Manufacturing Sequence Flow: Zoom in
Manufacturing Sequence Flow: Zoom in
Manufacturing Sequence Flow: Zoom in
ppt
ZOOM in
LH BOOM AND SHIP • AILERON ACTUATORS
J511 INTERNAL MATE
INSTALL • FLAPERON ACTUATORS
TAIL HOOK BAYS J515 • IPP TURBOMACHINE NOSE RADOME
SYSTEMS & TEST EXTERNAL
AND TRESSLE J520 • RUDDER ACTUATORS
FLUID SYSTEMS FINISHES J753
ASSEMBLY BOOM • H/T ACTUATORS
STRUCTURAL VERTICAL TAIL
(CTOL, CV) VERTICAL TAIL • FIRE EXTINGUISHERS
MATE, INSTALL & RUDDER TIPS EJECTION
J851 ASSEMBLY COMPLETE • FLAPERON E/Us Lockheed Martin
-
CROSS SHIP SEAT
SYSTEMS & J751 RUDDER, LEADING EDGES, BUILD-UP
ELECTRICAL RUDDERS SEAL INSTALLATION & Northrop Grumman
TEST EXTERNAL FINISHES
J510 J850
AFT FUSELAGE SUBSYSTEMS
BAE Systems
-
HORIZONTAL TAIL MATE / TAIL
LOOSE SHIP J752 ASSEMBLY COMPLETE INSTALLATION
COMPONENTS LEADING CONTROL J852 Fokker
SUB-ASSEMBLIES EDGES SURFACES HORIZONTAL TAIL
& EDGES EDGES INSTALLATION &
J611 EXTERNAL FINISHES
J620
VERTICAL TAILS
ASSEMBLE, SHIM
J612
PREP FOR
SHIPMENT &
VERTICAL TAIL
LOOSE SHIP
COMPONENTS
SUB-ASSEMBLIES
J742
TRAILING EDGES
•
•
•
•
STARTER / GENERATOR
MAIN HYDRAULIC PUMPS
SKATE ASSEMBLY
SIDE LINK
J830
FINAL
ASSEMBLY
& SYSTEMS TEST
for detail
• LUBE OIL PUMP (CTOL/CV)
& DRILL SUB- SHIP J741 • THRUST PINS
STRUCTURE J621 LEADING EDGES J831
J619 • PTMS VALVES
MILL & DRILL J630 HORIZONTAL TAIL • MAIN FUEL LINE ENGINE BUILD-UP
INNER / J613 HORIZONTAL LOOSE SHIP • ENG BLEED DUCT
OUTER EXTERNAL TAILS COMPONENTS • ESG OIL RESEVOIR
SURFACES FINISHES ASSEMBLE, • HYD HOSE ASSEMBLIES J825
J618
STRIP DOWN, (FOG) J616 SHIM & DRILL Ground Ops
DEBURR, NUT J629 SUB- (Fuel Op/Wt,
SKIN J622
PLATES & WET MILL & DRILL UPPER STRUCTURE IPP Run, Eng
INSTALLATI PREP FOR
ASSEMBLE ON / LOWER SURFACES Runs)
SHIPMENT &
(FOG) SHIP
J617
J623
SYSTEMS J628 EXTERNAL
INSTALLATION MILL & DRILL FINISHES J820
BUMP FINAL
STRUCTURE J624
EXTERNAL
(FOG) INSTALL
J627 FINISHES
UPPER SKIN,
STRIP DOWN, BUMP
DEBURR & STRUCTURE & J810
INSTALL NUT J625 J801 J805 FIELD
FAIRINGS
PLATES SYSTEMS FLIGHT LINE FINAL FINISHES OPERATIONS
J626
INSTALLATIO CTOL OPS AND RCS
WET ASSEMBLE
N & TEST J800 (AIRWORTHINE TESTING
STRUCTURE &
AIRCRAFT COMPLETE SS)
07 JANUARY 2010 INSTALL LOWER
SKIN