This document provides details on the foundation engineering for the Al Sendian Tower project in Doha, Qatar. It involved constructing contiguous piled walls around the perimeter totaling 173 meters in length and retaining a height of 9.8 meters using 203 piles. A total of 149 piles were drilled on site with diameters ranging from 750mm to 1200mm and depths from 6 to 8 meters. Foundation construction included static load tests, integrity tests, sonic coring tests and resulted in the placement of over 2,900 cubic meters of concrete and 280 tons of reinforcement steel.
This document provides details on the foundation engineering for the Al Sendian Tower project in Doha, Qatar. It involved constructing contiguous piled walls around the perimeter totaling 173 meters in length and retaining a height of 9.8 meters using 203 piles. A total of 149 piles were drilled on site with diameters ranging from 750mm to 1200mm and depths from 6 to 8 meters. Foundation construction included static load tests, integrity tests, sonic coring tests and resulted in the placement of over 2,900 cubic meters of concrete and 280 tons of reinforcement steel.
This document provides details on the foundation engineering for the Al Sendian Tower project in Doha, Qatar. It involved constructing contiguous piled walls around the perimeter totaling 173 meters in length and retaining a height of 9.8 meters using 203 piles. A total of 149 piles were drilled on site with diameters ranging from 750mm to 1200mm and depths from 6 to 8 meters. Foundation construction included static load tests, integrity tests, sonic coring tests and resulted in the placement of over 2,900 cubic meters of concrete and 280 tons of reinforcement steel.
Contiguous Piled Wall Consultant Perimeter : 173 m AEB Qatar Retained height : 9.8 m Shoring piles : 203 nos. Main Contractor Pile details : 750 mm dia. @ 850 mm c/c, Al Balagh Trading & Contracting 13.5 m long Total length drilled : 2,823 LM Location Doha, Qatar Main Piles 900 mm dia. piles : 22 nos., to a depth of 6 m Start Date 1200 mm dia. piles : 117 nos., to a depth of 8 m October 2014 Static pile load tests : 4 nos. Completion Date Non working load tests : 4 nos. February 2015 Integrity tests : 149 nos. Sonic coring tests : 15 nos. Concrete volume : 2,969 m3 Reinforcement steel : 280.62 tons Excavation volume : 38,986 m3