Site Note: Kahramaa Contract-Gtc/643G/2014 Qatar Power Transmission System Expansion Phase - 12 Package S10

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

KAHRAMAA CONTRACT- GTC/643G/2014

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE -12 PACKAGE S10


CONSULTANT: WSP
CONTRACTOR: NATIONAL CONTRACTING COMPANY

SITE NOTE

Site: 132/33kV Al Waab City Metro SS


Date: 07-05-2018 Report No: S10/AWCM/SCS/018
Subject: SCS Comments- KM Page No: 1/1

OBSERVATION/COMMENTS BY THE ENGINEER TO COMPLY BY CONTRACTOR

1. Duplication of Events observed sometimes in EPC/HMI and HWS and same was resolved by the
stop and start of WinCC. To be rectified.
2. After restarting any BCU/IED, FO watchdog is getting operated and reset. Kindly rectify.
3. RP TC1 MCB off or TC1 supervision fail , CB SF6 stage 2 signal also appears. Kindly rectify.
4. While simulating Busbar In/Out Switch in Out Position, many CLEAR signals were reported in SCS.
5. While simulating O/P Relay Blocked from OUT to IN, MCU restarts.
6. Reporting of all signals with CLEAR status in SCS Event list during the restart of BCU/Relay. Kindly
rectify.
7. BCU Battery fuse fail signal shall be demonstrated by actual simulation by removing the battery
from healthy BCU under continuous run.

Received by
Issued by
Contractor Signature
07.05.2018 Abubucker S Consultant Signature
Comments compliance report by contractor:

Received by Complied by
Consultant Signature Contractor Signature

Page 1 of 1