The document summarizes the key performance indicators (KPIs) for maintenance, repair and testing (MRT) works in Chittoor, India for the month of March 2020. It shows the targets and actual performance for tasks like relay testing, underground fault relay testing and transformer testing. It also exceeded the target for relay testing and is on track to meet cumulative yearly targets. A daily progress report lists work done each day such as fixing meters, testing relays, replacing faulty equipment and conducting maintenance at various substations.
The document summarizes the key performance indicators (KPIs) for maintenance, repair and testing (MRT) works in Chittoor, India for the month of March 2020. It shows the targets and actual performance for tasks like relay testing, underground fault relay testing and transformer testing. It also exceeded the target for relay testing and is on track to meet cumulative yearly targets. A daily progress report lists work done each day such as fixing meters, testing relays, replacing faulty equipment and conducting maintenance at various substations.
The document summarizes the key performance indicators (KPIs) for maintenance, repair and testing (MRT) works in Chittoor, India for the month of March 2020. It shows the targets and actual performance for tasks like relay testing, underground fault relay testing and transformer testing. It also exceeded the target for relay testing and is on track to meet cumulative yearly targets. A daily progress report lists work done each day such as fixing meters, testing relays, replacing faulty equipment and conducting maintenance at various substations.
CRITICAL PARAMETERS IN Torget for the During Month Cumulative till
Remarks RESPECT OF MRT WORKS Year 2019-2020 03/2020 03/2020 MRT Sub-Division, Chittoor Target Actual Target Actual (a) Testing of Relays (No.s) 733 22 52 733 936 (b) Testing of UF Relays (No.s) 12 3 3 12 13 (c) Testing Energy Meters (No.s) 43 0 0 43 43 (d) Tanδ values of CTs, PTR 371 26 26 371 406 Bushings and Winding (No.s)
Deputy Executive Engineer
MRT Sub Division, Chittoor
KPI for the Month of March-2020
CRITICAL PARAMETERS IN Torget for the During Month Cumulative till
Remarks RESPECT OF MRT WORKS Year 2019-2020 03/2020 03/2020 MRT Sub-Division, Chittoor Target Actual Target Actual (a) Testing of Relays (No.s) 733 22 52 733 936 (b) Testing of UF Relays (No.s) 12 3 3 12 13 (c) Testing Energy Meters (No.s) 43 0 0 43 43 (d) Tanδ values of CTs, PTR 371 26 26 371 406 Bushings and Winding (No.s)
Deputy Executive Engineer
MRT Sub Division, Chittoor Daily Progress for the month of March-2020 Date From To Purpose 01.03.2020 Chittoor Sunday 02.03.2020 Chittoor To Fix Multi Function Meter for 132KV Capacitor Bank C&R Panel at 220 KV Chittoor SS 03.03.2020 Chittoor Office Work Tirupati 04.03.2020 Chittoor To attend office work at O/o EE/MRT&TRE/TPT Chittoor 05.03.2020 Chittoor Office Work Tirupati 06.03.2020 Chittoor To attend office work at O/o EE/MRT&TRE/TPT Chittoor 07.03.2020 Chittoor Office Work 08.03.2020 Chittoor Sunday
1. Replacement of CTMBs for 50 MVA PTR-II LV & 33 KV PedaPanjani Feeder at 132 KV
Punganoor SS: Punganur 2. Replacement of damaged CB indication cable for 33 KV Punganoor feeder at 132 KV 09.03.2020 Chittoor Ramasamudram Punganoor SS: Chittoor 3. For Periodical testing of Distance, O/L & E/F Relays at 132 KV Ramasamdram SS. 4. To Replace damaged DC Filter Capacitor for Battery Charger -1 at 220 KV Chittoor SS
10.03.2020 Chittoor Office Work
Santhipuram For conducting periodical Automatic Under Frequency Relay Testing at 132 KV SS, 11.03.2020 Chittoor Chittoor Santhipuram. 12.03.2020 Chittoor Office Work Kuppam 1. To conduct Tandelta test on 100 MVA PTR-1 & 2 13.03.2020 Chittoor Chittoor 2. For Periodical testing of Differential, Distance, O/L & E/F Relays at 220 KV Kuppam SS 14.03.2020 Chittoor Office Work 15.03.2020 Chittoor Sunday 1. For conducting periodical Automatic Under Frequency Relay Testing at 220 KV SS Chittoor. 16.03.2020 Chittoor 2. For shifting of some of the DC loads from Charger-I to Charger-II 3. Attended to rectify problem in ACDB at 220 KV Chittoor SS 1. To rectify the control circuit problem of circuit breaker of 132 KV Capacitor Bank at 220 Kothapalli KV SS. Chittoor. 17.03.2020 Chittoor Chittoor 2. For rectifying GPS time synchronization problem and to rectify the circuit problem of 1no. Transformer fan, at 132 KV kothapalli SS. For Replacement of failed indication Bulbs for 220 KV Kalikiri feeder C&R Panel at 220 KV 18.03.2020 Chittoor Chittoor SS 19.03.2020 Chittoor Office Work 20.03.2020 Chittoor Office Work Kothapalli 21.03.2020 Chittoor To inspect the SAS Monitor Problem at 132KV Kothapalli SS. Chittoor 22.03.2020 Chittoor Sunday 23.03.2020 Chittoor Office Work 24.03.2020 Chittoor Office Work 25.03.2020 Chittoor Office Work 26.03.2020 Chittoor Office Work 27.03.2020 Chittoor Office Work KP Mitta 28.03.2020 Chittoor To replace B-Phase CT for 33 KV S.S. Konda feeder at 132KV Kpmitta SS Chittoor To Replace Failed CTs for 33 KV Santhapeta feeder at 220 KV Chittoor SS 29.03.2020 Chittoor (Sunday) 30.03.2020 Chittoor Office Work 31.03.2020 Chittoor Office Work