Q = 2000 m3/hari
2.3 Q
T=
4. π . Δs
2.30(2000)
T=
( 4 × 3,14 ) 0,59
4600
T=
7,41
T =620,78 m 2 / jam
8.308,53
S=
1030.41
S=8,06
Well B
t0 = 0.1 menit
s2 = 0,96 meter
s1= 0,5 meter
Δs = 0,46 meter
Q = 2000 m3/hari
2.3 Q
T=
4. π . Δs
2.30(2000)
T=
( 4 × 3.14 ) 0,46
4600
T=
5,77
T =797,22 m2 / jam
2,25(797,22)(0.1 x 60)
S=
( 30.8)2
10.762,47
S=
948.64
S=11,35
Well C
t0 = 0.1 menit
s2 = 0,87 meter
s1= 0,29 meter
Δs = 0,58 meter
Q = 2000 m3/hari
2.3 Q
T=
4. π . Δs
2.30(2000)
T=
( 4 × 3.14 ) 0,58
4600
T=
7,29
T =631,01 m2 / jam
8518,6
S=
136.89
S=62,22
r konstan t berubah
Rumus
2,30.Q
T=
2. π . Δs
2,25. T . t
S=
r 02
Ditanya:
s2 = 1,41 meter
s1 = 0,98 meter
Δs = 0,43 meter
Q = 2000 m3/hari
r0 = 1000 meter
2,3. Q
T=
4. π . Δs
2 , 30(2000)
T=
( 2× 3 ,14 ) 0.43
4600
T=
2,7
T =12.420 m2/hari
2,25(12.420) 50
S=
(1000)2
1.400 .625
S=
1.000 .000
S=1,4