Project Schedule
Project Schedule
Drawings and Estimates for Structures Package estimates and DTP for Modernization of Cana
Sr.Engineer
Sr.No. Description Reso
1 Collection of Data
2 Reconnaissance survey
4 Earthwork excavation
For trail pits / borrow pits and other investigation works including boulders up
to 30 cm diameter and disposing off excavated soil
i.in all kinds of soil 1
ii.in soft rock
5 Drilling
i.80 mm dia using shoe bit
ii. 76 mm dia in soft rock using diamond core bit 1
iii.47 mm dia in hard rock using diamond core bit
6 Geotechnical investigations 1
7 Detailed Project Report
i. Hydrologic calculations 1
ii. Design and Drafting 1
iii. Estimation and BOQ 1
Sr.No. Description Reso