Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

USD

EURO

MCPI_Software Requirements

Total
SN SOFTWARE DISCIPLINE VERSION Duration
No of Licenses ManMonths
(Months)
1 AUTOCAD PROCESS 0
HSED 0
PIPING 0
STRUCTURAL 0
Latest
MECHANICAL 0
INSTRUMENTATION 0
ELECTRICAL 0
CIVIL 0
COMBUSTION 0

2 PDMS PROCESS 0
HSED 0
PIPING 0
STRUCTURAL 0
LATEST
MECHANICAL 0
INSTRUMENTATION 0
ELECTRICAL 0
CIVIL 0
CAE 0
COMBUSTION 0
3 SP3D PROCESS 0
HSED 0
PIPING expected consumption is 200 hrs. over 0
STRUCTURAL period of 8 months 0
MECHANICAL 0
INSTRUMENTATION 0
ELECTRICAL 0
CIVIL 0
0
4 SMART P & ID PROCESS 0
2014R1 / Latest
HSED 0

5 PIPESIM PROCESS 0

6 Aspen Plus ( Hysys + flarenet) PROCESS Version 10 / Latest 2 8 16

7 FLARENET (Static and Dynamic) PROCESS Part of Aspen 0


0
8 CAESER II PIPING 0

9 PELICAN FORGE PIPING 0

10 PDMS REVIEW REALITY PIPING 0


STRUCTURAL 0
INSTRUMENTATION 0
ELECTRICAL 0
CAE 0
11 NAVIS WORKS PIPING 0
INSTRUMENTATION/CIVIL 0
CIVIL/STRUCTURAL 0
ELECTRICAL 0
0
12 MARIAN/SPMAT PIPING 0

13 MDS PIPING 0
INSTRUMENTATION 0

14 SACS STRUCTURAL 0
expected software
15 GRLWEAP STRUCTURAL consumption is around 0
200 hours over a period
of 12 months.
16 BOCAD / TEKLA STRUCTURAL LATEST 0
COMBUSTION 0

17 PV ELITE MECHANICAL LATEST 0

18 MICROPROTO MECHANICAL LATEST 0

19 HTRI PROCESS 7.3.1 / Latest 2 8 16

20 EXSILENTIA INSTRUMENTATION 0

SPI - INTOOLS VERSION 2013


21 INSTRUMENTATION 0
WITH ORACLE VERSION 11G

22 VISIO INSTRUMENTATION Latest 0

23 MARIAN INSTRUMENTATION 0

24 ETAP ELECTRICAL 0

25 CHALMLITE/DIALux/LUXICON ELECTRICAL 0

26 STAAD CIVIL LATEST 0


27 Limcon Structura LATEST 0

28 SPR CIVIL 0
PIPING 0
ELECTRICAL 0
COMBUSTION 0

28 PIPENET HSED 0
28 ATF FATHOM PROCESS 0
0
30 ANSYS Structural 18.2 0

31 ECE CORROSION 0

32 SPEL CIVIL 0

33 PRO II CIVIL 0
PIPING 0
PROCESS 0

34 FRNC HSED 0
PROCESS 0
35 FOUNDATION 3D CIVIL LATEST 0

36 MAT 3D CIVIL LATEST 0

37 PRODOK INSTRUMENTATION LATEST 0

38 SPMAT Elecrical 0

39 MATHCAD COMBUSTION 0

40 Spoolgen CONSTRUCTION 0

41 3D Sim CONSTRUCTION 0

NOTES 32
1) Lease shall be Monthly (PM) Quarterly (PQ) or Annually (PA) as applicable
Sr Nos Description Descipline
1 Offshore Training Process
2 Offshore Training Piping
3 Offshore Training Pipeline
4 Offshore Training Mechanical (Static & Rotating Equipment)
5 Offshore Training Electrical
6 Offshore Training Instrumentation
7 Offshore Training Telecommunication
8 Offshore Training Civil & Structural
9 Offshore Training Construction - HO
10 Offshore Training Procurement (Buyer, Expeditor, Inspection)
11 Offshore Training Logistic
12 Offshore Training Process Safety
13 Offshore Training Document Control / Secretarial Services
14 Offshore Training Pre-Comm - Comm, Hazop, Logistic & HSED
15 Offshore Training CAE
Nos of Unity Rate in Total Price in
Persons INR INR
2 75,000 150,000
2 75,000 150,000
2 75,000 150,000
2 75,000 150,000
2 75,000 150,000
2 75,000 150,000
75,000 0
2 75,000 150,000
1 75,000 75,000
75,000 0
75,000 0
75,000 0
75,000 0
2 75,000 150,000

17 1,275,000

You might also like