5b - OHL Supervision Towers
5b - OHL Supervision Towers
CONTENTS
1. PURPOSE .................................................................................................................... 3
1. PURPOSE
This note specifies the good practices that the supervisors must follow on overhead line
sites, to judge the compliance / non-compliance of the foundation work done by a contractor
in charge of overhead transmission line construction.
2. APPLICABLE DOCUMENTS
- Contract(s)
- Specification(s)
4. ROUTINE SUPERVISION
The witness and hold points to be inserted are limited to:
5. PLANNED SUPERVISION
Prior to the erection work, CC will submit erection procedure detailing: works, material to be
use, erection loads, manpower to be on site.
The Engineer will check the procedure in respect with common practices and specifications
requirements.
The extent, the type and the minimum frequency of the recommended planned supervision
are listed in the sections hereafter.
Erection works will be witnessed randomly: bolts tightening, joints and plates, member
geometry, tower geometry.
Tightening should be checked randomly, as much as possible. Attention will be paid for all
connection plates, joints between main stressed members.
Verticality and Alignment of Each Erected Tower could be checked (T and L), after visual
examination (only in case of visual misalignment)
Safety will be checked on site: site supervisors to check use f safety belt (linemen on
station), wires aspect (anchors, lifting), verticality of gin pole during erection, workers not to
stay under loads and linemen (fallen objects)
Storage
Inspection
Storage Visual
Frequency: randomly
Frequency: randomly
Frequency: randomly
Frequency: randomly
Frequency: randomly
Frequency: randomly
6. SUPERVISION SHEET
See annexed document.
GIN POLE
ACCEPTANCE
N°
Member
location
N°
Member
location
N°
Member
location
N°
Member
location
N°
Member
location
N°
Member
location
N°
Member
location
N°
Member
location
N°
Member
location
Reported By Checked By Agreed By
Date Date Date
XXX kV TOWER ERECTION SUPERVISION SHEET BOLTS
NON CONFORMITY
TOWER N° TYPE
HEIGHT BE LE:
Total of Non Conform Bolts
Missing Bolts,
Screw Screw Punching Rust/ Galva
Washers, Ring Direction Tightening
Deformation Lenght (first 3m) (70mm)
fill…
N°
Member
location
N°
Member
location
N°
Member
location
N°
Member
location
N°
Member
location
N°
Member
location
N°
Member
location
N°
Member
location
Reported By Checked By Agreed By
Date Date Date
XXX kV TOWER ERECTION SUPERVISION SHEET
TOWER N° TYPE
HEIGHT BE LE:
TOWER SITE MODIFICATIONS (if ever)
Member
Description (Drifing, Drilling, Painting, Straingthening ) Status
N°