Introduction

EPCI TENDER FOR


“Medan Gas Supply-LNG Regas”

LEADER-
NISCONI

HOOK UP&
ENGINEERING PROCUREMENT CONSTRUCTION INSTALLATION
COMMISSIONING

PT BOS NISCONI/ PT. BOS NS BATAM NS SINGAPORE, PT. BOS, SEASCAPE


SEASCAPE
Project Strategic Key Plan
• Single and Dedicated Project Management Team
• PMT Based in Jakarta office
• Single Project Execution Plan
• Single HSE Plan
• Employee High Skill and Experience Engineer and
Specialist
• Managing Interface on Consortium Member
• No Redundancies Personnel
• Maximize Subcontractor Demographic Advantage
EQUIPMENT
NO Equipment Responsibility
1 Kurushio-2 Pipe lay barge Nisconi
2 Yard Fabrication NSB
3 Swamp Lay Barge Seascape/Nisconi
4 Horizontal Direct Drilling Seascape/ PT BOS
5 Offshore Pipelay and Beach-pull Seascape/ Nisconi
6 Post Trenching- Mass Flow X subsea/ Seascape
Excavator
7 Pre-trench for Extra- hard soil Seascape/ PT BOS
8 Air Dive set Seascape
RESOURCES
NO Resources Responsibility
1 PMT Nisconi, PT BOS, Seascape
2 Engineer, Designer , specialist, PT BOS
3 Installation specialist, Diver Seascape
4 Offshore Installation Manpower NISCONI, Seascape
Thank you