Professional Documents
Culture Documents
Project Management Project Reflection
Project Management Project Reflection
Project Reflection
On
LPG Pipeline Installation and Survey Project for Gujarat To Uttar Pradesh Network
Griffith University
Assignment 1
Student Name
Student ID
1
Contents
Background of Project...........................................................................................................................3
Theoretical Definition of Project............................................................................................................3
Parent organisation’s structure.............................................................................................................3
Challenges Associated with Management.............................................................................................3
Project Lifecycle Activities.....................................................................................................................3
2
Background of Project
LPG pipeline project was initiated by the Indian Government Ministry Petroleum and Natural
Gas to obtain the reach for liquified petroleum gas to the two states including Gujrat and
Uttar Pradesh network. Furthermore, the project aims were improvement for LPG
availability; reduce LPG transportation cost, as well decrement for energy consumption and
emission process (Asian Development Bank, 2003). With this project, a long pipeline system
between two states for approximately 1,171 Km was implemented. Hence, three companies
with joint venture established to implement, design and make project objectives a successful
outcome.
3
Adopted from ((Bharat Petroleum Corporation Ltd (A), 2008); ("Indian Oil Corporation:: RTI Information
Manual", 2008))
4
requirements for pipeline setup. For example, how long in KM, which states, as well
as what natural gas will be transferred respectively. This process was documented in
form of request for proposal which was sent by organization to ministry for future
approval.
2. Definition Phase: In this phase, all the environmental and safety risk with response
plan were designed. In addition, project scoping statement was designed and sent for
approval to the Ministry. Once sealed actual implementation and survey for LPG
pipeline started in third process.
3. Execution Phase: LPG stored as liquid form is kept with pressure in steel containers,
tanks and cylinders as well as implemented under pipeline for distribution
(Mohitpour, Jenkins, & Babuk, 2006). Hence, the design, building and construction
process as per planning was executed in this step.
References
Alvi, U. (2017). The Effect of Psychological Wellbeing on Employee Job Performance:
Comparison between the Employees of Projectized and Non-Projectized
Organizations. Journal Of Entrepreneurship & Organization Management, 06(01). doi:
10.4172/2169-026x.1000206
ASIAN DEVELOPMENT BANK. (2003). LPG PIPELINE PROJECT (pp. 1-47). India.
Bharat Petroleum Corporation Ltd (A). (2008). Bharat Petroleum Corporation Ltd (A) (pp. 1-
30). Kozhikode: Indian Institute of Management Kozhikode.
Indian Oil Corporation :: RTI Information Manual. (2008). Retrieved 16 March 2020, from
https://www.iocl.com/Talktous/RTIIOCManual.aspx
Li, M., Liu, L., Li, Y., & Xu, Y. (2018). Evaluating the Risk of Natural Gas Pipeline
Operation Management in Intuitionistic Fuzzy Linguistic Environments. Mathematical
Problems in Engineering, 2018.
Han Q., Chen, L., and Liu, Y. (2018), “Tanzania's oil and gas investment
environment,” International Petroleum Economics, (1), pp. 133–139, 2014.
Mohitpour, M., Jenkins, A., & Babuk, T. (2006). Pipelining Liquefied Petroleum Gas (LPG).
Volume 1: Project Management; Design and Construction; Environmental Issues;
GIS/Database Development; Innovative Projects and Emerging Issues; Operations and
Maintenance; Pipelining in Northern Environments; Standards and
Regulations. doi:10.1115/ipc2006-10032
What is a Project? - Definition and Key Characteristics. Retrieved 16 March 2020, from
https://mymanagementguide.com/basics/what-is-a-project/
Work on Kandla-Gorakhpur LPG pipeline project to commence in April 2020 - India's first
NewsPortal on Projects. (2019). Retrieved 16 March 2020, from
https://www.projectsmonitor.com/daily-wire/work-kandla-gorakhpur-lpg-pipeline-
project-commence-april-2020/